ML18081A87029 March 2018Report for the Audit of Licensee Responses to Interim Staff Evaluations Open Items Related to NRC Order EA-13-109 to Modify Licenses with Regard to Reliable Hardened Containment VentsTornado Missile
Safe Shutdown Earthquake
Operating Basis Earthquake
FLEX
Hardened vent
ML18241A38223 March 2018CNS Email to Beaulieu, George, Kumana: Response to CNS Fan Coil Unit QuestionsUltimate heat sink
ML18064A10222 March 2018Request No. RI-21, Revision 1 - Request for Relief Concerning Examinations for the Fourth 10-Year Inservice Inspection Interval (CAC No. MF9623; EPID L-2017-LLR-0026)Non-Destructive Examination
VT-2
Incorporated by reference
Liquid penetrant
Pressure Boundary Leakage
Through-Wall Leak
Through-Wall Leakage
Dissimilar Metal Weld
ML18087A00321 March 2018Crane Nuclear, Inc. - Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl 10x8x10 and 6x4x6 Bolted Bonnet Gate Valve (Updated)
NLS2018015, Property Insurance Coverage15 March 2018Property Insurance Coverage
NLS2018012, Response to Nuclear Regulatory Commission Request for Additional Information for Relief Request RI5-0314 March 2018Response to Nuclear Regulatory Commission Request for Additional Information for Relief Request RI5-03
ML18073A30614 March 2018U.S. Nuclear Regulatory Commission Presentation at the April 9, 2018, Auburn City Council Meeting
NLS2018014, Report of Change and Summary of 50.54(q) Analysis Emergency Plan Implementing Procedure 5.7.13, Revision 1912 March 2018Report of Change and Summary of 50.54(q) Analysis Emergency Plan Implementing Procedure 5.7.13, Revision 19
ML18079A11512 March 2018Submittal of Emergency Plan Implementing Procedure 5.7.13, Revision 19
ML18068A7249 March 2018Final Accident Sequence Precursor Analysis - Cooper Nuclear Station, Concurrent Unavailabilities-Residual Heat Removal Loop a, Reactor Core Isolation Cooling, and Emergency Station Service Transformer (LER 298-2017-001-01) - PrecursorTime of Discovery
Fitness for Duty
Preliminary White Finding
NLS2018011, Response to Nuclear Regulatory Commission Request for Additional Information for Relief Requests RR5-02 and RR5-038 March 2018Response to Nuclear Regulatory Commission Request for Additional Information for Relief Requests RR5-02 and RR5-03
ML18075A3556 March 201810 CFR Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl 10x8x10 and 6x4x6 Bolted Bonnet Gate Valve
ML18079A0146 March 2018Crane Nuclear, Inc., 10 CFR Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl I0x8x10 and 6x4x6 Bolted Bonnet Gate Valve
IR 05000298/20170061 March 2018Annual Assessment Letter for Cooper Nuclear Station (Report 05000298/2017006)Cyber Security
Open Phase Condition
Spent Fuel Pool Instrumentation
ML18060A02728 February 2018Enclosurequest for Additional Information (Letter to J. Shaw Request for Additional Information Regarding Nebraska Public Power District'S Decommissioning Funding Plan Update for Cooper Nuclear Station ISFSI)Decommissioning Funding Plan
Authorized possession limits
ML18060A02628 February 2018Letter to J. Shaw Request for Additional Information Regarding Nebraska Public Power District'S Decommissioning Funding Plan Update for Cooper Nuclear Station Independent Spent Fuel Storage InstallationDecommissioning Funding Plan
IR 05000298/201700412 February 2018NRC Integrated Inspection Report 05000298/2017004Offsite Dose Calculation Manual
Anticipated operational occurrence
Enforcement Discretion
Functionality Assessment
Significance Determination Process
Job Performance Measure
Operability Determination
License Renewal
Fuel cladding
Fire Protection Program
Unidentified leakage
ML18044A1096 February 2018Summary of 50.54(q) Analyses, Emergency Plan, Revision 70
ML18037B0006 February 2018NRR E-mail Capture - Cooper Nuclear Station - Final RAI Relief Requests RR-02 and RR-03 (EPIDs L-2017-LRR-065 and -066)
NLS2018005, Submittal of Emergency Plan, Revision 706 February 2018Submittal of Emergency Plan, Revision 70
ML18025C00425 January 2018Notification of NRC Design Bases Assurance Inspection (Teams) (05000298/2018011) and Initial Request for InformationUltimate heat sink
Probabilistic Risk Assessment
Temporary Modification
Large early release frequency
ML18024A37524 January 2018NRR E-mail Capture - Cooper Nuclear Station - Final RAI LAR to Adopt TSTF-542 (CAC MG0138; EPID L-2017-LLA-0290)Reactor Vessel Water Level
Water Inventory Control
ML18023A11023 January 2018CNS - Notification of NRC Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans (05000298/2018010) and RequestHigh winds
FLEX
Spent Fuel Pool Instrumentation
IR 05000298/201750117 January 2018NRC Emergency Preparedness Annual Inspection Report 05000298/2017501
NLS2018003, Submittal of Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 201715 January 2018Submittal of Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2017
ML18009A9858 January 2018Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018Generic Fundamentals Examination
ML18016A0528 January 2018Submittal of Change to Emergency Plan Implementing Procedure 5.7.1, Rev. 59
NLS2018001, Attachment - Report of Change and Summary of 50.54(q) Analysis for Emergency Plan Implementing Procedure 5.7.1, Revision 598 January 2018Attachment - Report of Change and Summary of 50.54(q) Analysis for Emergency Plan Implementing Procedure 5.7.1, Revision 59Safe Shutdown
Unanalyzed Condition
Health Physics Network
High winds
Reactor Vessel Water Level
Ultimate heat sink
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Operating Basis Earthquake
B.5.b
Scram Discharge Volume
Safeguards Contingency Plan
Earthquake
Fuel cladding
Pressure Boundary Leakage
Fire Protection Program
Power change
Failure to Scram