Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML17143A01331 March 2017After Action Report/Improvement Plan, Exercise Date - November 16, 2016, Radiological Emergency Preparedness (REP) ProgramNuclear Accident Reporting System
Scram Discharge Volume
Siren
RS-17-045, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations30 March 2017Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage InstallationsDecommissioning Funding Plan
RS-16-046, Annual Property Insurance Status Report29 March 2017Annual Property Insurance Status Report
RS-17-049, Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process28 March 2017Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement ProcessSafe Shutdown
Time of Discovery
Missed surveillance
CAC:MF947028 March 2017
05000254/LER-2017-00122 March 2017Secondary Containment Interlock Doors Opened Simultaneously
LER 17-001-00 for Quad Cities, Unit 1, Regarding Secondary Containment Interlock Doors Opened Simultaneously
Probabilistic Risk Assessment
ML17079A44222 March 2017Correction Letter to Renewed Facility Operating License No. DPR-30 Technical Specification Page
ML17025A24821 March 2017Relaxation of Schedule Requirements for Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Order EA-13-109.Fukushima Dai-Ichi
CAC:MF928620 March 2017
ML17080A03720 March 2017NRR E-mail Capture - Acceptance of Relief Request I5R-11, Revision 2 for Review
RS-17-044, Response to Request for Additional Information Regarding Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography13 March 2017Response to Request for Additional Information Regarding Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of RadiographyHydrostatic
Nondestructive Examination
Incorporated by reference
Dissimilar Metal Weld
ML17066A0908 March 2017Request for Additional Information Concerning Proposed Changes to Revise Loss of Voltage Relay Settings (CAC Nos. MF8381 and MF8382) (RS-16-162)Anticipated operational occurrence
ML17062A4913 March 2017NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Fleet Alternative to RPV Threads in Flange Examination (CAC Nos. MF8712-MF8729)
ML17039A8932 March 2017Letter to Those on the Attached List - Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (Batch 1)
IR 05000254/20160061 March 2017Annual Assessment Letter for Quad Cities Nuclear Station, Units 1 and 2 (Report 05000254/2016006; 05000265/2016006)Spent Fuel Pool Instrumentation
RS-17-009, Board Resolutions Associated with Foreign Ownership, Control, or Influence1 March 2017Board Resolutions Associated with Foreign Ownership, Control, or Influence
RS-17-022, Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events28 February 2017Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External EventsEmergency Lighting
FLEX
Spent Fuel Pool Instrumentation
Containment Hardened Vent
ML17058A35027 February 2017Annual Fatigue Report Form for 2016
RS-17-023, Submittal of Annual 2016 Fitness for Duty Performance Data Reports27 February 2017Submittal of Annual 2016 Fitness for Duty Performance Data ReportsFitness for Duty
ML17053A52122 February 2017Scheduling of Initial Operator License Examinations - Quad Cities Nuclear Power Station, Units 1 and 2
ML17037D21216 February 2017Issuance of Amendments to Revise Surveillance Requirement for Secondary Containment Access DoorsCyber Security
Surveillance Frequency Control Program
Safeguards Contingency Plan
Maintenance Rule Program
Recently irradiated fuel
Fire Protection Program
RS-17-014, Reactor Pressure Vessel Penetration N-11B Repair Relief Request I5R-1114 February 2017Reactor Pressure Vessel Penetration N-11B Repair Relief Request I5R-11Nondestructive Examination
Dissimilar Metal Weld
