Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
RS-16-075, Supplemental Information Regarding License Amendment Request to Revise Technical Specification Section 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test. | 31 March 2016 | Supplemental Information Regarding License Amendment Request to Revise Technical Specification Section 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test. | Mission time Internal Flooding Probabilistic Risk Assessment |
RS-16-058, Clinton, Unit 1 - Transmittal of Exelon Nuclear Radiological Emergency Plan Addendum Revision | 28 March 2016 | Clinton, Unit 1 - Transmittal of Exelon Nuclear Radiological Emergency Plan Addendum Revision | Spent Fuel Pool Instrumentation |
RS-16-058, EP-AA-1003, Addendum 3, Revision 1, Emergency Action Levels for Clinton Station. | 28 March 2016 | EP-AA-1003, Addendum 3, Revision 1, Emergency Action Levels for Clinton Station. | Safe Shutdown High winds Ultimate heat sink Fire Barrier Safe Shutdown Earthquake Internal Flooding Operating Basis Earthquake Operator Manual Action Nuclear Accident Reporting System Earthquake Fuel cladding Pressure Boundary Leakage Power change |
ML16088A396 | 28 March 2016 | Transmittal of Exelon Nuclear Radiological Emergency Plan Addendum Revision | Spent Fuel Pool Instrumentation |
RS-16-055, Mitigating Strategies Flood Hazard Assessment (Msfha) Submittal | 24 March 2016 | Mitigating Strategies Flood Hazard Assessment (Msfha) Submittal | Safe Shutdown FLEX Fukushima Dai-Ichi |
Press Release-III-16-003, NRC to Discuss Performance of Clinton Nuclear Power Station March 30 | 23 March 2016 | Press Release-III-16-003: NRC to Discuss Performance of Clinton Nuclear Power Station March 30 | |
TAC:MF7370 | 22 March 2016 | ||
ML16077A156 | 22 March 2016 | Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards | |
IR 05000461/2016008 | 17 March 2016 | NRC Supplemental Inspection Report 05000461/2016008 January 25, 2016 February 4, 2016, and Assessment Follow-Up Letter | Condition Adverse to Quality Significance Determination Process |
ML16076A120 | 17 March 2016 | Supplemental Information Needed for Acceptance of Requested Licensing Action Concerning Extension of Leak Rate Testing (CAC No. MF7290)(RS-16-015) | Probabilistic Risk Assessment |
ML16076A172 | 17 March 2016 | Acceptance Review Concerning Incorporation of Revised Alternative Source Term (CAC No. MF7336) (RS-16-019) | |
CAC:MF7336 | 17 March 2016 | ||
ML16075A329 | 16 March 2016 | OEDO-16-00165 - Briefing Package for Drop-In Visit on March 23, 2016, by Senior Management of Exelon Generation Company, LLC with the NRC Executive Director for Operations | Anticipated operational occurrence Enforcement Discretion Probabilistic Risk Assessment Significance Determination Process Open Phase Condition Risk-Informed Steering Committee Fuel cladding Generic Issues Program Backfit |
ML16076A254 | 15 March 2016 | Ltr. 03/15/16 Clinton Power Station, Unit 1 - Request for Information for an NRC Triennial Baseline Component Design Bases Inspection; Inspection Report 05000461/2016009 (Jen) | Stroke time Temporary Modification Time Critical Operator Action |
ML16076A246 | 15 March 2016 | Ltr. 03/15/16 Clinton Power Station - Notification of NRC Inspection and Request for Information (Vlm) | Nondestructive Examination Foreign Material Exclusion Dissimilar Metal Weld Scaffolding |
ML16071A206 | 15 March 2016 | RAI Regarding License Amendment Request to Revise the Reactor Steam Dome Pressure in Technical Specification 2.1.1, Reactor Core Sls(Cac Nos. MF6640 & MF6644) | |
ML16056A139 | 11 March 2016 | Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports | |
ML16012A344 | 10 March 2016 | Use of BWRVIP Guidelines in Lieu of Specific ASME Code Requirements | Incorporated by reference Aging Management |
ML16067A324 | 7 March 2016 | Public Outreach/Open House to Discuss NRC 2015 End-Of-Cycle Plant Performance Assessment of Clinton Power Station | |
ML16067A368 | 7 March 2016 | 2015 Clinton EOC Public Meeting Notice | Open House |
Press Release-16-011, NRC Issues Annual Assessments for Nation'S Nuclear Plants | 4 March 2016 | Press Release-16-011: NRC Issues Annual Assessments for Nation'S Nuclear Plants | |
IR 05000461/2016010 | 3 March 2016 | NRC Inspection Report 05000461/2016010 (Dnms); 07201046/2016001(DNMS), August 25, 2014, Through February 11, 2016, Clinton Power Station | Safe Shutdown Earthquake Operating Basis Earthquake Finite Element Analysis Significance Determination Process Control of Heavy Loads |
U-604269, Operational Safety Review Team (Osart) Follow Up Mission Report | 2 March 2016 | Operational Safety Review Team (Osart) Follow Up Mission Report | |
IR 05000461/2015006 | 2 March 2016 | Annual Assessment Letter for Clinton Power Station Unit 1 (Inspection Report 05000461/2015006) | Spent Fuel Pool Instrumentation |
