Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML17121A02331 March 2017Emergency Plan Implementing Procedure Revision 0030 to EPIP 8, Personnel Accountability and Evacuation
CNL-17-030, Guarantee of Payment of Deferred Premiums - 2016 Annual Report31 March 2017Guarantee of Payment of Deferred Premiums - 2016 Annual Report
TAC:L2494831 March 2017
ML17090A31131 March 2017Re-registration of Spent Fuel Storage Casks Under Amended Certificate of Compliance
CNL-17-043, Application to Modify Technical Specification 5.7.2.14, Ventilation Filter Testing Program (Vftp).31 March 2017Application to Modify Technical Specification 5.7.2.14, Ventilation Filter Testing Program (Vftp).Fuel cladding
CNL-17-031, Annual Insurance Status Report30 March 2017Annual Insurance Status Report
CNL-17-021, Decommissioning Funding Status Report30 March 2017Decommissioning Funding Status Report
CAC:MF957428 March 2017
NL-17-027, Watts Bar, Unit 2, Application to Modify Operating License Condition Regarding the Actions to Resolve Issues Identified in NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System (391-WBN-TS-17-06)28 March 2017Watts Bar, Unit 2, Application to Modify Operating License Condition Regarding the Actions to Resolve Issues Identified in NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System (391-WBN-TS-17-06)
CNL-17-027, Application to Modify Operating License Condition Regarding the Actions to Resolve Issues Identified in NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System (391-WBN-TS-17-06)28 March 2017Application to Modify Operating License Condition Regarding the Actions to Resolve Issues Identified in NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System (391-WBN-TS-17-06)Anticipated operational occurrence
Cyber Security
Open Phase Condition
Fire Protection Program
CAC:MF799428 March 2017
ML16330A34728 March 2017Issuance of Amendment Nos. 112 and 9 Modification to TS 3.7.10 Discrepancies in Control Room Ventilation and Other Administrative Changes to the Technical SpecificationsTornado Missile
Cyber Security
Fire Protection Program
ML17019A01923 March 2017Issuance of Amendment No. 8 Regarding Steam Generator Minimum Narrow Range Level Administrative ErrorCyber Security
Fire Protection Program
ML17082A62123 March 2017PNO-II-17-002 - Watts Bar Unit 2 Shutdown Due To Condenser Failure
ML17081A45320 March 2017Part 21 - Plastic Jar Dedication Sampling
NL-17-026, Watts Bar, Unit 1 - Application to Modify Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure (390-WBN-TS-17-04)16 March 2017Watts Bar, Unit 1 - Application to Modify Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure (390-WBN-TS-17-04)
CNL-17-026, Application to Modify Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure (390-WBN-TS-17-04)16 March 2017Application to Modify Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure (390-WBN-TS-17-04)Anticipated operational occurrence
Fuel cladding
ML17033A33316 March 2017Issuance of Amendment No. 7 Regarding Cyber Security Plan Milestone 8 Implementation ScheduleCyber Security
Fire Protection Program
ML17076A02016 March 2017NRR E-mail Capture - (External_Sender) Request for Comments on Amendment to Watts Bar Unit 2 Technical Specifications Related to Extension of Surveillance Requirement Intervals
ML17076A02316 March 2017NRR E-mail Capture - Watts Bar, Units 1 and 2 - Final Request for Additional Information Concerning Request to Amend ABGTS TSUnanalyzed Condition
CAC:MF939316 March 2017
IR 05000390/201740515 March 2017Cyber Security Follow-Up Inspection Report 05000390/2017405 and 05000391/2017405 - Letter OnlyCyber Security
Affidavit
CNL-17-039, Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident - Withdrawal of Regulatory..10 March 2017Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident - Withdrawal of Regulatory..Fukushima Dai-Ichi
IR 05000390/201601310 March 2017NRC Problem Identification and Resolution Inspection (Part 2); and Safety Conscious Work Environment Issue of Concern Follow-up; NRC Inspection Report 05000390/2016013, 05000391/2016013Past operability
