ML21099A108

From kanterella
Jump to navigation Jump to search
NRC Decommissioning Funding Status Report
ML21099A108
Person / Time
Site: Susquehanna  
Issue date: 03/29/2021
From: Simpson L
Allegheny Electric Cooperative
To:
Office of Nuclear Reactor Regulation
References
Download: ML21099A108 (9)


Text

,__,

ELECTRIC COOPERATIVE~

212 LOCUST ST. **P.O. BOX 1266

  • HARRISBU,RG, PA 17108-1266* Pl:IONE 7171233-5704 **FAX 717/234-1309 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION NRC DECOMMISSIONING FUNDING STATUS REPORT to 10 CFR 50.75 March 29,2021 Docket Nos. 50-387 and 50-388 This letter provides,decommissioning information for the Allegheny Electric Cooperative, Inc. (AEC) ten percent interest in Susquehanna Unit 1 and Unit 2 (SSES) as required by 10 CFR 5_0.75 Reporting and Recordkeeping for Decommissioning Plaooioe," section (f)(l).

'> contains the AEC decommissioning funding status report at December 31, 2020, submitted biennially to comply with 10 CFR ~0.75(f)(l).

If you have any questions regarding the decommissioning report, please direct them to the undersigned.

Sincerely, L. Katrice Simpson Vice President-Finance & Accounting : NRC Decommissioning Funding Status Report December 31, 2020 Copy:

NRCRegionI Ms. S. Goetz, NRC Project Manager Mr. Chris Highley, NRC Sr. Resident Inspector Mr. M. Shields: PA DEP/BRP

( to NRC Decommissioning Funding Status Report December 31, 2020

NRC Decommissioning Funding Status Report December 31, 2020 Allegheny Electric Cooperative, Inc.

Susquehanna Steam Electric Station Page 1 of3 Allegheny Electric Cooperative, Inc. (ABC) hereby submits this Decommissionmg Report in compliance with 10 CFR 50.75(f)(l) for its 10% share of Susquehanna (SSES)

Unit 1 and Unit 2.

ABC has analyzed its current funding levels for both SSES units and concluded that these funding levels plus net earnings from trust investments will be sufficient to pay for the decommissioning costs of each unit at the time permanent termination of operations is expected for each unit, consistent with the NRC prescribed minimum set forth in 10 CFR 50.75(c).

Information is submitted to provide Financial Assurance

1. The minimum amount of decommissioning funds estimated to be required pursuant to 10 CFR 50.75 (b) and (c) at December 31, 2020.

Unit# 1

$69,417,000 Page,2 of3 Unit#2

$69,417,000 Allegheny Electric Cooperative, Inc.' s (AEC) calculation of the NRC minimum formula is reflected in Exhibit 1 (behind this Attachment).

2. The amount accumulated at the end of the calendar year preceding the date of the report, net of taxes paid on realized gains and losses, for items included in 10 CFR 50. 75 (b) and ( c ).

Market Value at December 31, 2020

3. Annual amounts remaining to be collected.

(See Exhibit 2)

4. The assumptions used regarding escalation in decommissioning cost, rates of earnings on decommissioning funds, and rates of other factors used in funding projections.

Estimated inflation rate for decommissioning costs Estimated earnings rate on decommissioning funds per 10 CFR 50.75(e)(l)(ii) which are credited up to the time of permanent termination of operations along with a pro-rata credit during the -

dismantlement period.

Rates of other factors used in funding projections

5. Any power sale contracts upon whlch licensee is relying to provide financial assurance.

AEC is the wholesale power supplier for the 14 rural'electric cooperatives in Pennsylvania and New Jersey. AEC has wholesale power contracts with its 14 member distribution cooperatives, which is the source for funding the Trust Fund.

$95,006,664

$0 5.0%

7.0%

None (see below)

$9~,006,664

$0 5.0%

7.0%

None (see below)

Information is submitted to provide Financial Assurance

6. Modifications to licensee's. method of providing financial assurance since previous report.
7. Material changes to trust agreement.

I Unit# 1 None None Page 3 of3 Unit#2 None None

Calculation of Escalation Factors Used in Computation of Minimum Financial Assurance Amount for Decommissioning Susquehanna Steam Electric Station Units land 2 Exhibit 1 Page I of3 Boiling Water Reactor (BWR)

Escalation Factor Formula-0.65(L) + 0.13(E) + 0.22(B)

Escalation= (.65 x 3.110) + (.13 x 2.278) + (.22 x 12.837)

Escalation= (2.022 +.296 + 2.824) = 5.142 (L) -Labor- (Bureau of Labor Statistics, Ta~le 6, Compensation, Employment Cost Index, for total comp~on, private industry workers, by bargaining status, region and area size)

Northeast region - December 2020 Index Number December 2005 Index Number December 2005 Base L=

144.0 100.0 times 2.16 Equals

\\

144.0 100.0 2.16 3.110 (E) - Energy - (Producer Price Index Commodities, Series ID: WPU0543 and WPU0573)

E =

(.54P +.46F)

E =

(.54 x 2.038) + (.46 x 2.559)

E =

1.1()1 + 1.177 = 2.278 P - Industrial Power, 500 kW Demand - (Commodity 0543)

December 2020 Index Number 232.7 January 1986 Index Number 114.2 (1)

P =

232.7 equals 2.038 114.2

1 F - Light Fuel Oils - (Commodity 0573)

December 2020 Index Number 209.8 January 1986 Index Number 82.0 F =.

209.8 1 equals 2.559 82.0 *

(B) Waste Burial Exhibit 1 Page 2 of3 NUREG - 1307, Rev. 18, NRC Report on Waste Burial Charges" Table 2.1-Generators Located'in Unaffiliated States and those in Compact States having No Disposal Facility 12.837 (1) Represents ~e national base value ofP at January 1986. The base value of Pis no longer determined on a regional basis.

Allegheny Electric Cooperative, :Jnc.

Attachment I Exhibit I P,age 3 of3 Computation of Minimum Financial Assurance Amount for Decommissioning Susquehanna Steam Electric Station Units 1 and 2 Base amount for BWRgreater than

'3,400 MWt = $135 million The Power Level of Unit 1 = 3,952 MWt and Unit 2 = 3,952 MWt Ownership Percentage Base Amount per Unit Escalation Factor Escalated Amount Pt:?I" Unit Total Escalated Amount (Unit 1 + Unit 2)

\\

Unit 1

$135,000,000 10%

$13,500,000 5.142

$69,417,000 Unit2

$135,000,000 10%

$13,500,000

  • 5.142

$69,417,000

$138,834,000

\\_

Exhibit 2 Page 1 of 1 Based on current funding and projected earnings, the Trust is considered to be sufficiently funded. AEC reviews the ac~ cost inflation and earnings performance

-periodically and adjusts the future funding schedule accordingly.

'-