ML16067A081 | 2 March 2016 | Operational Safety Review Team (Osart) Follow Up Mission Report | |
RS-16-008, Response to NRC Regulatory Issue Summary 2015-16, Revision 1, Planned Licensing Action Submittals for All Power Reactor Licensees. | 29 February 2016 | Response to NRC Regulatory Issue Summary 2015-16, Revision 1, Planned Licensing Action Submittals for All Power Reactor Licensees. | Water Inventory Control Cyber Security Surveillance Frequency Control Program TORMIS Exemption Request |
ML16057A793 | 26 February 2016 | Annual Fatigue Report Form for 2015 | |
RS-16-050, Submittal of Exelon Fitness for Duty Performance Data Reports-Annual 2015 | 26 February 2016 | Submittal of Exelon Fitness for Duty Performance Data Reports-Annual 2015 | Fitness for Duty |
CAC:MF7239 | 25 February 2016 | ||
ML16032A393 | 25 February 2016 | Use of Encryption Software for Electronic Transmission of Safeguards Information | |
ML16055A244 | 24 February 2016 | Annual Report Form for Drug and Alcohol Tests for 2015 | |
ML16053A509 | 22 February 2016 | NRR E-mail Capture - Exelon Fleet - Proposed Alternative to Use Code Case N-513-4 (CAC Nos. MF7301-MF7322) | |
ML16056A014 | 19 February 2016 | Marsh USA, Inc. - 2016 Nuclear Liability Certificates of Insurance | |
ML15364A544 | 18 February 2016 | Staff Review of High Frequency Confirmation Associated with Reevaluated Seismic Hazard Implementating Near-Term Task Force Recommendation 2.1 Seismic for Specific Licensees | Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |
RA-16-012, Request to Consolidate 10 CFR Part 71 Quality Assurance Program Approvals for Radioactive Material Packages at Exelon Generation Company, LLC Nuclear Power Plants | 17 February 2016 | Request to Consolidate 10 CFR Part 71 Quality Assurance Program Approvals for Radioactive Material Packages at Exelon Generation Company, LLC Nuclear Power Plants | |
U-604262, Third Ten-Year Interval Inservice Testing Program Plan, Revision 6 | 15 February 2016 | Third Ten-Year Interval Inservice Testing Program Plan, Revision 6 | Safe Shutdown Packing leak Ultimate heat sink Stroke time Squib Incorporated by reference Scram Discharge Volume Excess Flow Check Valve Cold shutdown justification Power-Operated Valves Power Operated Valves Scaffolding Grace period |
CAC:MF7162 | 11 February 2016 | ||
ML16035A176 | 11 February 2016 | Summary of January 7, 2016, Meeting with Exelon Generation Company, LLC on It'S Planned Fleet License Amendment Request to Revise the Minimum Staffing Requirements for Emergency Response (CAC Nos. MF7162 - MF7183) | |
ML16040A218 | 11 February 2016 | January 21, 2016, Summary of Meeting with Exelon Generation Company, LLC Licensing Managers | Probabilistic Risk Assessment |
ML16041A146 | 10 February 2016 | Annual Report Form for Drug and Alcohol Tests for 2015 | |
RA-16-007, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, Revision 88, 89 and 90 | 8 February 2016 | Summary of Changes to Quality Assurance Topical Report, NO-AA-10, Revision 88, 89 and 90 | Safe Shutdown Fitness for Duty Shutdown Margin Non-Destructive Examination Offsite Dose Calculation Manual Commercial Grade Dedication Safe Shutdown Earthquake Coatings Nondestructive Examination Temporary Modification Cyber Security Condition Adverse to Quality Aging Management Process Control Program Operability Determination License Renewal Maintenance Rule Program Fire Protection Program Power Uprate |
ML16032A411 | 4 February 2016 | Summary of December 9, 2015 Meeting with Exelon Generation Company, LLC to Discuss Proposed Submittal Related to Secondary Containment Airlock Extension | |
IR 05000461/2015004 | 4 February 2016 | NRC Integrated Inspection Report 05000461/2015004 | Offsite Dose Calculation Manual Temporary Modification Significance Determination Process Job Performance Measure Annual Radiological Environmental Operating Report Operability Determination Annual Radiological Effluent Release Report Fire Protection Program |
IR 05000461/2015501 | 3 February 2016 | Ltr. 02/03/16 Clinton Power Station, Unit 1 - NRC Emergency Preparedness Annual Inspection Report No. 05000461/2015501. (Gph) | |
ML18037A707 | 30 January 2016 | Submittal of Final After Action Report/Improvement Plan for the Clinton Power Station Radiological Emergency Preparedness Exercise Held on November 1, 2017 | |
CAC:MF8109 | 29 January 2016 | ||
RS-16-019, License Amendment Request to Incorporate Revised Alternative Source Term Dose Calculation | 29 January 2016 | License Amendment Request to Incorporate Revised Alternative Source Term Dose Calculation | Safe Shutdown Fuel cladding |
RS-16-041, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1. | 28 January 2016 | Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1. | Through-Wall Leak |
CAC:MF7301 | 28 January 2016 | ||
CAC:MF7290 | 25 January 2016 |