Condition Adverse to Quality
Significance Determination Process
ML17069A13310 March 2017NRC Problem Identification and Resolution Inspection (Part 2); and Safety Conscious Work Environment Issue of Concern Follow-up; NRC Inspection Report 05000390/2016013, 05000391/2016013Past operability
Condition Adverse to Quality
Significance Determination Process
ML17068A1149 March 2017NRR E-mail Capture - State Consultation Request for Comments on Amendments to Watts Bar, Units 1and 2 - Operating License Amendment Related to Technical Specification Changes to Control Room Ventilation Systems (CAC Nos. MF7993/MF7994)
ML17067A0798 March 2017Submittal of 10 CFR 50.46 - 30-Day and Annual ReportStroke time
CAC:MF31118 March 2017
ML17081A4188 March 201710 CFR 2.206 Petition Review Board (PRB) Conference Call Beyond NuclearAging Management
CAC:MF37697 March 2017
ML17062A6817 March 2017Staff Review of Spent Fuel Pool Evaluation Associated with Reevaluated Seismic Hazard Implementing Near-Term Task Force Recommendation 2.1( CAC Nos. MF3769 and MF3946)Safe Shutdown Earthquake
Fukushima Dai-Ichi
CNL-16-147, Non-Voluntary License Amendment Request to Modify and Clarify Technical Specification 3.6.15, Shield Building, Condition B Note6 March 2017Non-Voluntary License Amendment Request to Modify and Clarify Technical Specification 3.6.15, Shield Building, Condition B NoteAnticipated operational occurrence
Safe Shutdown Earthquake
Fuel cladding
CNL-17-029, Response to Request for Additional Information Regarding License Amendment Request for a One-Time Extension of Technical Specification Surveillance Requirements for AC Sources6 March 2017Response to Request for Additional Information Regarding License Amendment Request for a One-Time Extension of Technical Specification Surveillance Requirements for AC SourcesTime of Discovery
05000390/LER-2017-0033 March 2017Inadequate Operability Determination Leads to a Condition Prohibited by the Technical Specifications
LER 17-003-00 for Watts Bar, Unit 1, Regarding Inadequate Operability Determination Leads to a Condition Prohibited by the Technical Specifications
Safe Shutdown
Safe Shutdown Earthquake
Functionality Assessment
Pressure boundary leak
Through-Wall Leak
ML17062A3392 March 2017NRR E-mail Capture - (External_Sender) CNL-17-020, Response to RAIs on Group 1 SE for Tech Spec Surveillance Extension LAR
CNL-17-036, Response to NRC Request for Tva'S Consent to Imposition of New Requirement Related to Mitigation of Beyond-Design-Basis Events1 March 2017Response to NRC Request for Tva'S Consent to Imposition of New Requirement Related to Mitigation of Beyond-Design-Basis EventsBackfit
IR 05000390/20160061 March 2017Annual Assessment Letter for Watts Bar Nuclear Plant, NRC Inspection Report 05000390/2016006 and 05000391/2016006Open Phase Condition
ML17059C84528 February 2017Single Positive Test Form Collected on 01/06/2016
ML17059C84228 February 2017Single Positive Test Form Collected on 04/18/2016
ML17059C84828 February 2017Single Positive Test Form Collected on 03/21/2016
ML17059C84428 February 2017Single Positive Test Form Collected on 04/10/2016
ML17059C83928 February 2017Single Positive Test Form Collected on 04/18/2016
ML17059C84328 February 2017Single Positive Test Form Collected on 07/22/2016
ML17059C85828 February 2017Annual Fatigue Report Form for 2016
ML17059C84728 February 2017Single Positive Test Form Collected on 05/06/2016
ML17059C84628 February 2017Single Positive Test Form Collected on 04/04/2016
ML17059C85128 February 2017Annual Report Form for Drug and Alcohol Tests for 2016
ML17059C85028 February 2017Single Positive Test Form Collected on 05/31/2016
CNL-17-025, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions27 February 2017Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions
ML17055A24424 February 2017Submittal of Emergency Plan Implementing Procedure Revision