Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
CNL-23-008, Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions | 22 December 2022 | Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions | |
ML23003A026 | 21 December 2022 | Tennessee Multi-Sector Permit (Tmsp), 2022 Annual Discharge Monitoring Report for Outfalls SW-17, SW-19, and SW-21 | |
ML22353A066 | 19 December 2022 | Response to Request for Supplemental Information (D-RSI) Request for Exemption from Non-Destruction-Examination Compliance | Nondestructive Examination Finite Element Analysis Exemption Request Liquid penetrant |
ML22348A097 | 14 December 2022 | NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) | |
ML22348A044 | 13 December 2022 | NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) | Pressure Boundary Leakage |
ML22347A081 | 13 December 2022 | Annual Non-Radiological Environmental Operating Report 2022 | |
ML22346A271 | 12 December 2022 | International - Supporting Document for Sequoyah Nuclear Plant ISFSI Exemption Request | Nondestructive Examination Exemption Request |
ML22346A273 | 12 December 2022 | International - Attachment 2 - Affidavit of Kimberly Manzione | |
ML22343A069 | 8 December 2022 | NRR E-mail Capture - Request for Additional Information - Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) | Anticipated operational occurrence |
ML22271A914 | 7 December 2022 | Issuance of Amendment Nos. 324, 347, and 307; 360 and 354; 157 and 65 Regarding a Revision to the Emergency Action Level Scheme | Operating Basis Earthquake Earthquake |
ML22304A186 | 1 December 2022 | Revised Authorization of Alternative Request RV-02 for Pressure Isolation Valve Seat Leakage | Boric Acid Incorporated by reference Surveillance Frequency Control Program |
ML22312A352 | 1 December 2022 | Revised - Summary of Regulatory Audit for Alternative Request RV-02 | Incorporated by reference |
CNL-22-106, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operat | 28 November 2022 | Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operatio | |
ML22332A463 | 28 November 2022 | Cycle 26 Core Operating Limits Report | Shutdown Margin Surveillance Frequency Control Program |
ML22348A043 | 28 November 2022 | NRR E-mail Capture - State Consultation - Sequoyah Nuclear Plant, Units 1 and 2, License Amendment Request to Modify the Approved 10 CFR 50.69 Categorization Process (L-2022-LLA-0033) | Probabilistic Risk Assessment |
ML22327A141 | 22 November 2022 | 10 CFR 50.46 Annual and 30-Day Report of Changes in Peak Cladding Temperatures (PCT) | |
ML22318A149 | 18 November 2022 | Enclosure- Request for Supplemental Information A149 | Finite Element Analysis Exemption Request |
ML22322A107 | 18 November 2022 | 2023-301 Sequoyah - Licensed Operator Retake Initial Examination Corporate Notification Letter | |
ML22318A148 | 18 November 2022 | Letter - Request for Supplemental Information Pertaining to Sequoyah ISFSI August 4, 2022 Exemption Request A148 | Nondestructive Examination Exemption Request |
ML22313A114 | 9 November 2022 | Emergency Plan Implementing Procedure Revisions. Includes EPIP-6, Revision 57 & EPIP-8, Revision 24 | |
IR 05000327/2022003 | 7 November 2022 | Integrated Inspection Report 05000327/2022003 and 05000328/2022003 | Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Functionality Assessment Operability Determination Fire Protection Program |
ML22284A007 | 7 November 2022 | Authorization of Alternative Request RP-12 for Testing of Centrifugal Charging Pump 1B-B | Incorporated by reference Surveillance Frequency Control Program |
CNL-22-099, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update | 31 October 2022 | Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update | |
CNL-22-104, Correction to Response to Request for Additional Information Regarding Sequoyah Nuclear Plant, Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RV-02 | 31 October 2022 | Correction to Response to Request for Additional Information Regarding Sequoyah Nuclear Plant, Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RV-02 | |
ML22276A161 | 24 October 2022 | Issuance of Amendment Nos. 359, 353, 155, & 63 Regarding Adoption of TSTF Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections | Post Accident Monitoring Nondestructive Examination Cyber Security Fire Protection Program |
IR 05000327/2022401 | 18 October 2022 | Material Control and Accounting Program Inspection Report 05000327/2022401 and 05000328/2022401 | Affidavit |
CNL-22-098, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC EPIP-7, Rev. 45 & CECC EPIP-8, Rev. 55 | 17 October 2022 | Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC EPIP-7, Rev. 45 & CECC EPIP-8, Rev. 55 | |
