ML18081A870 | 29 March 2018 | Report for the Audit of Licensee Responses to Interim Staff Evaluations Open Items Related to NRC Order EA-13-109 to Modify Licenses with Regard to Reliable Hardened Containment Vents | Tornado Missile Safe Shutdown Earthquake Operating Basis Earthquake FLEX Hardened vent |
ML18241A382 | 23 March 2018 | CNS Email to Beaulieu, George, Kumana: Response to CNS Fan Coil Unit Questions | Ultimate heat sink |
ML18064A102 | 22 March 2018 | Request No. RI-21, Revision 1 - Request for Relief Concerning Examinations for the Fourth 10-Year Inservice Inspection Interval (CAC No. MF9623; EPID L-2017-LLR-0026) | Non-Destructive Examination VT-2 Incorporated by reference Liquid penetrant Pressure Boundary Leakage Through-Wall Leak Through-Wall Leakage Dissimilar Metal Weld |
ML18087A003 | 21 March 2018 | Crane Nuclear, Inc. - Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl 10x8x10 and 6x4x6 Bolted Bonnet Gate Valve (Updated) | |
NLS2018015, Property Insurance Coverage | 15 March 2018 | Property Insurance Coverage | |
NLS2018012, Response to Nuclear Regulatory Commission Request for Additional Information for Relief Request RI5-03 | 14 March 2018 | Response to Nuclear Regulatory Commission Request for Additional Information for Relief Request RI5-03 | |
ML18073A306 | 14 March 2018 | U.S. Nuclear Regulatory Commission Presentation at the April 9, 2018, Auburn City Council Meeting | |
NLS2018014, Report of Change and Summary of 50.54(q) Analysis Emergency Plan Implementing Procedure 5.7.13, Revision 19 | 12 March 2018 | Report of Change and Summary of 50.54(q) Analysis Emergency Plan Implementing Procedure 5.7.13, Revision 19 | |
ML18079A115 | 12 March 2018 | Submittal of Emergency Plan Implementing Procedure 5.7.13, Revision 19 | |
ML18068A724 | 9 March 2018 | Final Accident Sequence Precursor Analysis - Cooper Nuclear Station, Concurrent Unavailabilities-Residual Heat Removal Loop a, Reactor Core Isolation Cooling, and Emergency Station Service Transformer (LER 298-2017-001-01) - Precursor | Time of Discovery Fitness for Duty Preliminary White Finding |
NLS2018011, Response to Nuclear Regulatory Commission Request for Additional Information for Relief Requests RR5-02 and RR5-03 | 8 March 2018 | Response to Nuclear Regulatory Commission Request for Additional Information for Relief Requests RR5-02 and RR5-03 | |
ML18075A355 | 6 March 2018 | 10 CFR Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl 10x8x10 and 6x4x6 Bolted Bonnet Gate Valve | |
ML18079A014 | 6 March 2018 | Crane Nuclear, Inc., 10 CFR Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl I0x8x10 and 6x4x6 Bolted Bonnet Gate Valve | |
IR 05000298/2017006 | 1 March 2018 | Annual Assessment Letter for Cooper Nuclear Station (Report 05000298/2017006) | Cyber Security Open Phase Condition Spent Fuel Pool Instrumentation |
ML18060A027 | 28 February 2018 | Enclosurequest for Additional Information (Letter to J. Shaw Request for Additional Information Regarding Nebraska Public Power District'S Decommissioning Funding Plan Update for Cooper Nuclear Station ISFSI) | Decommissioning Funding Plan Authorized possession limits |
ML18060A026 | 28 February 2018 | Letter to J. Shaw Request for Additional Information Regarding Nebraska Public Power District'S Decommissioning Funding Plan Update for Cooper Nuclear Station Independent Spent Fuel Storage Installation | Decommissioning Funding Plan |
IR 05000298/2017004 | 12 February 2018 | NRC Integrated Inspection Report 05000298/2017004 | Offsite Dose Calculation Manual Anticipated operational occurrence Enforcement Discretion Functionality Assessment Significance Determination Process Job Performance Measure Operability Determination License Renewal Fuel cladding Fire Protection Program Unidentified leakage |
ML18044A109 | 6 February 2018 | Summary of 50.54(q) Analyses, Emergency Plan, Revision 70 | |
ML18037B000 | 6 February 2018 | NRR E-mail Capture - Cooper Nuclear Station - Final RAI Relief Requests RR-02 and RR-03 (EPIDs L-2017-LRR-065 and -066) | |
NLS2018005, Submittal of Emergency Plan, Revision 70 | 6 February 2018 | Submittal of Emergency Plan, Revision 70 | |
ML18025C004 | 25 January 2018 | Notification of NRC Design Bases Assurance Inspection (Teams) (05000298/2018011) and Initial Request for Information | Ultimate heat sink Probabilistic Risk Assessment Temporary Modification Large early release frequency |
ML18024A375 | 24 January 2018 | NRR E-mail Capture - Cooper Nuclear Station - Final RAI LAR to Adopt TSTF-542 (CAC MG0138; EPID L-2017-LLA-0290) | Reactor Vessel Water Level Water Inventory Control |
ML18023A110 | 23 January 2018 | CNS - Notification of NRC Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans (05000298/2018010) and Request | High winds FLEX Spent Fuel Pool Instrumentation |
IR 05000298/2017501 | 17 January 2018 | NRC Emergency Preparedness Annual Inspection Report 05000298/2017501 | |
NLS2018003, Submittal of Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2017 | 15 January 2018 | Submittal of Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2017 | |
ML18009A985 | 8 January 2018 | Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 | Generic Fundamentals Examination |
ML18016A052 | 8 January 2018 | Submittal of Change to Emergency Plan Implementing Procedure 5.7.1, Rev. 59 | |
NLS2018001, Attachment - Report of Change and Summary of 50.54(q) Analysis for Emergency Plan Implementing Procedure 5.7.1, Revision 59 | 8 January 2018 | Attachment - Report of Change and Summary of 50.54(q) Analysis for Emergency Plan Implementing Procedure 5.7.1, Revision 59 | Safe Shutdown Unanalyzed Condition Health Physics Network High winds Reactor Vessel Water Level Ultimate heat sink Safe Shutdown Earthquake Internal Flooding Hydrostatic Operating Basis Earthquake B.5.b Scram Discharge Volume Safeguards Contingency Plan Earthquake Fuel cladding Pressure Boundary Leakage Fire Protection Program Power change Failure to Scram |