Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
AEP-NRC-2022-66, Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring | 15 December 2022 | Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring | Post Accident Monitoring |
ML22343A175 | 14 December 2022 | Pre-Application Public Meeting for Proposed License Amendment to Revise the CNP Emergency Plan - December 14, 2022 (Slides) | |
AEP-NRC-2022-46, Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in | 12 December 2022 | Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in | Pandemic COVID-19 |
ML22340A209 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System | Loop seal Zebra Mussel Earthquake Turbine Missile |
ML22340A178 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 9, Tables | Boric Acid Hydrostatic |
ML22340A167 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 14.1, Core and Coolant Boundary Protection Analysis (Unit 2) | Boric Acid Shutdown Margin Fuel cladding Power change |
ML22340A170 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 3, Reactor (Unit 2) | Boric Acid Shutdown Margin Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Design basis earthquake Earthquake Fuel cladding Power change Flow Induced Vibration |
ML22340A215 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 1, Figures (Redacted) | |
AEP-NRC-2022-62, 1 to Updated Final Safety Analysis Report, Chapter 14.3, Reactor Coolant System Pipe Rupture (Loss of Coolant Accident) (Unit 1) | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 14.3, Reactor Coolant System Pipe Rupture (Loss of Coolant Accident) (Unit 1) | Boric Acid Shutdown Margin Loop seal Mission time Fire Barrier Hydrostatic Coatings Earthquake Fuel cladding |
ML22340A213 | 30 November 2022 | R1900-0024-001, Revision 13, NFPA 805 Nuclear Safety Capability Assessment | |
ML22340A205 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 1, Tables | Hydrostatic |
ML22340A204 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 15, Supplement for Renewed Operating Licenses | Boric Acid Non-Destructive Examination Fire Barrier Coatings Nondestructive Examination Aging Management License Renewal Exemption Request Earthquake Control of Heavy Loads Biofouling Fire Protection Program |
ML22340A211 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 13, Tables | Boric Acid Hydrostatic |
ML22340A210 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 2, Site and Environment | Safe Shutdown Boric Acid High winds Fire Barrier Tornado Missile Operating Basis Earthquake Zebra Mussel Design basis earthquake Annual Radiological Environmental Operating Report Veliger Earthquake Turbine Missile Biofouling |
ML22340A168 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 14, Table 14.0-1 (Unit 2) | |
ML22340A208 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 14.4, Revision 19, Environmental Qualifications Analyses (Unit 1) | |
ML22340A212 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 14.3.5 to 14.5.9, Environmental Consequences of a Loss-Of-Coolant Accident (Unit 2) | Safe Shutdown |
ML22340A214 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 14.A, Radiation Sources (Appendix 14A) (Unit 2) | |
ML22340A206 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 14, Safety Analysis (Unit 2) | Fuel cladding |
ML22340A201 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 3, Reactor (Unit 1) | Boric Acid Shutdown Margin Safe Shutdown Earthquake Earthquake Fuel cladding Flow Induced Vibration |
ML22340A203 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary and Emergency Systems | Safe Shutdown Boric Acid Shutdown Margin Loop seal Time to boil Hydrostatic Probabilistic Risk Assessment Operating Basis Earthquake Design basis earthquake Earthquake Control of Heavy Loads Fire Protection Program Tritium Power change |
ML22340A202 | 30 November 2022 | Technical Specifications Bases, List of Effective Pages | Safe Shutdown Unanalyzed Condition Boric Acid Shutdown Margin Reactor Vessel Water Level High Radiation Area Ultimate heat sink Non-Destructive Examination Grab sample Fire Barrier Stroke time Anticipated operational occurrence Tornado Missile Post Accident Monitoring Internal Flooding Hydrostatic Coatings Qualified Offsite Circuit Incorporated by reference Condition Adverse to Quality Missed surveillance Surveillance Frequency Control Program Battery sizing Earthquake Power Operated Valves Turbine Missile Fuel cladding Pressure Boundary Leakage Offsite Circuit Power change Unidentified leakage |
