Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RS-16-075, Supplemental Information Regarding License Amendment Request to Revise Technical Specification Section 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test.31 March 2016Supplemental Information Regarding License Amendment Request to Revise Technical Specification Section 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test.Mission time
Internal Flooding
Probabilistic Risk Assessment
RS-16-058, Clinton, Unit 1 - Transmittal of Exelon Nuclear Radiological Emergency Plan Addendum Revision28 March 2016Clinton, Unit 1 - Transmittal of Exelon Nuclear Radiological Emergency Plan Addendum RevisionSpent Fuel Pool Instrumentation
RS-16-058, EP-AA-1003, Addendum 3, Revision 1, Emergency Action Levels for Clinton Station.28 March 2016EP-AA-1003, Addendum 3, Revision 1, Emergency Action Levels for Clinton Station.Safe Shutdown
High winds
Ultimate heat sink
Fire Barrier
Safe Shutdown Earthquake
Internal Flooding
Operating Basis Earthquake
Operator Manual Action
Nuclear Accident Reporting System
Earthquake
Fuel cladding
Pressure Boundary Leakage
Power change
ML16088A39628 March 2016Transmittal of Exelon Nuclear Radiological Emergency Plan Addendum RevisionSpent Fuel Pool Instrumentation
RS-16-055, Mitigating Strategies Flood Hazard Assessment (Msfha) Submittal24 March 2016Mitigating Strategies Flood Hazard Assessment (Msfha) SubmittalSafe Shutdown
FLEX
Fukushima Dai-Ichi
Press Release-III-16-003, NRC to Discuss Performance of Clinton Nuclear Power Station March 3023 March 2016Press Release-III-16-003: NRC to Discuss Performance of Clinton Nuclear Power Station March 30
TAC:MF737022 March 2016
ML16077A15622 March 2016Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards
IR 05000461/201600817 March 2016NRC Supplemental Inspection Report 05000461/2016008 January 25, 2016 February 4, 2016, and Assessment Follow-Up LetterCondition Adverse to Quality
Significance Determination Process
ML16076A12017 March 2016Supplemental Information Needed for Acceptance of Requested Licensing Action Concerning Extension of Leak Rate Testing (CAC No. MF7290)(RS-16-015)Probabilistic Risk Assessment
ML16076A17217 March 2016Acceptance Review Concerning Incorporation of Revised Alternative Source Term (CAC No. MF7336) (RS-16-019)
CAC:MF733617 March 2016
ML16075A32916 March 2016OEDO-16-00165 - Briefing Package for Drop-In Visit on March 23, 2016, by Senior Management of Exelon Generation Company, LLC with the NRC Executive Director for OperationsAnticipated operational occurrence
Enforcement Discretion
Probabilistic Risk Assessment
Significance Determination Process
Open Phase Condition
Risk-Informed Steering Committee
Fuel cladding
Generic Issues Program
Backfit
ML16076A25415 March 2016Ltr. 03/15/16 Clinton Power Station, Unit 1 - Request for Information for an NRC Triennial Baseline Component Design Bases Inspection; Inspection Report 05000461/2016009 (Jen)Stroke time
Temporary Modification
Time Critical Operator Action
ML16076A24615 March 2016Ltr. 03/15/16 Clinton Power Station - Notification of NRC Inspection and Request for Information (Vlm)Nondestructive Examination
Foreign Material Exclusion
Dissimilar Metal Weld
Scaffolding
ML16071A20615 March 2016RAI Regarding License Amendment Request to Revise the Reactor Steam Dome Pressure in Technical Specification 2.1.1, Reactor Core Sls(Cac Nos. MF6640 & MF6644)
ML16056A13911 March 2016Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports
ML16012A34410 March 2016Use of BWRVIP Guidelines in Lieu of Specific ASME Code RequirementsIncorporated by reference
Aging Management
ML16067A3247 March 2016Public Outreach/Open House to Discuss NRC 2015 End-Of-Cycle Plant Performance Assessment of Clinton Power Station
ML16067A3687 March 20162015 Clinton EOC Public Meeting NoticeOpen House
Press Release-16-011, NRC Issues Annual Assessments for Nation'S Nuclear Plants4 March 2016Press Release-16-011: NRC Issues Annual Assessments for Nation'S Nuclear Plants
IR 05000461/20160103 March 2016NRC Inspection Report 05000461/2016010 (Dnms); 07201046/2016001(DNMS), August 25, 2014, Through February 11, 2016, Clinton Power StationSafe Shutdown Earthquake
Operating Basis Earthquake
Finite Element Analysis
Significance Determination Process
Control of Heavy Loads
U-604269, Operational Safety Review Team (Osart) Follow Up Mission Report2 March 2016Operational Safety Review Team (Osart) Follow Up Mission Report
IR 05000461/20150062 March 2016Annual Assessment Letter for Clinton Power Station Unit 1 (Inspection Report 05000461/2015006)Spent Fuel Pool Instrumentation
