Issue date | Title | Topic | |
---|---|---|---|
PMNS20221301, Presubmittal Meeting with Constellation Energy Generation, LLC About Planned Digital Installation Support License Amendment Request for Limerick Generating Station, Units 1 and 2 | 23 December 2022 | Presubmittal Meeting with Constellation Energy Generation, LLC About Planned Digital Installation Support License Amendment Request for Limerick Generating Station, Units 1 and 2 | Exemption Request |
ML23060A166 | 20 December 2022 | Acceptance Review: Adopt TSTF-477, Revision 3-Acceptance Letter | |
ML22354A262 | 20 December 2022 | NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI | |
ML23003A170 | 15 December 2022 | Official Transcript of the 12/15/22 Meeting with Constellation Energy to Discuss the Exceptions Described for the Independence and Operating Bypass with IEEE 603 of the Proposed Plant Protection System in the Limerick Station, Units 1 and 2 | |
ML22347A153 | 13 December 2022 | Public Meeting Presentation, December 15, 2022 Di&C License Amendment Request | |
PMNS20221245, Meeting Between NRC and Constellation Energy to Discuss the Exceptions Described for the Independence and Operating Bypass with IEEE-603 of the Proposed Plant Protection System in the Limerick Station, Units 1 and 2 Digital LAR | 13 December 2022 | Meeting Between NRC and Constellation Energy to Discuss the Exceptions Described for the Independence and Operating Bypass with IEEE-603 of the Proposed Plant Protection System in the Limerick Station, Units 1 and 2 Digital LAR | |
ML22339A064 | 9 December 2022 | Generation Station, Unit Nos. 1 and 2 Acceptance of Requested Licensing Action Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System | |
ML22327A019 | 6 December 2022 | Summary of November 10, 2022, Meeting with Constellation Energy Generation, Lic on Acceptance Review of Limerick Digital Instrumentation and Controls License Amendment Requests | |
ML23017A112 | 5 December 2022 | Final QA Related Forms | Job Performance Measure |
ML22335A032 | 1 December 2022 | Operator Licensing Examination Approval | |
ML22293B805 | 30 November 2022 | Constellation Energy Generation, Llc_Fleet - Request to Authorize Use Honeywell Mururoa V4F1 R Supplied Air Suits | Mururoa |
RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI | 30 November 2022 | Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI | Incorporated by reference |
ML22333A817 | 29 November 2022 | Response to Supplemental Information Needed for Acceptance of Digital Instrumentation and Controls License Amendment Requests for the Limerick Generating Station | Squib Cyber Security |
ML22320A113 | 21 November 2022 | Generation Station, Units 1 and 2 - Supplemental Information Needed for Acceptance of Digital Instrumentation and Controls License Amendment Requests | |
ML22321A105 | 17 November 2022 | License Amendment Request for Application to Adopt TSTF-477, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems and Associated Technical Specification Changes | Safe Shutdown Internal Flooding FLEX Surveillance Frequency Control Program Recently irradiated fuel |
ML22320A559 | 16 November 2022 | 2022 Annual Report - Guarantees of Payment of Deferred Premiums | |
LG-22-101, Annual Commitment Change Summary Report | 14 November 2022 | Annual Commitment Change Summary Report | |
ML22319A001 | 14 November 2022 | Constellation Energy Generation, Llc'S Presentation for November 10, 2022 Public Meeting with NRC | Incorporated by reference |
ML22312A440 | 10 November 2022 | Public Meeting with Constellation About Acceptance Review: Status of NRC Staff'S Acceptance Review of the Limerick Digital Instrumentation and Controls License Amendment Request | |
ML22308A239 | 8 November 2022 | Documentation of Approval for Longer Review Period for Limerick Digital Instrumentation and Control License Amendment Requests Acceptance Review | |
IR 05000352/2022003 | 7 November 2022 | Integrated Inspection Report 05000352/2022003 and 05000353/2022003 | Internal Flooding Temporary Modification Functionality Assessment Operability Determination Severe Accident Management Guideline Fire Protection Program |