ML22340A198 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control | Safe Shutdown Boric Acid Shutdown Margin Fire Barrier Post Accident Monitoring Emergency Lighting Earthquake Fuel cladding |
ML22340A199 | 30 November 2022 | Report of Changes, Tests, Experiments Pursuant to 10 CFR 50.59(d)(2) | |
ML22340A200 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 3, Figures (Unit 2) | |
ML22340A191 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 8, Figures | |
ML22340A197 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 7, Tables | Boric Acid Ultimate heat sink Fuel cladding |
ML22340A196 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 14.3, Figures 14.3.1-1A to 14.3.4-75 (Unit 1) | |
ML22340A172 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 14.2, Figures 14.2.5-1 to 14.2.8-8 (Unit 2) | |
ML22340A189 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 9, Figures | |
ML22340A190 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 13, (Historical) Initial Tests and Operations | Boric Acid Hydrostatic |
ML22340A179 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 14.3, Figures 14.3.1-1A to 14.3.3-8 (Unit 2) | |
ML22340A180 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 3, Tables (Unit 1) | Safe Shutdown Earthquake Design basis earthquake |
ML22340A181 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 11, Tables | Boric Acid |
ML22340A188 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations | Non-Destructive Examination Control of Heavy Loads |
ML22340A182 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 14.4, Table 14.4.2-1A, Equipment Required to Shutdown Reactor (Unit 1) | |
ML22340A175 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 14.1, Tables 14.1.0-1 to 14.1.12-1 (Unit 2) | Shutdown Margin |
ML22340A193 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 14.2, Standby Safeguards Analysis (Unit 2) | Boric Acid Shutdown Margin Earthquake |
ML22340A195 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 10, Tables | |
ML22340A169 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 14.3, Figures 14.3.4-1 to 14.3.4-158 (Unit 2) | |
ML22340A171 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 2, Tables | Safe Shutdown Design basis earthquake Earthquake |
ML22340A173 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 14.A-G, Radiation Sources (Appendix 14A) (Unit 1) | Safe Shutdown Design basis earthquake Earthquake Fuel cladding |
ML22340A165 | 30 November 2022 | Technical Requirements Manual and Technical Requirements Manual Bases, List of Effective Pages (Unit 1) | Safe Shutdown Unanalyzed Condition Boric Acid Time of Discovery Shutdown Margin High Radiation Area Ultimate heat sink Fire Barrier Anticipated operational occurrence Post Accident Monitoring Temporary Modification Qualified Offsite Circuit FLEX Missed surveillance Fukushima Dai-Ichi Surveillance Frequency Control Program Operability Determination Spent Fuel Pool Instrumentation Earthquake Maintenance Rule Program Fuel cladding Continuous fire watch Fire Protection Program Fire Watch Hourly Fire Watch Early Warning Fire Detection Power change Power Uprate Measurement Uncertainty Recapture |
ML22340A187 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 14.A-G, Figures 14.G-1 and 14.G-2 (Unit 1) | |
ML22340A185 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 14.3, Tables 14.3.4-1 to 14.3.4-47 (Unit 2) | |
ML22340A183 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 4, Reactor Coolant System | Safe Shutdown Boric Acid Loop seal Hydrostatic Operating Basis Earthquake Nondestructive Examination Design basis earthquake Earthquake Fuel cladding Liquid penetrant Power change |
ML22340A184 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 14.3, Figure 14.3.7-1 (Unit 2) | |
ML22340A192 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 5, Containment System | Hydrostatic Coatings Operating Basis Earthquake Nondestructive Examination Finite Element Analysis Design basis earthquake Earthquake |
ML22340A207 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 3, Tables (Unit 2) | Shutdown Margin Operating Basis Earthquake Design basis earthquake |
ML22340A174 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems | Safe Shutdown Operator Manual Action Emergency Lighting Open Phase Condition Battery sizing |