MONTHYEARRA24-008, Post-Outage Inservice Inspection (ISI) Summary Report2024-06-20020 June 2024 Post-Outage Inservice Inspection (ISI) Summary Report RA24-023, Response to NRC LaSalle County Station, Units 1 and 2, Integrated Inspection Report 05000373/2024001 and 05000374/20240012024-06-12012 June 2024 Response to NRC LaSalle County Station, Units 1 and 2, Integrated Inspection Report 05000373/2024001 and 05000374/2024001 RA24-011, 2023 Annual Radiological Environmental Operating Report2024-05-0303 May 2024 2023 Annual Radiological Environmental Operating Report RA24-009, 2023 Annual Radioactive Effluent Release Report2024-04-26026 April 2024 2023 Annual Radioactive Effluent Release Report RA24-010, Annual Dose Report for 20232024-04-24024 April 2024 Annual Dose Report for 2023 RA24-006, Cycle 21 Core Operating Limits Reports2024-03-11011 March 2024 Cycle 21 Core Operating Limits Reports RA23-072, Regulatory Commitment Change Summary Report2023-12-15015 December 2023 Regulatory Commitment Change Summary Report RA23-057, Registration of Use of Cask to Store Spent Fuel2023-08-11011 August 2023 Registration of Use of Cask to Store Spent Fuel RA23-055, Registration of Use of Cask to Store Spent Fuel2023-08-11011 August 2023 Registration of Use of Cask to Store Spent Fuel RA23-052, Registration of Use of Cask to Store Spent Fuel2023-08-0404 August 2023 Registration of Use of Cask to Store Spent Fuel RA23-051, Registration of Use of Cask to Store Spent Fuel2023-07-21021 July 2023 Registration of Use of Cask to Store Spent Fuel RA23-048, Registration of Use of Cask to Store Spent Fuel2023-07-14014 July 2023 Registration of Use of Cask to Store Spent Fuel RA23-045, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation2023-06-30030 June 2023 Completion of License Renewal Activities Prior to Entering the Period of Extended Operation RA23-047, Registration of Use of Cask to Store Spent Fuel2023-06-30030 June 2023 Registration of Use of Cask to Store Spent Fuel RA23-018, Post-Outage Inservice Inspection (ISI) Summary Report2023-06-27027 June 2023 Post-Outage Inservice Inspection (ISI) Summary Report RA23-046, Registration of Use of Cask to Store Spent Fuel2023-06-23023 June 2023 Registration of Use of Cask to Store Spent Fuel RA23-042, Registration of Use of Cask to Store Spent Fuel2023-06-16016 June 2023 Registration of Use of Cask to Store Spent Fuel RA23-029, 2022 Annual Radiological Environmental Operating Report2023-05-12012 May 2023 2022 Annual Radiological Environmental Operating Report RA23-028, Submittal of 2022 Annual Radioactive Effluent Release Report2023-04-28028 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report RA23-027, Annual Dose Report for 20222023-04-21021 April 2023 Annual Dose Report for 2022 RA23-025, Post Accident Monitoring Report2023-04-0707 April 2023 Post Accident Monitoring Report RA23-013, Submittal of Triennial Chlorine Survey Report2023-03-30030 March 2023 Submittal of Triennial Chlorine Survey Report RA23-019, Cycle 20 Core Operating Limits Reports2023-03-21021 March 2023 Cycle 20 Core Operating Limits Reports RA22-066, 150 Day Submittal Cover Letter2022-12-0202 December 2022 150 Day Submittal Cover Letter RA22-060, Regulatory Commitment Change Summary Report2022-11-30030 November 2022 Regulatory Commitment Change Summary Report RA22-051, Submittal of the Snubber Program Plan for the Fourth 10-Year Interval2022-11-16016 November 2022 Submittal of the Snubber Program Plan for the Fourth 10-Year Interval RA22-041, Unit 2 Cycle 19 Core Operating Limits Report Revision2022-10-0505 October 2022 Unit 2 Cycle 19 Core Operating Limits Report Revision RA22-029, Cycle 20 Startup Test Report Summary2022-06-10010 June 2022 Cycle 20 Startup Test Report Summary RA22-021, Post-Outage 90-Day Inservice Inspection (ISI) Summary Report2022-06-0808 June 2022 Post-Outage 90-Day Inservice Inspection (ISI) Summary Report RA22-020, Annual Radiological Environmental Operating Report2022-05-13013 May 2022 Annual Radiological Environmental Operating Report RA22-018, Annual Dose Report for 20212022-04-22022 April 2022 Annual Dose Report for 2021 RA22-010, Cycle 20 Core Operating Limits Reports2022-03-21021 March 2022 Cycle 20 Core Operating Limits Reports RA21-059, Regulatory Commitment Change Summary Report2021-11-30030 November 2021 Regulatory Commitment Change Summary Report RA21-050, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation2021-11-0909 November 2021 Completion of License Renewal Activities Prior to Entering the Period of Extended Operation RA21-051, County Station Physical Security Plan (Revision 18)2021-09-29029 September 2021 County Station Physical Security Plan (Revision 18) RA21-052, Registration of Use of Cask Store Spent Fuel2021-09-17017 September 2021 Registration of Use of Cask Store Spent Fuel RA21-046, Registration of Use of Cask to Store Spent Fuel2021-08-0505 August 2021 Registration of Use of Cask to Store Spent Fuel RA21-043, Cycle 19 Startup Test Report Summary2021-07-15015 July 2021 Cycle 19 Startup Test Report Summary RA21-031, 2020 Annual Radiological Environmental Operating Report2021-05-13013 May 2021 2020 Annual Radiological Environmental Operating Report RA21-029, Unit 2 - 2020 Annual Radioactive Effluent Release Report2021-04-29029 April 2021 Unit 2 - 2020 Annual Radioactive Effluent Release Report RA21-026, Annual Dose Report for 20202021-04-22022 April 2021 Annual Dose Report for 2020 RA21-016, Netco Rack Insert 10-year Surveillance Report2021-04-15015 April 2021 Netco Rack Insert 10-year Surveillance Report RA21-017, Post-Outage 