December 31, 2002 Southern Nuclear Operating Company, Inc.
ATTN:
Mr. J. B. Beasley, Jr.
Vice President P. O. Box 1295 Birmingham, AL 35201
SUBJECT:
INSPECTION OF SECURITY INTERIM COMPENSATORY MEASURES
Dear Mr. Beasley:
On August 26, 2002, the NRC staff completed its mid-cycle plant performance assessment of the Farley facility and provided you with an inspection plan detailing the inspections scheduled through September 30, 2003. At that time, you were advised that the NRC was in the process of finalizing a Temporary Instruction (TI) that would be used to review implementation of the Security Interim Compensatory Measures (ICMs) required by the Agencys Order issued on February 25, 2002, and you would be informed of the schedule for the TI inspection at a later date.
On September 13, 2002, TI 2515/148, Revision 1, Inspection of Nuclear Reactor Safeguards Interim Compensatory Measures, was issued. Subsequently, we conducted a pre-inspection audit utilizing Appendix A of the TI to obtain preliminary information on your implementation of the ICMs. With the completion of the audits at the Region II sites, we have developed an inspection schedule to complete the remaining portion of the TI, Appendices B and C, which will fully examine the details of implementation of the ICMs in the areas of security, operations, emergency planning, and information technology. The schedule for these inspections at Region II sites is enclosed. As your inspection is scheduled in January 2003, we have already been in contact with your staff to discuss the inspection conduct and logistics. In addition, the TI is being conducted in lieu of the security baseline inspections in the schedule enclosed with our August 26, 2002 letter; however, additional inspections may be scheduled later in calendar year 2003.
If you have any questions regarding the conduct or schedule of TI 2515/148 inspections, please contact me at 404-562-4653.
Sincerely,
/RA/
Anne T. Boland, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-348, 50-364 License Nos. NPF-2, NPF-8
Enclosure:
TI Inspection Schedule
SNC 2
cc w/encl:
M. J. Ajluni, Licensing Services Manager, B-031 Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution D. E. Grissette General Manager, Farley Plant Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution J. D. Woodard Executive Vice President Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution State Health Officer Alabama Department of Public Health RSA Tower - Administration Suite 1552 P. O. Box 303017 Montgomery, AL 36130-3017 M. Stanford Blanton Balch and Bingham Law Firm P. O. Box 306 1710 Sixth Avenue North Birmingham, AL 35201 William D. Oldfield SAER Supervisor Southern Nuclear Operating Company Electronic Mail Distribution
SNC 3
Distribution w/encl:
F. Rinaldi, NRR C. Evans (Part 72 Only)
RIDSNRRDIPMLIPB PUBLIC OFFICE RII RII SIGNATURE ATB C Rapp NAME A BOLAND B BONSER DATE 12/31/02 12/31/02 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO PUBLIC DOCUMENT YES NO OFFICIAL RECORD COPY DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML030100336.wpd
TI 2515/148 INSPECTION SCHEDULE Date (Week of)
Site Completed Catawba 01/06/03 Surry 01/13/03 Farley 01/27/03 St. Lucie 02/03/03 Browns Ferry 02/18/03 Brunswick 03/10/03 Summer 03/31/03 Turkey Point 04/07/03 Harris 04/14/03 Crystal River 05/12/03 Hatch 05/19/03 Robinson 06/16/03 Vogtle 06/23/03 Sequoyah 07/14/03 Watts Bar 08/04/03 McGuire 09/08/03 North Anna 09/15/03 Oconee