Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
L-18-078, Annual Notification of Property Insurance Coverage29 March 2018Annual Notification of Property Insurance Coverage
L-18-081, Steam Generator Technical Specification Amendment Request28 March 2018Steam Generator Technical Specification Amendment RequestNondestructive Examination
Finite Element Analysis
ML18073A10628 March 2018Safety Evaluation of Proposed Alternatives 1-TYP-4-BA-01 and TYP-4-BN-01 Regarding the Fourth 10- Year Interval of the Inservice Inspection ProgramProbabilistic Risk Assessment
Incorporated by reference
ML18075A09627 March 2018Safety Evaluation of Proposed Alternative to Use ASME Code Cases N-695-1 and N-696-1 in Lieu of Certain Requirements of the ASME CodeNondestructive Examination
Incorporated by reference
DM weld
L-18-098, Submittal of February 2018 Discharge Monitoring Report26 March 2018Submittal of February 2018 Discharge Monitoring Report
ML18067A11222 March 2018Staff Assessment of Flooding Focused EvaluationInternal Flooding
Hydrostatic
FLEX
Fukushima Dai-Ichi
Flooding Focused Evaluation
ML18071A16922 March 2018Flood Hazard Mitigation Strategies AssessmentBoric Acid
Time to boil
Internal Flooding
Hydrostatic
FLEX
Fukushima Dai-Ichi
Flood Hazard Mitigation Strategies Assessment
CAC:MF789622 March 2018
Press Release-I-18-004, NRC to Conduct Open House to Discuss 2017 Performance of Beaver Valley Nuclear Power Plant19 March 2018Press Release-I-18-004: NRC to Conduct Open House to Discuss 2017 Performance of Beaver Valley Nuclear Power PlantOpen House
L-18-061, Units. 1 & 2, Davis-Besse, and Perry, Response to Request for Additional Information Regarding Exemption Request for a Physical Barrier Requirement16 March 2018Units. 1 & 2, Davis-Besse, and Perry, Response to Request for Additional Information Regarding Exemption Request for a Physical Barrier RequirementExemption Request
L-18-086, Submittal of Emergency Preparedness Plan15 March 2018Submittal of Emergency Preparedness Plan
L-18-017, Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado.15 March 2018Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado.Safe Shutdown
Unanalyzed Condition
Boric Acid
Enforcement Discretion
Probabilistic Risk Assessment
FLEX
Tornado Generated Missile
Tornado Missile Protection
Tornado Missile Risk Evaluator
ML18065A98213 March 2018Review of the Steam Generator Tube Inspection Report for the 19th Refueling Outage in Spring 2017(CAC No. MG0086; EPID L-2017-LRO-0025)
ML18067A1139 March 2018Notice of Public Meeting on March 27, 2018Open House
ML17313A5501 March 2018Exemption from the Requirements of 10 CFR 50.46 and Appendix K to 10 CFR Part 50 to Allow the Use of Optimized Zirlo Fuel Rod Cladding (CAC Nos. MF9582 and MF9583; EPID L-2017-LLE-0011)Exemption Request
Fuel cladding
CAC:MF95801 March 2018
ML18022B1161 March 2018Issuance of Amendment Nos. 302 and 191 Regarding the Use of Optimized Zirlo Fuel Rod Cladding (CAC Nos. MF9580 and MF9581; EPID L-2017-LLA-0201)Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Nondestructive Examination
Pressure and Temperature Limits Report
Fuel cladding
ML17313A5541 March 2018FRN Exemption from the Requirements of 10 CFR 50.46 and Appendix K to 10 CFR Part 50 to Allow the Use of Optimized Zirlo Clad Fuel Rods (CAC Nos. MF9582 and MF9583; EPID L-2017-LLE-0011)Exemption Request
Fuel cladding
CAC:MF95821 March 2018
IR 05000334/201700628 February 2018Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2(Reports 05000334/2017006 and 0500412/2017006; 05000334/2017402 and 05000412/2017402 and 05000334-2017501 and 05000412/2017501)Cyber Security
L-18-030, WCAP-18102-NP, Rev 1, Beaver Valley Unit 1 Heatup and Cooldown Limit Curves for Normal Operation.28 February 2018WCAP-18102-NP, Rev 1, Beaver Valley Unit 1 Heatup and Cooldown Limit Curves for Normal Operation.Hydrostatic
Pressure and Temperature Limits Report
L-18-066, Submittal of Discharge Monitoring Report27 February 2018Submittal of Discharge Monitoring Report
ML18058A95327 February 2018Comments on BVPS SE
ML18058A98527 February 2018BVPS-1 License Condition PageFire Protection Program
ML18059A79826 February 2018BVPS NFPA 805 License Amendment Change Requested, and Other SE Comments
ML18054A61326 February 2018Temporary Project Manager Reassignment
ML18058B07223 February 2018BVPS NFPA 805 License Amendment Change Requested, and Other SE Comments
ML18054B11523 February 2018Single Positive Test Form Collected on 04/12/2017
ML18054B11323 February 2018Single Positive Test Form Collected on 03/29/2017
ML18054B11223 February 2018Single Positive Test Form Collected on 04/12/2017
ML18054B06223 February 2018Annual Report Form for Drug and Alcohol Tests for 2017
ML18094A64921 February 2018OEDO-18-00160: Attachment 3 - Pittsburgh Post-Gazette
ML18065A18321 February 2018Firstenergy Corporation - Certificate of Liability Insurance
ML18050A02619 February 2018Annual Fatigue Report Form for 2017
L-18-048, Retrospective Premium Guarantee16 February 2018Retrospective Premium Guarantee
ML18086B02516 February 2018Facility Cover Letter - Ri - March 2018 - GFE
L-18-054, Submittal of Emergency Preparedness Plan15 February 2018Submittal of Emergency Preparedness Plan
ML18045A26214 February 2018Single Positive Test Form Collected on 04/12/2017
ML18045A26114 February 2018Single Positive Test Form Collected on 08/28/2017
ML18045A25914 February 2018Single Positive Test Form Collected on 04/17/2017
ML18045A25714 February 2018Single Positive Test Form Collected on 08/28/2017
ML18045A19814 February 2018Annual Report Form for Drug and Alcohol Tests for 2017
ML18045A24614 February 2018Single Positive Test Form Collected on 07/11/2017
ML18045A25014 February 2018Single Positive Test Form Collected on 03/30/2017
ML18045A25114 February 2018Single Positive Test Form Collected on 03/29/2017
ML18045A25214 February 2018Single Positive Test Form Collected on 04/12/2017
ML18045A25414 February 2018Single Positive Test Form Collected on 03/29/2017
ML18045A25514 February 2018Single Positive Test Form Collected on 04/12/2017
ML18043A0109 February 2018NRR E-mail Capture - FENOC--MG0010-MG0011, MG-0012, MG0013-- Request for Additional Information (RAI) - Exemption Request Security Barrier in Physical PlansExemption Request
L-18-033, Cyber Security Plan (Revision 1)2 February 2018Cyber Security Plan (Revision 1)Cyber Security