Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
RA-14-104, Submittal of Preliminary Decommissioning Cost Estimate and Spent Fuel Management Plan | 30 December 2014 | Submittal of Preliminary Decommissioning Cost Estimate and Spent Fuel Management Plan | Scram Discharge Volume Fuel cladding Fire Watch Scaffolding |
ML14226A940 | 24 December 2014 | Issuance of Amendments Regarding the Emergency Plan Definition of Annual Training (TAC Nos. MF3003, MF3004, MF3005, MF3006, MF3007, MF3008.. | Grace period |
RA-14-106, 1R25 Refueling Outage Inservice Inspection Owner'S Activity Report and Attachments | 22 December 2014 | 1R25 Refueling Outage Inservice Inspection Owner'S Activity Report and Attachments | |
RA-14-101, Annual Report of Sea Turtle Incidental Takes - 2014 | 19 December 2014 | Annual Report of Sea Turtle Incidental Takes - 2014 | |
RA-14-107, Commitment Change Summary Report - 2013 | 19 December 2014 | Commitment Change Summary Report - 2013 | |
TAC:MF6056 | 19 December 2014 | ||
NEI 99-04, Oyster Creek, Commitment Change Summary Report - 2013 | 19 December 2014 | Oyster Creek, Commitment Change Summary Report - 2013 | |
RA-14-083, Expedited Seismic Evaluation Process Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights From... | 19 December 2014 | Expedited Seismic Evaluation Process Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights From... | Ultimate heat sink Safe Shutdown Earthquake Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Spent Fuel Pool Instrumentation Earthquake Power-Operated Valves Power Operated Valves Hardened vent Unidentified leakage |
IR 05000219/2014008 | 18 December 2014 | Nuclear Regulatory Commission Problem Identification and Resolution Inspection Report 05000219/2014008 | Operability Determination Maintenance Rule Program |
RS-14-350, Submission of Standard Practice Procedures Plans | 16 December 2014 | Submission of Standard Practice Procedures Plans | |
RA-14-105, Submittal of Fifth Ten-Year Interval Lnservice Inspection Program Plan | 11 December 2014 | Submittal of Fifth Ten-Year Interval Lnservice Inspection Program Plan | Weld Overlay Coatings Nondestructive Examination VT-2 Incorporated by reference Aging Management Scram Discharge Volume Moisture barrier Dissimilar Metal Weld |
ML14227A347 | 11 December 2014 | Request for Permission to Use Copyrighted Graphics and Material | |
ML14307B707 | 10 December 2014 | Supplemental Information Related to Development of Seismic Risk Evaluations for Information Request Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-T | Probabilistic Risk Assessment Fukushima Dai-Ichi |
RS-14-340, Advisement of Leadership Changes for Exelon Generation Company, LLC | 2 December 2014 | Advisement of Leadership Changes for Exelon Generation Company, LLC | |
ML14307A638 | 28 November 2014 | Screening and Prioritization Results of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations for Recommendation 2.1 | Safe Shutdown Earthquake Fukushima Dai-Ichi |
RA-14-092, Supplemental Response to RAI Re Request for Extension to Comply with NRC Order EA-13-109: Order Modifying License with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions | 25 November 2014 | Supplemental Response to RAI Re Request for Extension to Comply with NRC Order EA-13-109: Order Modifying License with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions | High winds Tornado Missile FLEX Tornado-Generated Missile Tornado Generated Missile B.5.b Mitigating Strategies Earthquake Hardened vent Scaffolding |
ML14303A465 | 21 November 2014 | Response Requirements for Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Flooding Hazard Integrated Assessments for Recommendation 2.1 of the Near-Term Task Force Review of Insights from t | Fukushima Dai-Ichi |
ML14309A684 | 18 November 2014 | Request for Withholding Information from Public Disclosure Regarding Revision of the Core Operating Limits Report for Cycle 25, Revision 10 | |
ML14321A705 | 14 November 2014 | 2014 Annual Report - Guarantees of Payment of Deferred Premiums | |
ML14304A785 | 14 November 2014 | Closed Meeting with the Nuclear Regulatory Commission and Exelon Generation Company, LLC Regarding the Physical Security License Amendment Request for Oyster Creek Nuclear Generating Station | |
RA-14-098, Response to Request for Additional Information - End of Interval Relief Requests Associated with the Fourth 10-Year Lnservice Inspection (Isi)Interval | 14 November 2014 | Response to Request for Additional Information - End of Interval Relief Requests Associated with the Fourth 10-Year Lnservice Inspection (Isi)Interval | Nondestructive Examination Liquid penetrant Dissimilar Metal Weld |
