Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
RA17-031, Post Accident Monitoring Report | 31 March 2017 | Post Accident Monitoring Report | Post Accident Monitoring |
RS-17-045, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations | 30 March 2017 | Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations | Decommissioning Funding Plan |
05000374/LER-2017-002 | 30 March 2017 | High Pressure Core Spray System Declared Inoperable due to Cooling Water Strainer Backwash Valve Stem-Disc Separation LER 17-002-00 for LaSalle, Unit 2, Regarding High Pressure Core Spray System Declared Inoperable due to Cooling Water Strainer Backwash Valve Stem-Disc Separation | Anchor Darling |
ML17088A624 | 29 March 2017 | Request for Information for an NRC Design Bases Assurance Inspection (Program): Implementation of the Environmental Qualification Program Inspection Report 05000373/2017008; 05000374/2017008 | High Radiation Area Commercial Grade Dedication |
RS-16-046, Annual Property Insurance Status Report | 29 March 2017 | Annual Property Insurance Status Report | |
RS-17-049, Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process | 28 March 2017 | Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process | Safe Shutdown Time of Discovery Missed surveillance |
CAC:MF9470 | 28 March 2017 | ||
05000374/LER-2017-001 | 24 March 2017 | Manual Reactor Scram due to Turbine-Generator Run-Back Caused by Stem-Disc Separation in Stator Water Cooling Heat Exchanger Inlet Valve LER 17-001-00 for LaSalle County, Unit 2 Regarding Manual Reactor Scram due to Turbine-Generator Run-Back Caused by Stem-Disc Separation in Stator Water Cooling Heat Exchanger Inlet Valve | Safe Shutdown |
ML17081A453 | 20 March 2017 | Part 21 - Plastic Jar Dedication Sampling | |
RA-17-029, Cycle 17 Core Operating Limits Report (COLR) | 17 March 2017 | Cycle 17 Core Operating Limits Report (COLR) | Minimum Critical Power Ratio MELLLA |
RS-17-044, Response to Request for Additional Information Regarding Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography | 13 March 2017 | Response to Request for Additional Information Regarding Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography | Hydrostatic Nondestructive Examination Incorporated by reference Dissimilar Metal Weld |
ML17041A369 | 9 March 2017 | Letter to Those on the Attached List - Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools Following Review of Additional Information - Licensee-Reported Category 3 Plants (Batch 2) | |
RS-17-025, Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal | 8 March 2017 | Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal | Safe Shutdown Internal Flooding Hydrostatic FLEX Fukushima Dai-Ichi Flooding Focused Evaluation |
RS-17-034, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors | 7 March 2017 | Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors | |
ML17062A491 | 3 March 2017 | NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Fleet Alternative to RPV Threads in Flange Examination (CAC Nos. MF8712-MF8729) | |
ML17038A129 | 2 March 2017 | Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Consideration and Containing SUNSI and Order Imposing Procedures for Access to SUNSI - Publication Date: March 8, 201 | Hydrostatic Exemption Request Earthquake |
NRC-2017-0047, Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Consideration and Containing SUNSI and Order Imposing Procedures for Access to SUNSI - Publication Date: March 8 | 2 March 2017 | Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Consideration and Containing SUNSI and Order Imposing Procedures for Access to SUNSI - Publication Date: March 8, 201 | Hydrostatic Exemption Request Earthquake |
IR 05000373/2016006 | 1 March 2017 | Annual Assessment Letter for LaSalle County Station, Units 1 and 2 (Report 05000373/2016006 and 05000374/2016006) | |
RS-17-009, Board Resolutions Associated with Foreign Ownership, Control, or Influence | 1 March 2017 | Board Resolutions Associated with Foreign Ownership, Control, or Influence | |
ML17059C583 | 1 March 2017 | Relief from ASME Code for OM Code Re. RR RV-01 Proposed Alternative to Inservice Testing Requirement of ASME Code for OM Code | Stroke time Probabilistic Risk Assessment Incorporated by reference |
RS-17-019, Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events | 28 February 2017 | Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events | High winds Safe Shutdown Earthquake FLEX Spent Fuel Pool Instrumentation |
RS-17-023, Submittal of Annual 2016 Fitness for Duty Performance Data Reports | 27 February 2017 | Submittal of Annual 2016 Fitness for Duty Performance Data Reports | Fitness for Duty |
ML17058A306 | 27 February 2017 | Annual Fatigue Report Form for 2016 | |
ML17047A586 | 22 February 2017 | Letter to Licensee, Approvals of Relief Requests-RP-02, and RP-03 for the Fourth 10-Year Inservice Testing Intervals (CAC Nos. MF8494 - MF8497) | |