IR 05000254/20174079 February 2017Temporary Instruction 2800/041, 10CFR Part 37, Physical Protection of Category 1 and Category 2, 10CFR Part 73, Physical Protection Program; Inspection Report 05000254/2017407 and 05000265/2017407 (Cover Letter Only)Affidavit
ML17072A0019 February 2017NRR E-mail Capture - Draft RAI for QC LAR Re Loss of Voltage Relay Setting ChangeAnticipated operational occurrence
RA-17-007, Summary of Changes to Quality Assurance Topical Report NO-AA-108 February 2017Summary of Changes to Quality Assurance Topical Report NO-AA-10
ML17033A0621 February 2017Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000254/2017001; 05000265/2017001Nondestructive Examination
Foreign Material Exclusion
Scaffolding
RS-17-008, Fifth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident.26 January 2017Fifth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident.Tornado Missile
FLEX
Tornado Missile Protection
Design basis earthquake
Containment Hardened Vent
Battery sizing
ML17023A26723 January 2017NRR E-mail Capture - Acceptance of Relief Request I5R-07 for Review
ML16257A49623 January 2017FRN: Clinton, Quad Cities, & Oyster Creek - FRN Exemption from the Requirements of 10 CFR Part 73, Sections 55(p)(1)(i) and (p)(1)(ii) Related to the Suspension of Security Measures in an Emergency or During Severe Weather (CAC Nos. MF8275Exemption Request
ML16257A48023 January 2017Letter Exemption from the Requirements of 10 CFR Part 73, Sections 55(p)(1)(i) and (p)(1)(ii) Related to the Suspension of Security Measures in an Emergency or During Severe Weather (CAC Nos. MF8275 - MF8278)Exemption Request
NRC-2017-0014, FRN: Clinton, Quad Cities, & Oyster Creek - FRN Exemption from the Requirements of 10 CFR Part 73, Sections 55(p)(1)(i) and (p)(1)(ii) Related to the Suspension of Security Measures in an Emergency or During Severe Weather (CAC Nos. MF23 January 2017FRN: Clinton, Quad Cities, & Oyster Creek - FRN Exemption from the Requirements of 10 CFR Part 73, Sections 55(p)(1)(i) and (p)(1)(ii) Related to the Suspension of Security Measures in an Emergency or During Severe Weather (CAC Nos. MF8275Exemption Request
IR 05000254/201600420 January 2017NRC Integrated Inspection Report 05000254/2016004; 05000265/2016004; 05000254/2016501 and 05000265/2016501Safe Shutdown
Probabilistic Risk Assessment
Temporary Modification
Significance Determination Process
Foreign Material Exclusion
Operability Determination
Through-Wall Leak
Through Wall Leak
Fire Protection Program
Power change
ML16354A14919 January 2017FRN, Withdrawal of Amendment Requests Regarding Decommissioning Licensing Actions (CAC Nos. MF8509 and MF8510) (Pid L-LA-2016-0004) (RS-16-201)
ML16354A14419 January 2017Acknowledgement of Continuation of Operations
ML17005A33819 January 2017Letter, Withdrawal of Amendment Requests Regarding Decommissioning Licensing Actions (CAC Nos. MF8509 and MF8510) (Pid L-LA-2016-0004) (RS-16-201)
NRC-2016-0245, Letter, Withdrawal of Amendment Requests Regarding Decommissioning Licensing Actions (CAC Nos. MF8509 and MF8510) (Pid L-LA-2016-0004) (RS-16-201)19 January 2017Letter, Withdrawal of Amendment Requests Regarding Decommissioning Licensing Actions (CAC Nos. MF8509 and MF8510) (Pid L-LA-2016-0004) (RS-16-201)
RS-17-006, Request for Extension to Comply with NRC Order EA-13-109, Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions and NRC Order EA-12-049, Order Modifying Licenses W12 January 2017Request for Extension to Comply with NRC Order EA-13-109, Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions and NRC Order EA-12-049, Order Modifying Licenses WiFLEX
Fukushima Dai-Ichi
B.5.b Mitigating Strategies
Hardened vent
ML17010A0569 January 2017GFE Annual Registration Letter - 2017 Examinations - Region IIIGeneric Fundamentals Examination
SVP-17-002, O CFR 50.59 I 1 O CFR 72.48 Summary Report5 January 2017O CFR 50.59 I 1 O CFR 72.48 Summary Report