NOC-AE-10002607, License Renewal Application, Environmental Report | 30 September 2010 | License Renewal Application, Environmental Report | Safe Shutdown High winds Loop seal Ultimate heat sink Fire Barrier Tornado Missile Internal Flooding Hydrostatic Probabilistic Risk Assessment Incorporated by reference Aging Management Large early release frequency License Renewal Turbine Missile Environmental Justice Uranium Hexafluoride |
ML102950191 | 30 September 2010 | Abb Inc., 10CFR Part 21 Notification of Potential Defect, 27H Relay, 411R0175-DP-1E and 411R0175-1E | |
ML102770418 | 30 September 2010 | Part 21 Report on Solid State Relays | |
M100929, SRM-M100929A - Affirmation Session: I. SECY-10-0065 - South Texas Project Nuclear Operating Co...Ii. SECY-10-0071 - Luminant Generation Company Llc..Iii. SECY-10-0087 - Tennessee Valley Authority... | 29 September 2010 | SRM-M100929A - Affirmation Session: I. SECY-10-0065 - South Texas Project Nuclear Operating Co...Ii. SECY-10-0071 - Luminant Generation Company Llc..Iii. SECY-10-0087 - Tennessee Valley Authority... | |
NOC-AE-10002604, Amended Request for Relief from ASME Section XI Code Requirements for Weld Examinations (Relief Request RR-ENG-2-55) | 29 September 2010 | Amended Request for Relief from ASME Section XI Code Requirements for Weld Examinations (Relief Request RR-ENG-2-55) | |
ML102720768 | 29 September 2010 | SRM-M100929A - Affirmation Session: I. SECY-10-0065 - South Texas Project Nuclear Operating Co...Ii. SECY-10-0071 - Luminant Generation Company Llc..Iii. SECY-10-0087 - Tennessee Valley Authority... | |
NOC-AE-10002602, Notification Letter Designating Balance of Plant Systems within the Cyber Security Rule Scope | 23 September 2010 | Notification Letter Designating Balance of Plant Systems within the Cyber Security Rule Scope | Cyber Security |
TAC:ME4766 | 20 September 2010 | ||
TAC:ME4764 | 20 September 2010 | ||
TAC:ME4762 | 20 September 2010 | ||
NOC-AE-10002594, Request for Relief from ASME Section XI Code Requirements for Pump Casing Inservice Inspection Examination (Relief Request RR-ENG-3-03) | 20 September 2010 | Request for Relief from ASME Section XI Code Requirements for Pump Casing Inservice Inspection Examination (Relief Request RR-ENG-3-03) | Nondestructive Examination |
NOC-AE-10002592, Request for Relief from ASME Section Xl Code Requirements for Steam Generator Nozzle Non-Destructive Examination (Relief Request RR-ENG-3-01) | 20 September 2010 | Request for Relief from ASME Section Xl Code Requirements for Steam Generator Nozzle Non-Destructive Examination (Relief Request RR-ENG-3-01) | Nondestructive Examination |
NOC-AE-10002593, Request for Relief from ASME Section Xl Code Requirements for Reactor Pressure Vessel Flange Insert Non-Destructive Examination (Relief Request RR-ENG-3-02) | 20 September 2010 | Request for Relief from ASME Section Xl Code Requirements for Reactor Pressure Vessel Flange Insert Non-Destructive Examination (Relief Request RR-ENG-3-02) | Nondestructive Examination |
ML102590498 | 13 September 2010 | Nonacceptance with Opportunity Supplement Email, Relief Request RR-ENG-2-55 from ASME Code Requirements for Weld Examinations, Second 10-Year Inservice Inspection | |
ML102520304 | 9 September 2010 | E-mail South Texas Project, Units 1 and 2 - Acceptance Review Email, License Amendment Request to Revise License Condition and Approve Cyber Security Plan | Cyber Security |
ML102150077 | 2 September 2010 | Relief Request Nos. VRR-01, PRR-03, PRR-02, and PRR-01 for Third 10-year Interval Inservice Testing Program for Pumps and Valves (TAC Nos. ME3515 Through ME3522) | Stroke time Probabilistic Risk Assessment Large early release frequency |
ML102440391 | 1 September 2010 | Mid-Cycle Performance Review and Inspection Plan - South Texas Project Electric Generating Station | |
ML102300445 | 27 August 2010 | Notice of Conference Call with STP Nuclear Operating Corp., to Discuss Request for Additional Information for Generic Letter 2004-02 | |
ML102300483 | 18 August 2010 | ST-2010-05-Draft Written Exam | Safe Shutdown Boric Acid Shutdown Margin Offsite Circuit Power change |
ML102300480 | 18 August 2010 | ST-2010-05-Draft Written Exam Comments | Safe Shutdown Boric Acid Shutdown Margin Offsite Circuit |
ML102300478 | 18 August 2010 | ST-2010-05-FINAL Outlines | |
ML102300477 | 18 August 2010 | ST-2010-05-Draft Outlines | |
ML102300469 | 18 August 2010 | ST-2010-05-Draft Outline Comments | |
ML102290230 | 17 August 2010 | Withdrawal of Amendment Request for Approval of the Cyber Security Plan | Cyber Security |
