FENOC ffi EhA/ r*rcraar wrlg Cor?tpilty 341 White Pond Dr.

Akron, Ohio 44320 February 16, 2018 L-18-048 10 cFR 140.21 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Beaver Valley Power Station, Unit Nos. 1 and 2 Docket No. 50-334, License No. DPR-66 Docket No. 50-412, License No. NPF-73 Davis-Besse Nuclear Power Station, Unit No. 1 Docket No. 50-346, License No. NPF-3 Perry Nuclear Power Plant, Unit No. 1 Docket No. 50-440, License No. NPF-58 Retrosoective Premium Guarantee The requirements of 10 CFR 140.21 include annual submittal of evidence thateach licensee maintains a guarantee of payment of deferred premium in the amount of

$18.963 million for each reactor it is licensed to operate. FirstEnergy Nuclear Operating Company and FirstEnergy Nuclear Generation, LLC maintain nuclear liability insurance procured through Marsh USA for Beaver Valley Power Station, Unit Nos. 1 and 2; Davis-Besse Nuclear Power Station, Unit No. 1; and Perry Nuclear Power Plant, Unit No. 1 under the American Nuclear lnsurer's (ANl) Master Policy-Nuclear Energy Liability lnsurance (Secondary Financial Protection). This coverage includes a Bond of Payment of Retrospective Premiums and provides the basis for compliance with the provisions of 10 CFR M4.21(a). On January 30,2018, Marsh USA provided a certificate of insurance evidencing this coverage to the Nuclear Regulatory Commission (NRC).

There are no regulatory commitments contained in this letter. !f there are any questions or if additiona! information is required, please contact Mr. Thomas A. Lentz, Manager -

FIeet Licensing, at (330) 315-6810.

Beaver Valley Power Station, Unit Nos. 1 and 2 Davis-Besse Nuclear Power Station, Unit No. 1 Perry Nuclear Power Plant, Unit No. 1 L-18-048 Page 2 Sincerel y, Gregory H. Halnon Vice President, Regulatory Affairs cc. NRC Region lAdministrator NRC Region Il ! Administrator NRC Resident lnspector (Beaver Valley)

NRC Resident lnspector (Davis-Besse)

NRC Resident lnspector (Perry)

NRC Project Manager (Fleet)

Director, Bureau of Radiation Protection/Department of Environmental Protection (BRP/DEP)

Site BRP/DEP Representative Utility Radiological Safety Board