Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML18267A17121 September 2018NRR E-mail Capture - Final RAI from PRA Branch: Revise Technical Specifications to Increase Inverter AOT Extension (L-2018-LLA-0140)Probabilistic Risk Assessment
Large early release frequency
ML18264A01220 September 2018NRR E-mail Capture - Final RAI from I&C Branch: Revise Technical Specifications to Increase Inverter AOT Extension (L-2018-LLA-0140)
ML18271A03413 September 2018Receipt of Stephen Comley, We the People, September 6, 11 and 12 2018 Voicemail and EmailChernobyl
ML18250A3136 September 2018NRR E-mail Capture - Final RAI: Revise Technical Specifications to Increase Inverter AOT Extension (L-2018-LLA-0140)Anticipated operational occurrence
LR-N18-0091, Annual Report of Specific Activity Analysis - TS 6.9.1.5c30 August 2018Annual Report of Specific Activity Analysis - TS 6.9.1.5c
IR 05000272/201800528 August 2018Updated Inspection Plan (Inspection Reports 05000272/2018005 and 05000311/2018005)License Renewal
ML18239A28227 August 2018NRR E-mail Capture - Acceptance Review Result: Salem 1-Revision to Request for One-Time Relief for Alternative to Use of ASME Code Case N-770-2 (L-2018-LLR-0110)
ML18239A42427 August 2018NRR E-mail Capture - 4 Hour non-emergency Notification (Endangered Species)A Turtle Removed from the Unit 1 Circulating Water System (CWS) Intake Trash Racks at the Salem Generating Station
IR 05000275/201801022 August 2018NRC Component Design Bases Inspection Report 05000275/2018010 and 05000323/2018010Safe Shutdown
Significance Determination Process
Operability Determination
Power-Operated Valves
LR-N18-0080, Notification of Deviation from Electric Power Research Institute (Epri), Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guidelines (MRP-227-A)10 August 2018Notification of Deviation from Electric Power Research Institute (Epri), Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guidelines (MRP-227-A)Safe Shutdown
Aging Management
Foreign Material Exclusion
EVT-1
ML18218A5066 August 2018Cyber Security Inspection Report 05000272/2018403 and 05000311/2018403 (Cover Letter Only)Cyber Security
ML18222A1966 August 2018FEMA - Transmittal of Final After Action Report/Improvement Plan for Salem/Hope Creek Radiological Emergency Preparedness Plume Exercise Held on May 22, 2018
LR-N18-0069, Revision to Request for One-Time Relief for Reactor Vessel Cold Leg Nozzle to Safe-End Weld Examinations Inspection Interval6 August 2018Revision to Request for One-Time Relief for Reactor Vessel Cold Leg Nozzle to Safe-End Weld Examinations Inspection Interval
IR 05000272/20184036 August 2018Cyber Security Inspection Report 05000272/2018403 and 05000311/2018403 (Cover Letter Only)Cyber Security
Affidavit
ML18211A29630 July 2018Discharge Monitoring Report for June 2018NJPDES
ML18206A73027 July 2018(50-272, 50-311, 50-354), Transmittal Email 26.717 UpdatesFitness for Duty
ML18208A39827 July 2018NRR E-mail Capture - Acceptance Review: Salem 1 & 2 Extend Refueling Water Storage Tank AOT
ML18206A73127 July 2018(50-272, 50-311, 50-354), Single Positive Test Form Collected on 09/28/2016
ML18206A73227 July 2018(50-272, 50-311, 50-354), Single Positive Test Form Collected on 01/09/2017
ML18206A73327 July 2018(50-272, 50-311, 50-354), Single Positive Test Form Collected on 10/11/2017
ML18206A73427 July 2018(50-272, 50-311, 50-354), Single Positive Test Form Collected on 10/07/2016
ML18206A73527 July 2018(50-272, 50-311, 50-354), Annual Report Form for Drug Tests for 2017
ML18208A09126 July 2018NRR E-mail Capture - Acceptance Review Result: Salem 1 & 2 Revise Reactor Trip System Instrumentation, ESFAS Instrumentation, Mode of Applicability for MSIVs
IR 05000272/201800226 July 2018Integrated Inspection Report 05000272/2018002 and 05000311/2018002Fire Barrier
Tornado Missile
Internal Flooding
Enforcement Discretion
Functionality Assessment
Condition Adverse to Quality
FLEX
Operability Determination
Maintenance Rule Program
Fire Protection Program
Power change
Downpower
ML18222A19724 July 2018FEMA - Salem and Hope Creek Nuclear Generating Stations After Action Report, Exercise Date - May 22, 2018, Radiological Emergency Preparedness ProgramEarthquake
ML18201A11120 July 2018NRR E-mail Capture - Acceptance Review Results: Hope Creek, Salem 1 & 2 Revise TS to Adopt TSTF-529 (L-2018-LLA-0185)
LR-N18-0074, Enclosure 2 to LR-N18-0074, Emergency Plan Document Revisions Implemented June 25, 201818 July 2018Enclosure 2 to LR-N18-0074, Emergency Plan Document Revisions Implemented June 25, 2018Met Tower
FLEX
Severe Accident Management Guideline
B.5.b Mitigating Strategies
Earthquake
Fuel cladding
LR-N18-0070, Response to Request for Additional Information (Rai), Implementation of WCAP-14333 and WCAP~15376 Reactor Trip System Instrumentation and Engineered Safety Feature Actuation System Instrumentation System Instrumentation Test Times and ..17 July 2018Response to Request for Additional Information (Rai), Implementation of WCAP-14333 and WCAP~15376 Reactor Trip System Instrumentation and Engineered Safety Feature Actuation System Instrumentation System Instrumentation Test Times and ...Mission time
Internal Flooding
Probabilistic Risk Assessment
LR-N18-0066, Transmittal of Cyber Security Plan Revision 116 July 2018Transmittal of Cyber Security Plan Revision 1Cyber Security
ML18183A1492 July 2018Submittal of Discharge Monitoring Report for the Month of March 2018NJPDES