 Issue dateTitleTopic
ML18117A16329 March 2018Response to Notice of Violation; EA-17-143
CNRO-2018-00012, Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v)29 March 2018Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v)Incorporated by reference
Decommissioning Funding Plan
Exemption Request
ML18087A00321 March 2018Crane Nuclear, Inc. - Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl 10x8x10 and 6x4x6 Bolted Bonnet Gate Valve (Updated)
ML18075A12320 March 2018Entergy Nuclear Operations - March 20, 2018, Presentation Slides for Surveillance Frequency Control Program, UFSAR Change ConsiderationsSurveillance Frequency Control Program
CNRO-2018-00011, Submittal of Joint Plant Access Shared Information Table19 March 2018Submittal of Joint Plant Access Shared Information Table
ML18066A08219 March 2018Enclosure - Letter to Senator Elizabeth Warren, Et Al., from Chairman Svinicki Regarding Winter Storms and an Inspector for Pilgrim Nuclear Power StationSafe Shutdown
Press Release-I-18-003, NRC Staff to Conduct Public Meeting to Discuss 2017 Performance of Pilgrim Nuclear Power Plant19 March 2018Press Release-I-18-003: NRC Staff to Conduct Public Meeting to Discuss 2017 Performance of Pilgrim Nuclear Power Plant
ML18074A07614 March 2018LTR-18-0097 - Email Response OPA - Therese Bilodeau, E-mail Re Request to Have Pilgrim Nuclear Power Station Shutdown (002)
ML18073A14014 March 2018Notice of Category 1 Public Meeting - Annual Assessment Meeting for Pilgrim Nuclear Power Station
Press Release-IV-18-002, NRC Issues Confirmatory Order to Entergy14 March 2018Press Release-IV-18-002: NRC Issues Confirmatory Order to Entergy
ML18087A04114 March 2018Notification of Changes to Comprehensive Recovery Plan and Area Action Plan Action Completion DatesFunctionality Assessment
IR 05000416/201701412 March 2018Confirmatory Order, NRC Inspection Report 05000416/2017014, and NRC Investigation Reports 4-2016-004 and 4-2014-021Enforcement Discretion
Exemption Request
ML18072A39212 March 2018LTR-18-0097 Therese Bilodeau, E-mail Request to Have Pilgrim Nuclear Power Station Shutdown
ML18068A0879 March 2018Letter Notifying Entergy Operations, Inc. and Entergy Nuclear Operations, Inc., Are No Longer Members of the Nuclear Energy Institute Effective 02/01/2018
ML18067A1188 March 2018FEMA Review Requested of Revision to the Pilgrim Nuclear Power Station Emergency Plan to Address the Permanently Defueled Condition
L-2018-064, Submittal of Joint Composite Adversary Force8 March 2018Submittal of Joint Composite Adversary Force
ML18141A6907 March 2018Appendix F - Annual 2017 Quality Assurance Report
ML18079A0146 March 2018Crane Nuclear, Inc., 10 CFR Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl I0x8x10 and 6x4x6 Bolted Bonnet Gate Valve
ML18075A3556 March 201810 CFR Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl 10x8x10 and 6x4x6 Bolted Bonnet Gate Valve
ML18065A1385 March 2018FEMA Email to NRC Dated 3-5-18 Reasonable Assurance for Pilgrim Station
Press Release-18-008, NRC Issues Annual Assessments for Nation'S Nuclear Plants5 March 2018Press Release-18-008: NRC Issues Annual Assessments for Nation'S Nuclear Plants
ML18065A2302 March 2018MEMA Email to FEMA Regional Administrator Dated 3-2-18: Pilgrim Nuclear Power Station
ML18078A31228 February 2018Independent Spent Fuel Storage Installation - Radioactive Effluent Release ReportAnnual Radioactive Effluent Release Report
ML18059A73728 February 2018Single Positive Test Form Collected on 03/30/2017
IR 05000293/201700628 February 2018Annual Assessment Letter for Pilgrim Nuclear Power Station (Reports 05000293/2017006, 05000293/2017402, and 05000293/2017501)Fitness for Duty
ML18059A73428 February 2018Annual Report Form for Drug and Alcohol Tests for 2017
ML18059A73628 February 2018Single Positive Test Form Collected on 03/30/2017
ML18059A73928 February 2018Single Positive Test Form Collected on 03/27/2017
ML18059A74128 February 2018Single Positive Test Form Collected on 03/28/2017
ML18059A74228 February 2018Single Positive Test Form Collected on 04/17/2017
ML18059A74328 February 2018Single Positive Test Form Collected on 06/08/2017
ML18059A74428 February 2018Single Positive Test Form Collected on 10/18/2017
ML18059A74628 February 2018Single Positive Test Form Collected on 04/03/2017
ML18059A74928 February 2018Single Positive Test Form Collected on 03/27/2017
ML18059A75028 February 2018Single Positive Test Form Collected on 2/8/2017
ML18059A75128 February 2018Single Positive Test Form Collected on 07/11/2017
ML18059A75228 February 2018Annual Fatigue Report Form for 2017
ML18059A73828 February 2018Single Positive Test Form Collected on 04/04/2017
ML18052B08427 February 2018NRC Investigation Report No. 1 -2017-011 and Notice of Violation
ML18052B06627 February 2018NRC Investigation Report No. 1-2017-015
ML18054A90723 February 2018NRR E-mail Capture - Request Documents Pertaining to PNPS Decommissioning
ML18051A16820 February 2018NRR E-mail Capture - Acceptance Review - Pilgrim - License Amendment Request - Revise the Pilgrim Emergency Plan to Address the Permanently Defueled Condition (ERO Staffing LAR) (EPID: L-2018-LLA-0xxx)
ML18046A03914 February 201802-14-18 Acknowledgement Letter to Senators Warren, Markey and Keating Regarding the Pilgrim Plant
IR 05000293/201700414 February 2018Integrated Inspection Report 05000293/2017004Fire Barrier
Internal Flooding
Temporary Modification
Functionality Assessment
Significance Determination Process
Job Performance Measure
Operability Determination
Siren
Failure to Scram
ML18043A18512 February 2018OEDO-15-00479 - 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - 60-Day Status Report (CAC No. MF6460; EPID L-2015-CRS-0002)
ML18032A6131 February 2018NRC Office of Investigations Case No. 1-2017-007
IR 05000293/20170101 February 2018Confirmatory Action Letter (EA-17-086) Follow-Up Inspection Report 05000293/2017010Functionality Assessment
Operability Determination
ML18037A70326 January 2018Open Phase Condition DetectionOpen Phase Condition
05000293/LER-2017-01325 January 20181 OF 4
LER 17-013-00 for Pilgrim Nuclear Power Station Regarding Reportable Conditions Involving Standby Gas Treatment System and Secondary Containment lnoperability Not Reported During the Previous Three Years
Mission time
Recently irradiated fuel
ML17354A63022 January 2018Arkansas, Units 1 and 2; Grand Gulf; Indian Point, Units 1, 2, and 3; Palisades; Pilgrim; River Bend; Vermont Yankee; and Waterford 3 - Use of Encryption Software for Electronic Transmission of Safeguards Information