Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
PLA-7934, Submittal of Cycle 21 Core Operating Limits Report PLA-793431 March 2021Submittal of Cycle 21 Core Operating Limits Report PLA-7934Shutdown Margin
MELLLA
PLA-7923, NRC Decommissioning Funding Status Report31 March 2021NRC Decommissioning Funding Status Report
ML21099A10829 March 2021NRC Decommissioning Funding Status Report
ML21091A22319 March 2021Technical Requirements ManualHot Short
Safe Shutdown
Time of Discovery
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Water Inventory Control
Post Accident Monitoring
Hydrostatic
Squib
Qualified Offsite Circuit
Missed surveillance
Surveillance Frequency Control Program
Scram Discharge Volume
Excess Flow Check Valve
Control of Heavy Loads
Power Operated Valves
Fuel cladding
Offsite Circuit
Scaffolding
PLA-7929, Submittal of Unit 2 Cycle 21 Reload Safety Analysis Report10 March 2021Submittal of Unit 2 Cycle 21 Reload Safety Analysis ReportShutdown Margin
Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Feedwater Controller Failure
MELLLA
ML20317A31410 March 2021Issuance of Amendment Nos. 280 and 262 Revise Technical Specification 3.8.1, AC Sources-Operating, to Create a New Condition for an Inoperable Manual Synchronization CircuitSafe Shutdown
Anticipated operational occurrence
Surveillance Frequency Control Program
Offsite Circuit
IR 05000388/20210124 March 2021EA-20-131: Susquehanna Steam Electric Station, Unit 2 - NRC Investigation Report No. 1-2020-001 and NRC Inspection Report No. 05000388/2021012High Radiation Area
Locked High Radiation Area
Significance Determination Process
IR 05000387/20200063 March 2021Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2020006 and 05000388/2020006)Fitness for Duty
Operator Manual Action
Open Phase Condition
License Renewal
Exemption Request
Power-Operated Valves
Power Operated Valves
COVID-19
ML21070A18126 February 2021Transmittal of Technical Requirements ManualShutdown Margin
Ultimate heat sink
Anticipated operational occurrence
Water Inventory Control
Post Accident Monitoring
Battery sizing
ML21070A18226 February 2021Technical Requirement Manual, Unit 2Shutdown Margin
Ultimate heat sink
Anticipated operational occurrence
Water Inventory Control
Post Accident Monitoring
Battery sizing
ML21055A03624 February 2021Single Positive Test Form Collected on 03/11/2020
ML21055A02824 February 2021Annual Fatigue Report Form for 2020
ML21055A03124 February 2021Annual Report Form for Drug and Alcohol Tests for 2020
ML21055A03524 February 2021Single Positive Test Form Collected on 05/18/2020
ML21055A03724 February 2021Single Positive Test Form Collected on 02/26/2020
ML21055A03824 February 2021Single Positive Test Form Collected on 03/23/2020
ML21055A03924 February 2021Single Positive Test Form Collected on 03/16/2020
ML21055A04024 February 2021Single Positive Test Form Collected on 08/19/2020
ML21055A04124 February 2021Single Positive Test Form Collected on 03/23/2020
ML21055A04224 February 2021Single Positive Test Form Collected on 06/22/2020
ML21055A04324 February 2021Single Positive Test Form Collected on 06/08/2020
ML21055A04424 February 2021Single Positive Test Form Collected on 03/24/2020
ML20342A23718 February 2021Issuance of Amendment Nos. 279 and 261 Revise Technical Specifications to Adopt TSTF-582, RPV WIC EnhancementsReactor Vessel Water Level
Water Inventory Control
Surveillance Frequency Control Program
Fuel cladding
Pressure Boundary Leakage
Offsite Circuit
ML21035A18411 February 2021Summary of the January 26, 2021, Meeting with Susquehanna Nuclear Regarding a Future License Amendment Request Related to Adopting Technical Specifications Task Force Traveler TSTF-505, Revision 2Internal Flooding
Probabilistic Risk Assessment
FLEX
Large early release frequency
IR 05000387/202040310 February 2021Cyber Security Problem Identification and Resolution Inspection Report 05000387/2020403 and 05000388/2020403 (Cover Letter Only)Cyber Security
Affidavit
IR 05000387/20200048 February 2021Integrated Inspection Report 05000387/2020004 and 05000388/2020004Internal Flooding
Past operability
Cyber Security
Emergency Lighting
Functionality Assessment
FLEX
B.5.b
Significance Determination Process
Operability Determination
Coronavirus
COVID-19
Through Wall Leak
Fire Protection Program
ML21025A17526 January 2021License Amendment Request to Adopt TSTF-505 - Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b Pre-Application Meeting, January 26, 2021 (Slides)Internal Flooding
Probabilistic Risk Assessment
Large early release frequency
ML20168B00421 January 2021Issuance of Amendment Nos. 278 and 260 to Allow Application of Advanced Framatome Atrium 11 Fuel Methodologies (EPID L-2019-LLA-0153) (Redacted)Shutdown Margin
Reactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Incorporated by reference
Aging Management
Feedwater Controller Failure
MELLLA
Fuel cladding
Power change
ML21012A26912 January 2021Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021Generic Fundamentals Examination
COVID-19
PMNS20210002, Pre-Application Meeting for TSTF-505 Application for Susquehanna Steam Electric Station5 January 2021Pre-Application Meeting for TSTF-505 Application for Susquehanna Steam Electric Station