ML18053A740 | 19 December 2017 | Duke Energy Wsl III Units 1 & 2 COL (Updated Final Safety Analysis Report) Rev.1 - UFSAR Chapter 14 - Initital Test Program | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Non-Destructive Examination Grab sample Safe Shutdown Earthquake Hydrostatic Probabilistic Risk Assessment Coatings Squib Emergency Lighting Pressure boundary leak Scaffolding Flow Induced Vibration Overspeed trip |
ML18053A704 | 19 December 2017 | Duke Energy Wsl III Units 1 & 2 COL (Updated Final Safety Analysis Report) Rev.1 - UFSAR Appendix 2AA, Attachments | |
ML18053A707 | 19 December 2017 | Duke Energy Wsl III Units 1 & 2 COL (Updated Final Safety Analysis Report) Rev.1 - UFSAR Appendix 2BB, Attachments | |
ML18053A712 | 19 December 2017 | Duke Energy Wsl III Units 1 & 2 COL (Updated Final Safety Analysis Report) Rev.1 - UFSAR Chapter 02 - Site Characteristics, Part 2 of 6 | Safe Shutdown Boric Acid Ultimate heat sink Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Frazil ice License Renewal Earthquake |
ML18053A724 | 19 December 2017 | Duke Energy Wsl III Units 1 & 2 COL (Updated Final Safety Analysis Report) Rev.1 - UFSAR Chapter 03 - Design of Structures, Components, Equipment and Systems, Part 2 of 2 | Safe Shutdown Boric Acid Tornado Missile Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Nondestructive Examination Squib Finite Element Analysis Stress corrosion cracking Earthquake Dissimilar Metal Weld Loctite Flow Induced Vibration |
ML18053A725 | 19 December 2017 | Duke Energy Wsl III Units 1 & 2 COL (Updated Final Safety Analysis Report) Rev.1 - UFSAR Chapter 04 - Reactor | Boric Acid Shutdown Margin Grab sample Safe Shutdown Earthquake Probabilistic Risk Assessment Nondestructive Examination Stress corrosion cracking Rod Drop Event Earthquake Fuel cladding Power change Overspeed trip |
ML18053A727 | 19 December 2017 | Duke Energy Wsl III Units 1 & 2 COL (Updated Final Safety Analysis Report) Rev.1 - UFSAR Chapter 05 - Reactor Coolant System and Connected Systems | Safe Shutdown Boric Acid Loop seal Stroke time Safe Shutdown Earthquake Hydrostatic Probabilistic Risk Assessment Coatings Nondestructive Examination Squib VT-2 Incorporated by reference Pressure and Temperature Limits Report Stress corrosion cracking Eddy Current Testing Earthquake Power-Operated Valves Power Operated Valves Liquid penetrant Pressure Boundary Leakage Dissimilar Metal Weld Power change Unidentified leakage Overspeed trip |
ML18053A729 | 19 December 2017 | Duke Energy Wsl III Units 1 & 2 COL (Updated Final Safety Analysis Report) Rev.1 - UFSAR Chapter 07 - Instrumentation and Controls | Safe Shutdown Boric Acid Shutdown Margin Anticipated operational occurrence Probabilistic Risk Assessment Squib Water level shrink Commercial Grade Fuel cladding Power change |
ML18053A730 | 19 December 2017 | Duke Energy Wsl III Units 1 & 2 COL (Updated Final Safety Analysis Report) Rev.1 - UFSAR Chapter 08 - Electric Power | Safe Shutdown Fire Barrier Safe Shutdown Earthquake Probabilistic Risk Assessment Coatings Emergency Lighting Open Phase Condition Residual voltage transfer Maintenance Rule Program Offsite Circuit Thermography |
ML18053A735 | 19 December 2017 | Duke Energy Wsl III Units 1 & 2 COL (Updated Final Safety Analysis Report) Rev.1 - UFSAR Chapter 10 - Steam and Power Conversion | Safe Shutdown Grab sample Anticipated operational occurrence Safe Shutdown Earthquake Hydrostatic Probabilistic Risk Assessment Design basis earthquake Flow Accelerated Corrosion Stress corrosion cracking Earthquake Turbine Missile Power change Overspeed trip |