90-Day Inservice Inspection (ISI) Summary Report2021-04-0909 April 2021 Post-Outage 90-Day Inservice Inspection (ISI) Summary Report RA21-019, Unit 2 Cycle 19 Core Operating Limits Reports2021-04-0707 April 2021 Unit 2 Cycle 19 Core Operating Limits Reports RA20-058, Licensee Post Exam Submittal Letter2020-12-0202 December 2020 Licensee Post Exam Submittal Letter RA20-044, Unit 2 - Unit 1 Cycle 19 Core Operating Limits Report2020-09-10010 September 2020 Unit 2 - Unit 1 Cycle 19 Core Operating Limits Report RA20-026, 2019 Annual Radiological Environmental Operating Report2020-05-13013 May 2020 2019 Annual Radiological Environmental Operating Report RA20-023, Annual Dose Report for 20192020-04-28028 April 2020 Annual Dose Report for 2019 RA20-016, Corrected Drawing for One-Line Electrical Power Supply for Containment Vent System Final Integrated Plan2020-03-24024 March 2020 Corrected Drawing for One-Line Electrical Power Supply for Containment Vent System Final Integrated Plan RA20-015, Triennial Chlorine Survey Report2020-03-20020 March 2020 Triennial Chlorine Survey Report 2024-06-20
[Table view] |
Text
LaSalle County Station Exelon Generation,. 2601 North 21st Road Marseilles, IL 61341 815-415-2000 Telephone www.exeloncorp.com RA17-031 March 31, 2017 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 LaSalle County Station, Unit 1 Renewed Facility Operating License No. NPF-11 NRC Docket No. 50-373
Subject:
Post Accident Monitoring Report The attached report is submitted in accordance with LaSalle County Station, Unit 1 Technical Specifications (TS) 3.3.3.1, "Post Accident Monitoring (PAM) Instrumentation,"
and TS 5.6.6, "Post Accident Monitoring (PAM) Instrumentation Report." The report is required due to the inoperability of one testable check valve position indication for a period greater than the 30 day restoration time. Accordingly, this report is due on April 3, 2017.
There are no regulatory commitments contained in this letter. Should you have any questions concerning this letter, please contact Mr. Guy V. Ford, Jr., Regulatory Assurance Manager, at (815) 415-2800.
Respectfully, W1"--f;CfL William J. Trafton Site Vice President LaSalle County Station
Attachment:
LaSalle Unit 1 Post Accident Monitoring Report cc: Regional Administrator- NRC Region Ill NRC Senior Resident Inspector- LaSalle County Station
LaSalle Unit 1 Post Accident Monitoring Report This report is submitted for LaSalle County Station, Unit 1 in accordance with Technical Specifications (TS) 5.6.6, "Post Accident Monitoring (PAM) Instrumentation Report."
Additionally, TS 3.3.3.1, "Post Accident Monitoring (PAM) Instrumentation," requires two channels of Penetration Flow Path Primary Containment Isolation Valve (PCIV) position indication to be operable during plant operations in Modes 1 and 2.
On February 17, 2017, the position indication for one feedwater line outboard testable check valve was declared inoperable and TS 3.3.3.1, Condition A was entered, which requires restoration of the channel to operable status in 30 days. If TS 3.3.3.1, Condition A is not satisfied within 30 days, then TS 3.3.3.1, Condition B is entered.
Exelon Generation Company, LLC has determined that the position indication cannot be restored with 30 days; therefore, TS 3.3.3.1, Condition B requires immediate initiation of action in accordance with TS 5.6.6 to submit a written report within 14 days outlining the preplanned alternate method of monitoring, the cause of the inoperability and the plans/schedule for restoring the instrument channel of the function to operable status.
Description of Issue On February 17, 2017, the light indication for the Unit 1 'A' feedwater line outboard testable check valve 1B21-F032A at Main Control Room (MGR) panel 1H13-P601 indicated that the valve was full open, based on the open light on and closed light off.
The white light that indicates the valve was less than 85 percent open was also lit, which was consistent with plant operations at the time with 10 percent reactor power with low feed flow. However, at these plant conditions the closed light would be expected to also be lit, but it was not.
The closed indication light bulb was replaced, and the resistor and socket were verified functional as part of troubleshooting. Shift operations verified the feed flow by trending the plant process computer (PPG) points for feedwater 'A' and 'B' header flow, with no discrepancies noted. Both loops trended together within tolerance. Without the positive closed indication in the MCA, the valve position indication was declared inoperable.
Preplanned Alternate Method of Monitoring PPG Primary Containment Isolation System (PCIS) screen and PPG points 0779 and 0780 are the preplanned alternate method for monitoring the post-accident position of valve 1821-F032A.
Cause of the Inoperable Condition The cause of valve 1B21-F032A position indication malfunction is the limit switches, which require adjustment. Based on the flow indications observed, the valve remains fully functional. However, in order to perform the required surveillances for the closed indication of valve 1B21-F032A, the system is required to have no system flow. Further troubleshooting and repair of the limit switches were precluded while the plant is operating in Mode 1 with the feedwater system in service.
Plans and Schedule for Restoration The repair of the limit switches are scheduled for the first opportunity, in accordance with the station work control process, no later than the upcoming Unit 1 refueling outage L 1R17 scheduled for February 2018.