ML03010033631 December 2002Inspection of Security Interim Compensatory Measures
TAC:MB589223 December 2002
ML02357047823 December 2002Ltr. Response to NRC Bulletin 2002-02, Reactor Pressure Vessel Head and Vessel Head Penetration Nozzle Inspection ProgramsNondestructive Examination
ML03008007317 December 2002Transmittal of Revision 38 of FNP-0-EP-0.0 - Emergency Plan for Farley Nuclear Plant
L-02-024, Clarification Regarding Request for Additional Information to 60-Day Response to NRC Bulletin 2002-01 Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity10 December 2002Clarification Regarding Request for Additional Information to 60-Day Response to NRC Bulletin 2002-01 Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity
ML0234005586 December 2002Reactor and Senior Reactor Operator Initial Examinations - Joseph M. Farley Nuclear Plant 50-348/2003-301 and 50-364/2003-301
L-02-023, Updated Interval (Second 10-Year Interval, Third Period and Third 10-Year Interval, First and Second Periods) Request for Relief No. RR-47 from 1989 ASME Code Requirements5 December 2002Updated Interval (Second 10-Year Interval, Third Period and Third 10-Year Interval, First and Second Periods) Request for Relief No. RR-47 from 1989 ASME Code Requirements
ML0234505594 December 2002February 5, 2003 Generic Fundamentals Examination Section, Administration of Written Operator Licensing ExamGeneric Fundamentals Examination
ML0234505733 December 2002Transmittal of Revision 19 of the Technical Specifications BasesHigh Radiation Area
ML0233901612 December 2002Tech Spec Pages for Amendments Nos. 158 and 149 Revising Operating Licenses by Replacing License Conditions Concerning spent-fuel Cask Limiting Devices with a Commitment to the Requirements in American National Standards InstituteSafe Shutdown
Fire Protection Program
ML0233705522 December 2002Issuance of Amendments Nos. 158 and 149 Revising Operating Licenses by Replacing License Conditions Concerning spent-fuel Cask Limiting Devices with a Commitment to the Requirements in American National Standards InstituteSafe Shutdown
Control of Heavy Loads
ML02338053627 November 2002Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times (MUHP-3010)Ultimate heat sink
Mission time
Probabilistic Risk Assessment
Large early release frequency
ML02333045727 November 2002Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times. (MUHP-3010)Ultimate heat sink
Mission time
Probabilistic Risk Assessment
Large early release frequency
ML02319000715 November 2002RAI to Farley Nuclear Plant, Units 1 & 2, 60-Day Response to Bulletin 2002-01, Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity.Boric Acid
VT-2
Pressure Boundary Leakage
ML0231100047 November 2002Relief Request, Third 10-Year Interval Inservice Inspection Program Request for Relief, TAC No. MB3776Incorporated by reference
Dissimilar Metal Weld
TAC:MB37767 November 2002
ML0336503447 November 2002Final Exercise Report for Farley Nuclear Power Plant
L-02-022, Supplemental Response for NRC Bulletin 2002-02 Reactor Pressure Vessel Head Degradation and Vessel Head Penetration Nozzle Inspection Programs4 November 2002Supplemental Response for NRC Bulletin 2002-02 Reactor Pressure Vessel Head Degradation and Vessel Head Penetration Nozzle Inspection ProgramsNon-Destructive Examination
IR 05000348/200200429 October 2002IR 05000348-02-004 & IR 05000364-02-004, on 06/30/2002 to 09/28/2002, Farley, Units 1 & 2. Other ActivitiesHigh winds
Fire Barrier
Nondestructive Examination
Temporary Modification
Significance Determination Process
Job Performance Measure
Operability Determination
Liquid penetrant
Fire Protection Program
IR 05000348/200200625 October 2002IR 05000348-02-006, IR 05000364-02-006, on 08/12/2002 - 08/16/2002 & 09/09/2002 - 09/13/2002, Farley Nuclear Plant, Units 1 & 2. Triennial Baseline Inspection of the Fire Protection ProgramHot Short
Safe Shutdown
High winds
Fire Barrier
Fire impairment
Operator Manual Action
Emergency Lighting
Significance Determination Process
Job Performance Measure
Exemption Request
Fire Protection Program
ML02287000816 October 2002Enclosures 1 & 2, Order for Interim Safeguards & Compensatory Measures for Dry Independent Spent Fuel Storage Installation & Regulatory Issuance Summary 2002-12D
ML02297044415 October 2002Revisions to Farley Emergency Plan Implementing ProceduresFitness for Duty
Grab sample
Met Tower
Foreign Material Exclusion
L-02-020, Cycle 16 Core Operating Limits Report15 October 2002Cycle 16 Core Operating Limits ReportShutdown Margin
L-02-019, Supplemental Response to NRC Bulletin 2002-02 Reactor Pressure Vessel Head Degradation and Vessel Head Penetration Nozzle Inspection Programs4 October 2002Supplemental Response to NRC Bulletin 2002-02 Reactor Pressure Vessel Head Degradation and Vessel Head Penetration Nozzle Inspection Programs