ML22313A114
| ML22313A114 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 11/09/2022 |
| From: | Marshall T Tennessee Valley Authority |
| To: | Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation, Document Control Desk |
| References | |
| Download: ML22313A114 (1) | |
Text
Sequoyah Nuclear Plant, Post Office Box 2000, Soddy Daisy, Tennessee 37384 November 9, 2022 10 CFR 50.54(q) 10 CFR 72.44(f)
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327, 50-328, and 72-034
Subject:
Emergency Plan Implementing Procedure Revisions In accordance with the requirements of 10 CFR 50.54(q) and 10 CFR 72.44(f), the Tennessee Valley Authority is submitting a description of changes to the Sequoyah Nuclear Plant (SQN)
Radiological Emergency Plan. The affected documents are the SQN Emergency Plan Implementing Procedures (EPIPs) listed below.
EPIP Revision Title Effective Date(s) 6 57 Activation and Operation of the Technical Support Center October 17, 2022 8
24 Personnel Accountability and Evacuation October 17, 2022 The above referenced revisions were evaluated in accordance with 10 CFR 50.54(q)(3) and 10 CFR 72.44(f). It was determined that the changes do not reduce the effectiveness of the Emergency Plan. Details of the revisions are included in the enclosure.
There are no new regulatory commitments contained in this letter. Should you have any questions concerning this submittal, please contact Mr. Paul Gain, Site Emergency Preparedness Manager, at (423) 843-7088.
Respectfully, Thomas B. Marshall Site Vice President Sequoyah Nuclear Plant Marshall, Thomas B.
Digitally signed by Marshall, Thomas B.
Date: 2022.11.09 14:16:22 -05'00'
U.S. Nuclear Regulatory Commission Page 2 November 9, 2022
Enclosure:
SQN Units 1 & 2 Description of Revision/Change cc:
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Sequoyah Nuclear Plant NRC Director - Division of Fuel Management, NMSS
ENCLOSURE: SQN UNITS 1 & 2 DESCRIPTION OF REVISION/CHANGE EPIP-6, Revision 57 x
Added item to Radiation Protection Manager Checklist to ensure information related to Dose Assessment is reviewed in WebEOC in Attachment 9.
EPIP-8, Revision 24 x
Added clarifying information on how to activate sirens from the Shift Managers desk.
x Added step to Nuclear Security Assembly and Accountability Actions Appendix to release plant personnel from their areas when it is determined that an evacuation is not necessary.