Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML09107022831 December 2008Guidance for Post Fire Safe Shutdown Circuit AnalysisHot Short
Safe Shutdown
Shutdown Margin
Fire Barrier
Probabilistic Risk Assessment
Coatings
Operator Manual Action
Multiple Spurious Operation
Emergency Lighting
Significance Determination Process
Thermoset
Large early release frequency
Exemption Request
Earthquake
Chernobyl
Fuel cladding
Biofouling
Fire Protection Program
ML09021037630 December 2008December 2008 OL Exam (SRO Exam with Answers)Half scram
Hydrostatic
Squib
Abnormal operational transient
Foreign Material Exclusion
Scram Discharge Volume
Severe Accident Management Guideline
Overtravel
Press Release-II-08-056, NRC Staff to Meet with TVA to Discuss Inspection of Browns Ferry Nuclear Power Plant30 December 2008Press Release-II-08-056: NRC Staff to Meet with TVA to Discuss Inspection of Browns Ferry Nuclear Power Plant
ML08365010922 December 2008Technical Specifications Change 463-T, One-time Extension of Surveillance Requirements (Srs)Shutdown Margin
Reactor Vessel Water Level
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Incorporated by reference
Scram Discharge Volume
Feedwater Controller Failure
Fuel cladding
IR 05000259/200800722 December 2008IR 05000259-08-07, 05000260-08-007 and 05000296-08-007 on 9/29/2008 - 10/24/2008, Browns Ferry Nuclear Plant, Units 1, 2 and 3, Biennial Inspection of the Identification and Resolution of ProblemsAnchor Darling
Significance Determination Process
Operability Determination
ML08365022719 December 2008Response for Additional Information Regarding Units 1, 2 and 3 - Technical Specifications Change 444 - Adoption of Changes to Standard Technical Specifications Under Technical Specification Task Force Change Number 448, Revision 3.Safe Shutdown
ML09181010019 December 2008Initial Exam 2008-302 Post Exam Comments
ML08365011319 December 2008Core Operating Limits Report (Colr), Revision 1 for Cycle 8 OperationShutdown Margin
ML09021036218 December 2008December 2008 OL Exam (RO Exam with Answers)Half scram
Hydrostatic
Squib
Foreign Material Exclusion
Scram Discharge Volume
Severe Accident Management Guideline
Overtravel
ML08353093718 December 2008Notice of Public Meeting with Browns Ferry Nuclear Plant to Discuss the Results from IP 95002 Inspection Performed During the Week of December 1, 2008
ML08353061915 December 2008Technical Specifications Change TS-431 - Extended Power Uprate - Response to Round 22 Request for Additional Information - Unit 1 Large Transient Testing (Ltt) -
ML08339052612 December 2008Verbal Relief'S Related to Instrument Line Weld Overlay (TAC MD0155 & MD0172) (1-ISI-21 and 1-ISI-22)Weld Overlay
Hydrostatic
Nondestructive Examination
Through-Wall Leak
Through Wall Leak
ML0834600218 December 2008Technical Specifications Changes TS-418 and TS-431 - Extended Power Uprate - Response to Request for Additional Information Regarding Withholding Information from Public Disclosure
ML0834402245 December 2008Units 1 & 2 - Tva'S Nuclear Quality Assurance Plan (TVA-NQA-PLN89-A)Fitness for Duty
Offsite Dose Calculation Manual
Safe Shutdown Earthquake
Coatings
Nondestructive Examination
B.5.b
Process Control Program
Fire Protection Program
ML0834003245 December 2008Dec Exam 05000259, 260, 296-08-302 Approval ML083400324
ML0834500655 December 2008Unit 1 - Technical Specifications (TS) Change TS-446 - Safety Limit Minimum Critical Power Ratio (SLMCPR) - Cycle 8 Operation - Response to Request for Additional Information (RAI)Minimum Critical Power Ratio
ML0830302202 December 2008Summary of October 14, 2008, Meeting with Tennessee Valley Authority Regarding Steam Dryer Portion of the Extended Power Uprate Review (TAC Nos. MD5262 and MD5263)
ML0918101051 December 2008Initial Exam 2008-302 Final Administrative DocumentsJob Performance Measure
ML08346002230 November 2008Enclosure 2 - Browns Ferry, Units 1, 2, & 3 - Technical Specifications Changes TS-418 and TS-431 - Extended Power Uprate - CDI Report 07-11NP, Revision 1, Dynamics of BWR Steam Dryer Components, Non-Proprietary VersionFinite Element Analysis
ML08325011630 November 2008CDI Report No. 08-20NP, Stress Assessment of Browns Ferry Nuclear Unit 2 Steam Dryer with Outer Hood and Tie-Bar Reinforcements Revision 0, Page 39 - End
ML08325011530 November 2008CDI Report No. 08-20NP, Stress Assessment of Browns Ferry Nuclear Unit 2 Steam Dryer with Outer Hood and Tie-Bar Reinforcements Revision 0, Cover Page - Page 38Finite Element Analysis
