L-18-078, Annual Notification of Property Insurance Coverage
| ML18089A019 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley, Davis Besse, Perry |
| Issue date: | 03/29/2018 |
| From: | Benyak D FirstEnergy Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| L-18-078 | |
| Download: ML18089A019 (2) | |
Text
FENOG fffi E ra4$/ r*rcroer Wry CanpF,ry 341 Vrlhite Pond Dr, Akron, Ohio 44320 March 29, 2018 L-18-078 10 CFR 50.54(wX3)
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Beaver Valley Power Station, Unit Nos. 1 and 2 Docket No. 50-334, License No. DPR-66 Docket No. 50-412, License No. NPF-73 Davis-Besse Nuclear Power Station, Unit No. 1 Docket No. 50-346, License No. NPF-3 Perry Nuclear Power Plant, Unit No. 1 Docket No. 50-440, License No. NPF-58 Annual Notification of P lnsurance Coveraoe ln accordance with 10 CFR 50.54, "Conditions of licenses," paragraph (w)(3),
FirstEnergy Nuclear Operating Company (FENOC) hereby confirms that a primary and blanket nuclear property insurance policy are provided by Nuclear Electric lnsurance Limited for the amounts listed below.
Facility Total Coveraqe Beaver Valley Power Station, Unit Nos. 1 and 2
$2,750,000,000*
Davis-Besse Nuclear Power Station, Unit No. 1
$2,750,000,000*
Perry Nuclear Power Plant, Unit No. 1
$2,750,000,000" The $2,750,000,000 coverage includes a $1,250,000,000 blanket policy shared by the three active FENOC sites.
There are no regulatory commitments contained in this letter. lf there are any questions, or if additional information is required, please contact Mr. Thomas A. Lentz, Manager - Fleet Licensing, at 330-315-6810.
Beaver Valley Power Station, Unit Nos. 1 and 2 Davis-Besse Nuclear Power Station, Unit No. 1 Perry Nuclear Power Plant, Unit No. 1 L-18-078 Page 2 Sincerely, Darin M. Benyak Vice President, Nuclear Support and Regulatory Affairs NRC Region ! Administrator NRC Region II I Administrator NRC Resident lnspector - Beaver Valley Power Station, Unit Nos. 1 and 2 NRC Resident lnspector - Davis-Besse Nuclear Power Station, Unit No. 1 NRC Resident lnspector - Perry Nuclear Power Plant, Unit No. 1 NRC Project Manager - FirstEnergy Nuclear Operating Company Fleet Director BRP/DEP Site BRP/DEP Representative Utility Radiological Safety Board cc