PMNS20221157, Meeting Between NRC and Constellation Energy Generation, LLC Regarding Ongoing Acceptance Review of Limerick Generating Station, Units 1 and 2 Digital Instrumentation and Controls License Amendment Request | 7 November 2022 | Meeting Between NRC and Constellation Energy Generation, LLC Regarding Ongoing Acceptance Review of Limerick Generating Station, Units 1 and 2 Digital Instrumentation and Controls License Amendment Request | |
ML22307A060 | 3 November 2022 | EN 56200 - Fairbanks Morse Re Basic Component Which Fails to Comply or Contains a Defect | |
ML22304A001 | 29 October 2022 | 10 CFR 50.46 Annual Report | |
ML22301A174 | 28 October 2022 | Global Nuclear Fuel Americas, LLC (GNF) - Part 21 60-Day Interim Report Notification: GNF3 Raised Water Rod (SC-22-04 Rt) | |
ML22290A095 | 19 October 2022 | Constellation Energy Generation, LLC - Fleet Project Manager Reassignment | |
IR 05000352/2022402 | 18 October 2022 | Security Baseline Inspection Report 05000352/2022402 and 05000353/2022402 | Operability Determination |
ML22278A599 | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Drawing M-0009, Sheet 9, Rev. 7, Pid Circulating Water | |
ML22278A592 | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Drawing M-0020, Sheet 5, Rev. 45, P&ID Fuel Diesel Oil Storage Transfer | |
ML22278A598 | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Drawing M-14, Revision 35, Sheet 1, P&ID Turbine Enclosure Cooling Water (Unit 1) | |
ML22278A588 | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Drawing M-10, Sheet 01, Rev. 65, P&ID Service Water | |
ML22278A590 | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Drawing M-08, Sheet 01, Rev. 44, P&ID Condensate and Refueling Water Storage | |
ML22278A594 | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Drawing M-06, Sheet 07, Rev. 08, P&ID Feedwater | |
ML22278A589 | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Drawing M-0015, Sheet 0018, Rev 014, P&ID Compressed Air Instrument Air Compres | |
ML22278A593 | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Drawing M-04, Rev. 39, Sheet 3, P&ID Vents & Drains: Heaters 3, 4, 5, & 6 (Unit 1) | |
ML22278A597 | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Drawing M-15, Revision 46, Sheet 15, P&ID Compressed Air (Service Air: Reactor Enclosure, Unit 1) | |
ML22278A595 | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Drawing M-0006, Sheet 9, Rev. 14, P&ID Hydrogen Water Chemistry System Unit 1, 2, and Common | |
ML22278A596 | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Drawing M-0007, Rev. 26, Sheet 3, Pid Air Removal and Sealing Steam | |
ML22278A591 | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Drawing M-10, Sheet 01, Rev. 69, P&ID Service Water | |
ML22278A600 | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Drawing M-0015, Sheet 33, Rev. 5, PID-Compressed Air Inst | |
ML22278A584 | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Drawing M-0020, Sheet 6, Rev. 54, P&ID-Fuel Diesel Oil Storage Transfer Star | |
ML22278A581 | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Drawing M-20, Revision 39, Sheet 3, P & I Diagram Fuel & Diesel Oil Storage & Transfer (Fuel Oil & Transfer System Unit 1) | |
ML22278A583 | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Drawing M-0002, Sheet 01, Rev. 042, P&ID Extraction Steam | |
ML22278A585 | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Drawing Fd M-0081, Rev. 8, Sheet 1, Functional Description Miscellaneous Structures-HVAC | |
ML22278A586 | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Drawing M-0015, Sheet 12, Rev. 43, Pid Compressed Air Inst Air Reactor Enclosure | |
ML22278A582 | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Drawing No. M-0001, Sheet 0003, Rev 028, P&ID Main Steam (Unit 2) | |
ML22278A587 | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Drawing Fd M-0076, Rev. 11, Sheet 1, Functional Description Reactor Enclosure-HVAC |