ML17024A265 | 22 February 2017 | Letter to Licensee, Approvals of Relief Requests-G-01, RP-01, and RP-04 for the Fourth 10-Year Inservice Testing Intervals (MF8490, MF8491, MF8492, MF8493, MF8498, and MF8499) | Incorporated by reference |
RS-17-024, Supplement to License Amendment Request for Permanent Extension of Type a and Type C Leak Rate Test Frequencies Regarding Hardened Containment Vent System Modifications and Installation of Primary Containment Isolation Valves | 16 February 2017 | Supplement to License Amendment Request for Permanent Extension of Type a and Type C Leak Rate Test Frequencies Regarding Hardened Containment Vent System Modifications and Installation of Primary Containment Isolation Valves | Containment Hardened Vent |
ML17037D212 | 16 February 2017 | Issuance of Amendments to Revise Surveillance Requirement for Secondary Containment Access Doors | Cyber Security Surveillance Frequency Control Program Safeguards Contingency Plan Maintenance Rule Program Recently irradiated fuel Fire Protection Program |
ML17045A198 | 14 February 2017 | Information Request to Support Upcoming Problem Identification and Resolution Inspection at the LaSalle County Station | Temporary Modification Maintenance Rule Program |
RS-17-010, Response to Request for Additional Information Regarding LaSalle County Station Alternative Request RV-01 for the Lnservice Testing Program Fourth 10-Year Interval | 9 February 2017 | Response to Request for Additional Information Regarding LaSalle County Station Alternative Request RV-01 for the Lnservice Testing Program Fourth 10-Year Interval | |
05000373/LER-2017-001 | 8 February 2017 | Reactor Core Isolation Cooling System Inoperable Longer than Allowed by the Technical Specifications due to Low Suction Pressure Trips LER 17-001-00 for LaSalle County, Unit 1, Regarding Reactor Core Isolation Cooling System Inoperable Longer than Allowed by the Technical Specifications due to Low Suction Pressure Trips | |
RA-17-007, Summary of Changes to Quality Assurance Topical Report NO-AA-10 | 8 February 2017 | Summary of Changes to Quality Assurance Topical Report NO-AA-10 | |
ML17037B850 | 6 February 2017 | 08/21/1975 Notice of Meeting with Architect Engineers of Mark II Owners to Discuss Load Combinations and Analytical Techniques for Determining Stresses in Mechanical Components and Structures of Mark II Containments | |
ML17031A425 | 6 February 2017 | Staff Review of High Frequency Confirmation Associated with Reevaluated Seismic Hazard Implementing Near-Term Task Force Recommendation 2.1 | Safe Shutdown Earthquake Probabilistic Risk Assessment Fukushima Dai-Ichi |
IR 05000373/2016004 | 1 February 2017 | NRC Integrated Inspection Report 05000373/2016004, 05000374/2016004, 05000373/2016501 and 05000374/2016501 | High Radiation Area Internal Flooding Hydrostatic Probabilistic Risk Assessment Temporary Modification Locked High Radiation Area Fukushima Dai-Ichi Significance Determination Process Operability Determination Fire Protection Program Operability Assessment |
ML17026A414 | 20 January 2017 | C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling | |
ML16365A053 | 12 January 2017 | Request for Withholding Information from Public Disclosure Regarding License Amendment Request Concerning Revision to Suppression Pool Swell Design Analysis (CAC Nos. MF8702 and MF8703) | |
ML16355A418 | 11 January 2017 | Flood Hazard Mitigation Strategies Assessment | Ultimate heat sink FLEX Fukushima Dai-Ichi Flood Hazard Mitigation Strategies Assessment |
ML16350A219 | 10 January 2017 | Staff Assessment of Response to 10 Cfr 50.54(F) Information Request - Flood-Causing Mechanism Reevaluation (CAC Nos. Mf3655 and Mf3656) | High winds Hydrostatic Fukushima Dai-Ichi Earthquake |
ML17010A104 | 10 January 2017 | Request for Additional Information Regarding Alternative Request RV-01 for the Fourth 10-Year Inservice Testing Intervals | |
CAC:MF3655 | 10 January 2017 | ||
ML17009A099 | 9 January 2017 | Single Positive Test Form Collected on 03/21/2016 | |
ML17009A091 | 9 January 2017 | Single Positive Test Form Collected on 02/09/2016 | |
ML17009A095 | 9 January 2017 | Single Positive Test Form Collected on 02/11/2016 | |
ML17009A093 | 9 January 2017 | Single Positive Test Form Collected on 02/11/2016 | |
ML17009A097 | 9 January 2017 | Single Positive Test Form Collected on 02/16/2016 | |
ML17009A096 | 9 January 2017 | Single Positive Test Form Collected on 02/15/2016 | |
ML17009A101 | 9 January 2017 | Single Positive Test Form Collected on 04/21/2016 | |
ML17009A100 | 9 January 2017 | Single Positive Test Form Collected on 04/05/2016 | |
ML17009A102 | 9 January 2017 | Single Positive Test Form Collected on 08/18/2016 | |
ML17009A092 | 9 January 2017 | Single Positive Test Form Collected on 02/09/2016 |