ML18053A736 | 19 December 2017 | Duke Energy Wsl III Units 1 & 2 COL (Updated Final Safety Analysis Report) Rev.1 - UFSAR Chapter 11 - Radioactive Waste Management | Safe Shutdown Boric Acid Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Hydrostatic Probabilistic Risk Assessment Process Control Program Fuel cladding Pressure Boundary Leakage Pressure boundary leak |
ML18053A739 | 19 December 2017 | Duke Energy Wsl III Units 1 & 2 COL (Updated Final Safety Analysis Report) Rev.1 - UFSAR Chapter 13 - Conduct of Operation | Safe Shutdown Fitness for Duty Offsite Dose Calculation Manual Probabilistic Risk Assessment Cyber Security Process Control Program Safeguards Contingency Plan License Renewal Earthquake Fire Protection Program Fire Watch Power change |
ML18053A741 | 19 December 2017 | Duke Energy Wsl III Units 1 & 2 COL (Updated Final Safety Analysis Report) Rev.1 - UFSAR Chatper 15 - Accident Analyses | Safe Shutdown Boric Acid Shutdown Margin Packing leak Stroke time Anticipated operational occurrence Safe Shutdown Earthquake Probabilistic Risk Assessment Squib Power-Operated Valves Fuel cladding Coast down GOTHIC Power Uprate Overspeed trip |
ML18053A743 | 19 December 2017 | Duke Energy Wsl III Units 1 & 2 COL (Updated Final Safety Analysis Report) Rev.1 - UFSAR Chapter 16 - Technical Specifications | Safe Shutdown Post Accident Monitoring Probabilistic Risk Assessment Fuel cladding |
ML18053A744 | 19 December 2017 | Duke Energy Wsl III Units 1 & 2 COL (Updated Final Safety Analysis Report) Rev.1 - UFSAR Chatper 17 - Quality Assurance | High winds Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Squib Maintenance Rule Program Fuel cladding |
ML18053A746 | 19 December 2017 | Duke Energy Wsl III Units 1 & 2 COL (Updated Final Safety Analysis Report) Rev.1 - UFSAR Chapter 18 - Human Factors Engineering | Safe Shutdown High Radiation Area Safe Shutdown Earthquake Probabilistic Risk Assessment Emergency Lighting Condition Adverse to Quality Fuel cladding |
ML18054A107 | 19 December 2017 | William States Lee III Nuclear Station, Units 1 & 2 - Submittal of Updated Final Safety Analysis Report, Revision 1 | Incorporated by reference Affidavit |
RA-17-0054, Duke Energy - NRC Correspondence Distribution List Update | 19 December 2017 | Duke Energy - NRC Correspondence Distribution List Update | |
ML17276B330 | 20 October 2017 | Levy County, and William States Lee III - Use of Encryption Software for Electric Transmission of Safeguards Information (CAC Nos. MG0162 - MG0172; EPID L-2017-LRO-0027) | |
RA-17-0032, Use of Encryption Software for Electronic Transmission of Safeguards Information | 29 August 2017 | Use of Encryption Software for Electronic Transmission of Safeguards Information | |
CAC:MG0162 | 29 August 2017 | | |
ML17188A387 | 21 August 2017 | Issuance of Amendments Regarding Application to Consolidate Emergency Operations Facilities and Associated Emergency Plan Changes (CAC Nos. MF7650 Through MF7660) | Probabilistic Risk Assessment |
RA-17-0002, William State Lee - Supplemental Information Regarding Application for Emergency Operations Facility (EOF) Consolidation | 16 January 2017 | William State Lee - Supplemental Information Regarding Application for Emergency Operations Facility (EOF) Consolidation | Health Physics Network Probabilistic Risk Assessment Cyber Security Fuel cladding |