ML102180339 | 5 August 2010 | Ltr to E. Halpin Re Participation in Commission Meeting on the Resolution of Generic Safety Issue (GSI) - 191, Assessment of Debris Accumulation on Pressurized Water Reactor (PWR) Performance on 09/29/10 | |
ML102170470 | 5 August 2010 | Acceptance Review E-mail, License Amendment Request, Revise Action Requirement in Technical Specification 3.7.7, Control Room Makeup and Cleanup Filtration Systems | |
IR 05000498/2010003 | 4 August 2010 | IR 05000498-10-003, 05000499-10-003 on 04/01/10 - 06/30/10 for South Texas Project Electric Generating Station, Units 1 and 2, Integrated Resident and Regional Report, Operability Evaluations, Identification and Resolution of Problems | Safe Shutdown Unanalyzed Condition Boric Acid High Radiation Area Non-Destructive Examination Water Inventory Control Weld Overlay Internal Flooding Probabilistic Risk Assessment Nondestructive Examination Temporary Modification Significance Determination Process Code Reconciliation Biofouling Fire Protection Program Dissimilar Metal Weld Scaffolding Substantial potential for overexposure Power change |
ML102110270 | 4 August 2010 | Enclosure 6: STP Nuclear Operating Company - South Texas Project Presentation | |
NOC-AE-10002585, Inservice Inspection Summary Report - 2RE14 | 2 August 2010 | Inservice Inspection Summary Report - 2RE14 | |
TAC:ME4514 | 29 July 2010 | ||
NOC-AE-10002577, Notification of Upgrading of the Inservice Inspection Program for the Third Inspection Interval | 29 July 2010 | Notification of Upgrading of the Inservice Inspection Program for the Third Inspection Interval | Weld Overlay Hydrostatic Nondestructive Examination VT-2 Incorporated by reference |
NOC-AE-10002578, Request for Relief from ASME Section XI Code Requirements for Weld Examinations (Relief Request RR-ENG-2-55) | 29 July 2010 | Request for Relief from ASME Section XI Code Requirements for Weld Examinations (Relief Request RR-ENG-2-55) | Nondestructive Examination |
NOC-AE-10002568, Submittal of License Amendment Request for Approval of Cyber Security Plan | 27 July 2010 | Submittal of License Amendment Request for Approval of Cyber Security Plan | Safe Shutdown Cyber Security Incorporated by reference Fuel cladding Fire Protection Program |
NOC-AE-10002579, Nine-Month Supplemental Response to Generic Letter 2008-01 | 27 July 2010 | Nine-Month Supplemental Response to Generic Letter 2008-01 | Scaffolding |
NOC-AE-10002581, Operator Licensing National Examination Schedule. | 26 July 2010 | Operator Licensing National Examination Schedule. | Generic Fundamentals Examination |
NOC-AE-10002573, Licensee Clarification Letter, Regarding an Approved Exemption from Specific Requirements of Title 10 of the Code of Federal Regulations Part 26 (TAC Nos. ME2259/ME2260) | 21 July 2010 | Licensee Clarification Letter, Regarding an Approved Exemption from Specific Requirements of Title 10 of the Code of Federal Regulations Part 26 (TAC Nos. ME2259/ME2260) | Fitness for Duty Exemption Request |
ML101960143 | 15 July 2010 | Email, Request for Additional Information LAR for Residual Heat Removal System Changes | |
NOC-AE-10002565, Inservice Testing Program Description: Safety-Related Seismic Restraints (Snubbers) for the Third 10-Year Interval | 13 July 2010 | Inservice Testing Program Description: Safety-Related Seismic Restraints (Snubbers) for the Third 10-Year Interval | |
ML101580250 | 6 July 2010 | Notice of Planned Withdrawal of Funds from Nrg South Texas Nuclear Decommissioning Trust Subaccounts | |
ML101690114 | 2 July 2010 | Exemption from Certain Requirements of 10 CFR Part 26 Revised Fitness for Duty Rule Regarding Managing Fatigue During Severe Weather Conditions | Safe Shutdown Fitness for Duty High winds Exemption Request |
ML101690107 | 2 July 2010 | Letter, Exemption from Certain Requirements of 10 CFR Part 26 Revised Fitness for Duty Rule Regarding Managing Fatigue During Severe Weather Conditions | Safe Shutdown Fitness for Duty High winds Exemption Request |
NRC-2010-0162, South Texas Project, Units 1 and 2 - Exemption from Certain Requirements of 10 CFR Part 26 Revised Fitness for Duty Rule Regarding Managing Fatigue During Severe Weather Conditions | 2 July 2010 | South Texas Project, Units 1 and 2 - Exemption from Certain Requirements of 10 CFR Part 26 Revised Fitness for Duty Rule Regarding Managing Fatigue During Severe Weather Conditions | Safe Shutdown Fitness for Duty High winds Exemption Request |