ML22272A568 | 12 October 2022 | Authorization of Alternatives to Certain Inservice Testing Requirements in the American Society of Mechanical Engineers Operating and Maintenance Code | Incorporated by reference |
CNL-22-004, Completion of Actions Required by NRC Confirmatory Order EA-17-022 | 5 October 2022 | Completion of Actions Required by NRC Confirmatory Order EA-17-022 | |
ML22259A204 | 29 September 2022 | Correction to Amendment Nos. 358 and 352 Regarding Technical Specifications Task Force Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B | High Radiation Area Surveillance Frequency Control Program Offsite Circuit |
ML22263A375 | 29 September 2022 | Authorization of Alternative Request RV-02 for Pressure Isolation Valve Seat Leakage | Boric Acid Incorporated by reference Surveillance Frequency Control Program |
ML22263A008 | 28 September 2022 | Audit Summary Request for Alternative RV-02 - PIV Leakage | Incorporated by reference |
ML22263A284 | 20 September 2022 | Emergency Plan Implementing Procedure Revision. Includes EPIP 1, Revision 58, Emergency Plan Classification Matrix | |
CNL-22-084, Response to Request for Additional Information Regarding License Amendment Request to License Amendment Request to Modify Approved 10 CFR 50.69 Categorization Process (SQN-TS-21-07) | 16 September 2022 | Response to Request for Additional Information Regarding License Amendment Request to License Amendment Request to Modify Approved 10 CFR 50.69 Categorization Process (SQN-TS-21-07) | Internal Flooding Probabilistic Risk Assessment Large early release frequency |
ML22257A062 | 14 September 2022 | Requalification Program Inspection - Sequoyah Nuclear Plant | Job Performance Measure |
ML22255A025 | 12 September 2022 | Submittal of Discharge Monitoring Report (Dmr), August 2022 | |
ML22255A084 | 9 September 2022 | Document Request for Sequoyah Nuclear Plant - Radiation Protection Inspection - Inspection Report 2022-04 | Offsite Dose Calculation Manual |
ML22251A119 | 8 September 2022 | Discharge Monitoring Report (DMR) Quality Assurance Study 42 Final Report 2022 | |
ML22251A115 | 8 September 2022 | Discharge Monitoring Report for July 2022 | |
CNL-22-085, Response to Request for Additional Information Regarding Sequoyah Nuclear Plant (Sqn), Units 1 and 2 and Watts Bar Nuclear Plant (Wbn), Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Al | 2 September 2022 | Response to Request for Additional Information Regarding Sequoyah Nuclear Plant (Sqn), Units 1 and 2 and Watts Bar Nuclear Plant (Wbn), Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alte | |
IR 05000327/2022005 | 30 August 2022 | Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327 2022005 and 05000328 2022005 - Final | Fitness for Duty Cyber Security Exemption Request COVID-19 |
ML22210A118 | 24 August 2022 | Issuance of Amendment Nos. 358 and 352 Regarding Technical Specifications Task Force Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B | Safe Shutdown High Radiation Area Tornado Missile Internal Flooding Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Surveillance Frequency Control Program Large early release frequency Maintenance Rule Program Offsite Circuit |
CNL-22-053, Response to Request for Additional Information Regarding Application to Revise Sequoyah Nuclear Plant Units 1 and 2 Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis - Second Partial Response to Additional Requ | 22 August 2022 | Response to Request for Additional Information Regarding Application to Revise Sequoyah Nuclear Plant Units 1 and 2 Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis - Second Partial Response to Additional Reques | |
ML22227A071 | 15 August 2022 | NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 (EPID L-2022-LLA-0103) - Corrected | |
ML22227A026 | 12 August 2022 | NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 | |
ML22224A035 | 12 August 2022 | Regulatory Audit Questions - Request for Alternative to ASME Operation and Maintenance Code Subsection ISTC-3630 | |
ML22227A027 | 11 August 2022 | NRR E-mail Capture - Request for Additional Information Related to Alternative Requests RP-11 for Sequoyah Nuclear Plant, Units 1 and 2, and IST-RR-9 for Watts Bar Nuclear Plant, Units 1 and 2 | |
CNL-22-077, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions | 11 August 2022 | Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions | |
ML22223A126 | 11 August 2022 | News Release-II-22-022: NRC Names New Resident Inspector at Sequoyah Nuclear Power Plant | New Resident Inspector |
ML22220A107 | 9 August 2022 | Regulatory Audit in Support of Review of the Request for Alternative to American Society of Mechanical Engineers Operation and Maintenance Code |