Liquid penetrant
TAC:MD935626 November 2008
ML08280032626 November 2008Tennessee Valley Authority - Decommissioning Funding Status Report - Browns Ferry (Bfn), Sequoyah (SQN) and Watts Bar (WBN) Nuclear Plants
ML08336019626 November 2008Unit 1 - American Society of Mechanical Engineers (ASME) Section XI, Inservice Inspection Program for the Second Ten-Year Inspection Interval - Request for Relief 1-ISI-21 - ResubmittalWeld Overlay
Nondestructive Examination
TAC:ME017226 November 2008
ML08338020125 November 2008American Society of Mechanical Engineers (ASME) Section XI, Inservice Inspection Program for the Second Ten-year Inspection Interval - Relief Request for 1-ISI-22Weld Overlay
Hydrostatic
VT-2
Through-Wall Leak
Through Wall Leak
TAC:ME015525 November 2008
ML08340003025 November 2008American Society of Mechanical Engineers Section XI, Inservice Inspection Program for the Second Ten-Year Inspection Interval - Request for Relief 1-ISI-21Weld Overlay
Nondestructive Examination
ML08329038724 November 2008Review of the Summary Report for Updated Final Safety Analysis Report Changes
TAC:MD879424 November 2008
ML08333018721 November 2008Notification of Potential Part 21 Re Tyco Electronics, Transfer of Information - CII-012
ML08330054520 November 2008(BFN) Units 1, 2, & 3 - Technical Specifications (TS) Change 462 - Request for Adoption of TSTF-475 Revision 1 of Control Rod Notch Surveillance Test Frequency and a Clarification of a Frequency Example Using the Consolidated Line
ML08276058317 November 2008Summary of July 18, 2008, Meeting with Tennessee Valley Authority Regarding Steam Dryer Portion of the Extended Power Uprate Review
ML08315042417 November 2008Request for Withholding Information from Public Disclosure for Browns Ferry Nuclear Plant
ML08325011414 November 2008(BFN) - Units 1, 2, & 3 - Technical Specifications (TS) Changes TS-418 & TS-431 - Extended Power Uprate (EPU) - Supplemental Response to Rounds 19 and 22 Request for Additional Information (RAI) Regarding Steam Dryers.
ML08325008314 November 2008(BFN) - Units 1, 2, and 3 - Technical Specifications (TS) Changes TS-418 and TS-431 - Extended Power Uprate (EPU) - Steam Dryer Reports
ML08324022414 November 2008Technical Specifications Changes TS-431 & TS-418 - Extended Power Uprate (EPU) - Correction to Schedule Letter Regarding EPU
TAC:MD956412 November 2008
ML08312004512 November 2008Request for Additional Information for Extended Power Uprate - Round 22 (TAC Nos. MD5262 and MD5263) (TS-431 and TS-418)Finite Element Analysis
ML08319004011 November 2008Core Operating Limits Report (Colr), for Cycle 8 OperationShutdown Margin
ML0830904046 November 2008RAI Regarding a Revision to the Minimum Critical Power RatioSafety Limit Minimum Critical Power Ratio
ML0831000036 November 2008Request for Withholding Information from Public Disclosure for Browns Ferry Nuclear Plant
ML0831002416 November 2008Request for Withholding Information from Public Disclosure
ML08325008631 October 2008CDI Report No. 08-15NP Stress Assessment of Browns Ferry Nuclear Unit 1 Steam Dryer with Tie-Bar Modifications Revision 2, Cover Page - Page 37Finite Element Analysis
Liquid penetrant
ML08325008531 October 2008CDI Report No. 08-14NP, Flow-Induced Vibration in the Main Steam Lines at Browns Ferry Nuclear Units 1 and 2, with and Without Acoustic Side Branches, and Resulting Steam Dryer Loads Revision 0.Finite Element Analysis
Flow Induced Vibration
ML08325008431 October 2008CDI Report No. 08-05NP, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Browns Ferry Nuclear Unit 2 Steam Dryer to 250 Hz, Revision 3.
ML08325009031 October 2008CDI Report No. 08-15NP Stress Assessment of Browns Ferry Nuclear Unit 1 Steam Dryer with Tie-Bar Modifications Revision 2, Page 38 - End
ML08326003431 October 2008CDI Report No. 08-04NP, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Browns Ferry Nuclear Unit 1 Steam Dryer to 250 Hz, Revision 2.
ML08312030731 October 2008Technical Specifications (TS) Changes TS-418 and TS-431, Extended Power Uprate (EPU) - Supplemental Response to Round 19 Request for Additional Information & Response to Round 22 Rai'S Regarding Steam DryersFinite Element Analysis
ML08312030830 October 2008Calculation Package 0006982.304, Extended Power Uprate Main Steam Line Strain Gauge Vibration Monitoring.Finite Element Analysis