Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML10256049830 September 2010Issuance of Amendment No. 189, Revise Updated Safety Analysis Report to Modify Fire Protection Program for Use of Fire-Resistive Electrical CableSafe Shutdown
Fire Barrier
Fire Protection Program
WM 10-0024, Day Response to Mid-Cycle Performance Review and Inspection Plan30 September 2010Day Response to Mid-Cycle Performance Review and Inspection PlanTemporary Modification
Power change
WM 10-0026, Notification Letter Designating Balance of Plant Systems within the Cyber Security Rule Scope24 September 2010Notification Letter Designating Balance of Plant Systems within the Cyber Security Rule ScopeCyber Security
Fast acting solenoid valve
TAC:ME475722 September 2010
ET 10-0026, License Amendment Request for Deviation from Fire Protection Requirements - Reactor Coolant System Subcooling During Alternative Shutdown22 September 2010License Amendment Request for Deviation from Fire Protection Requirements - Reactor Coolant System Subcooling During Alternative ShutdownSafe Shutdown
Fuel cladding
Fire Protection Program
Coast down
ML10235017015 September 2010Review of the Results of 16th Steam Generator Tube Inservice Inspections Performed During Refueling Outage 17
ML10256025813 September 2010IR 05000482-10-006; February 16, 2008, Through July 30, 2010: Wolf Creek Generating Station, Biennial Baseline Inspection of the Identification and Resolution of ProblemsUnanalyzed Condition
Ultimate heat sink
Temporary Modification
Condition Adverse to Quality
Significance Determination Process
Through Wall Leak
Fire Protection Program
Scaffolding
Grace period
ML1024506282 September 2010Summary of Public Meeting with Wolf Creek Nuclear Operating Corporation
ML1024403511 September 2010Mid-Cycle Performance Review and Inspection Plan - Wolf Creek Generating Station
WM 10-0022, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.4, DC Sources - Operating, Surveillance Requirements 3.8.4.2 and 3.8.4.526 August 2010Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.4, DC Sources - Operating, Surveillance Requirements 3.8.4.2 and 3.8.4.5Battery sizing
ML10225019620 August 2010Letter, Notice of Withdrawal of License Amendment Request to Revise Technical Specification 3.8.1, AC Sources-Operating, for Note, Required Actions and Completion Times
ML10225020620 August 2010Notice of Withdrawal of License Amendment Request to Revise Technical Specification 3.8.1, AC Sources-Operating, for Note, Required Actions and Completion Times
ML10230043618 August 2010WC-2009-12-Draft Operating Test Comments
ML10230043818 August 2010WC-2009-12-Draft Operating TestBoric Acid
Shutdown Margin
Probabilistic Risk Assessment
Earthquake
Power change
Downpower
ML10230044118 August 2010WC-2009-12-Draft Outline Comments
ML10230064018 August 2010WC-2009-12-Public Forms
ML10218006418 August 2010Request for Additional Information, License Amendment Request to Revise TS 3.3.2, Engineered Safety Feature Actuation System Instrumentation, Table 3.3.2-1 to Identify Functions and Modes for Reactor Trip P-4 Interlock Function
ML10224058212 August 2010Notification of NRC Triennial Heat Exchanger Inspection (05000482-10-005)Ultimate heat sink
IR 05000482/201000311 August 2010IR 05000482-10-003, on 4/01/2010 - 6/30/2010; Wolf Creek Generating Station, Integrated Resident and Regional Report; Flood Protection, Operability Evaluations and Identification and Resolution of ProblemsFitness for Duty
High winds
High Radiation Area
Safe Shutdown Earthquake
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Tornado-Generated Missile
Significance Determination Process
Operability Determination
Earthquake
Biofouling
Through-Wall Leakage
Fire Protection Program
Substantial potential for overexposure
Substantial potential for an overexposure
Downpower
Siren
Overexposure
ML11070015111 August 2010E-mail from B. Grenier, NRR to K. Sullivan, BNL J-4242A Period of Performance
WO 10-0053, Letter Withdrawal of License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating.10 August 2010Letter Withdrawal of License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating.
ML1021800656 August 2010Notice of Meeting with Wolf Creek Nuclear Operating Corporation to Present an Update on the Initiatives Being Implemented to Improve Station Performance
ML1021702995 August 2010Acceptance Review Email License Amendment Request for Approval of the Cyber Security PlanCyber Security
TAC:ME42655 August 2010
ML1021002272 August 2010Withdrawal of License Amendment Request for Approval of the Cyber Security PlanCyber Security
ML10204001423 July 2010Acceptance Review, Request for Alternative to ASME Code Case N-579, Use of Nonstandard Nuts, Class 1, 2, and 3, Mc, CS Components and Supports Construction, Section III, Division 1.
ML10082051723 July 2010Issuance of Amendment No. 188, Revise Technical Specifications for Use of Beacon Power Distribution Monitoring System
WO 10-0049, Response to NRC Regulatory Issue Summary (RIS) 2010-08, Preparation and Scheduling of Operator Licensing Examinations.22 July 2010Response to NRC Regulatory Issue Summary (RIS) 2010-08, Preparation and Scheduling of Operator Licensing Examinations.Generic Fundamentals Examination
WO 10-0048, Revision to Renewed Facility Operating License and Request for Approval of the Cyber Security Plan19 July 2010Revision to Renewed Facility Operating License and Request for Approval of the Cyber Security PlanCyber Security
Incorporated by reference
Fuel cladding
ET 10-0021, Response to Request for Additional Information Regarding the Sixteenth Steam Generator Tube Inservice Inspection15 July 2010Response to Request for Additional Information Regarding the Sixteenth Steam Generator Tube Inservice Inspection
IR 05000482/20104029 July 2010IR 0500482-10-402, on 06/24/2010, for Wolf Creek Generating Station, Security InspectionAffidavit
ML1018303832 July 2010IR 05000482-10-007, on 08/16/2010, Wolf Creek - Initial Information Request for NRC Triennial Baseline Component Design Bases Inspection
ML11285A4171 July 2010Single Positive Test Form, for Cause, Collected on 06/22/2010