ML16067A0812 March 2016Operational Safety Review Team (Osart) Follow Up Mission Report
RS-16-008, Response to NRC Regulatory Issue Summary 2015-16, Revision 1, Planned Licensing Action Submittals for All Power Reactor Licensees.29 February 2016Response to NRC Regulatory Issue Summary 2015-16, Revision 1, Planned Licensing Action Submittals for All Power Reactor Licensees.Water Inventory Control
Cyber Security
Surveillance Frequency Control Program
TORMIS
Exemption Request
ML16057A79326 February 2016Annual Fatigue Report Form for 2015
RS-16-050, Submittal of Exelon Fitness for Duty Performance Data Reports-Annual 201526 February 2016Submittal of Exelon Fitness for Duty Performance Data Reports-Annual 2015Fitness for Duty
CAC:MF723925 February 2016
ML16032A39325 February 2016Use of Encryption Software for Electronic Transmission of Safeguards Information
ML16055A24424 February 2016Annual Report Form for Drug and Alcohol Tests for 2015
ML16053A50922 February 2016NRR E-mail Capture - Exelon Fleet - Proposed Alternative to Use Code Case N-513-4 (CAC Nos. MF7301-MF7322)
ML16056A01419 February 2016Marsh USA, Inc. - 2016 Nuclear Liability Certificates of Insurance
ML15364A54418 February 2016Staff Review of High Frequency Confirmation Associated with Reevaluated Seismic Hazard Implementating Near-Term Task Force Recommendation 2.1 Seismic for Specific LicenseesSafe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
RA-16-012, Request to Consolidate 10 CFR Part 71 Quality Assurance Program Approvals for Radioactive Material Packages at Exelon Generation Company, LLC Nuclear Power Plants17 February 2016Request to Consolidate 10 CFR Part 71 Quality Assurance Program Approvals for Radioactive Material Packages at Exelon Generation Company, LLC Nuclear Power Plants
U-604262, Third Ten-Year Interval Inservice Testing Program Plan, Revision 615 February 2016Third Ten-Year Interval Inservice Testing Program Plan, Revision 6Safe Shutdown
Packing leak
Ultimate heat sink
Stroke time
Squib
Incorporated by reference
Scram Discharge Volume
Excess Flow Check Valve
Cold shutdown justification
Power-Operated Valves
Power Operated Valves
Scaffolding
Grace period
CAC:MF716211 February 2016
ML16035A17611 February 2016Summary of January 7, 2016, Meeting with Exelon Generation Company, LLC on It'S Planned Fleet License Amendment Request to Revise the Minimum Staffing Requirements for Emergency Response (CAC Nos. MF7162 - MF7183)
ML16040A21811 February 2016January 21, 2016, Summary of Meeting with Exelon Generation Company, LLC Licensing ManagersProbabilistic Risk Assessment
ML16041A14610 February 2016Annual Report Form for Drug and Alcohol Tests for 2015
RA-16-007, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, Revision 88, 89 and 908 February 2016Summary of Changes to Quality Assurance Topical Report, NO-AA-10, Revision 88, 89 and 90Safe Shutdown
Fitness for Duty
Shutdown Margin
Non-Destructive Examination
Offsite Dose Calculation Manual
Commercial Grade Dedication
Safe Shutdown Earthquake
Coatings
Nondestructive Examination
Temporary Modification
Cyber Security
Condition Adverse to Quality
Aging Management
Process Control Program
Operability Determination
License Renewal
Maintenance Rule Program
Fire Protection Program
Power Uprate
ML16032A4114 February 2016Summary of December 9, 2015 Meeting with Exelon Generation Company, LLC to Discuss Proposed Submittal Related to Secondary Containment Airlock Extension
IR 05000461/20150044 February 2016NRC Integrated Inspection Report 05000461/2015004Offsite Dose Calculation Manual
Temporary Modification
Significance Determination Process
Job Performance Measure
Annual Radiological Environmental Operating Report
Operability Determination
Annual Radiological Effluent Release Report
Fire Protection Program
IR 05000461/20155013 February 2016Ltr. 02/03/16 Clinton Power Station, Unit 1 - NRC Emergency Preparedness Annual Inspection Report No. 05000461/2015501. (Gph)
ML18037A70730 January 2016Submittal of Final After Action Report/Improvement Plan for the Clinton Power Station Radiological Emergency Preparedness Exercise Held on November 1, 2017
CAC:MF810929 January 2016
RS-16-019, License Amendment Request to Incorporate Revised Alternative Source Term Dose Calculation29 January 2016License Amendment Request to Incorporate Revised Alternative Source Term Dose CalculationSafe Shutdown
Fuel cladding
RS-16-041, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1.28 January 2016Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1.Through-Wall Leak
CAC:MF730128 January 2016
CAC:MF729025 January 2016