IR 05000219/2014004 | 13 November 2014 | NRC Integrated Inspection Report 05000219-14-004 (July 1, 2014 - September 30, 2014) | High Radiation Area Fire Barrier Water Inventory Control Functionality Assessment Locked High Radiation Area Aging Management Significance Determination Process Operability Determination Scaffolding Power change Downpower Operability Assessment |
ML22306A184 | 7 November 2014 | Finalized Caoa | |
ML14311A662 | 3 November 2014 | September 10, 2014, NRC Generic Fundamentals Examination Results - Oyster Creek Nuclear Generating Station Cover Letter | Generic Fundamentals Examination |
RA-14-091, Response to Request for Additional Information License Amendment Request Related to Reactor Building Vital Area Access Control | 3 November 2014 | Response to Request for Additional Information License Amendment Request Related to Reactor Building Vital Area Access Control | |
RS-14-315, Dissolution of Exelon Ventures Company, LLC | 27 October 2014 | Dissolution of Exelon Ventures Company, LLC | |
ML14198A141 | 27 October 2014 | G20110262/EDATS: OEDO-2011-0269 - Response LTR to Paul Gunter & Kevin Kamps Ltr. Re 2.206 - Immediately Suspend the Operating License of General Electric Boiling Water Reactors Mark I Units | Ultimate heat sink Fukushima Dai-Ichi Spent Fuel Pool Instrumentation Earthquake Hardened vent |
RA-14-078, Secondary Containment Capability Test | 24 October 2014 | Secondary Containment Capability Test | |
ML14275A162 | 25 September 2014 | Notification of Potential Part 21 Report - Electromatic Relief Valve Excessive Wear | Unanalyzed Condition Fitness for Duty |
RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 | 24 September 2014 | Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 | Through-Wall Leak |
ML14246A518 | 17 September 2014 | Request for Additional Information Regarding the Fourth 10-Year Interval Inservice Inspection Program Plan Requests for Relief | Nondestructive Examination Liquid penetrant Dissimilar Metal Weld |
ML14252A703 | 17 September 2014 | Request for Additional Information Regarding Preliminary Decommissioning Cost Estimate and Annual Decommissioning Funding Status Reports | |
ML14247A586 | 16 September 2014 | Request for Additional Information Regarding License Amendment Request to Revise Snubber Surveillance Requirements (Tac No. MF4124) | |
ML14255A041 | 11 September 2014 | NRR E-mail Capture - Acceptance Review for License Amendment Regarding the Cyber Security Plan Implementation Schedule for Milestone 8 | Cyber Security |
ML14255A157 | 11 September 2014 | Update to Correspondence Addressees and Service Lists | |
ML14114A563 | 10 September 2014 | Request for Additional Information Regarding License Amendment Request Related to Reactor Building Vital Area Access Control | |
IR 05000219/2014405 | 9 September 2014 | IR 05000219/2014405; 08/11/2014 to 08/15/2014; Exelon Generation Company, LLC (Exelon); Oyster Creek Nuclear Generating Station (Ocngs); Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestones 1 to | Cyber Security Affidavit |
ML14255A042 | 9 September 2014 | NRR E-mail Capture - Logbook Entry: 09/09/2014 | |
NRC-2014-0917, Biweekly Sholly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 16, 2014 | 5 September 2014 | Biweekly Sholly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 16, 2014 | Safe Shutdown Surveillance Frequency Control Program Exemption Request Fuel cladding |
RA-14-073, Sea Turtle Incidental Take Reports 2014-5, 2014-6 | 5 September 2014 | Sea Turtle Incidental Take Reports 2014-5, 2014-6 | |
ML14247A154 | 5 September 2014 | Biweekly Sholly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 16, 2014 | Safe Shutdown Surveillance Frequency Control Program Exemption Request Fuel cladding |
ML14220A512 | 3 September 2014 | Summary - Site Visit Regarding Physical Security License Amendment Request for Oyster Creek Nuclear Generating Station | |
IR 05000219/2014403 | 3 September 2014 | NRC Security Inspection Report 05000219/2014403 Letter Only | Affidavit |
ML14247A169 | 2 September 2014 | NRR E-mail Capture - Logbook Entry: 09/02/2014 | |
IR 05000219/2014006 | 2 September 2014 | ROP-15 Mid-Cycle Performance Review and Inspection Plan Report 05000219-14-006 | Spent Fuel Pool Instrumentation |
RA-14-057, License Amendment Request Regarding the Cyber Security Plan Implementation Schedule for Milestone 8 | 29 August 2014 | License Amendment Request Regarding the Cyber Security Plan Implementation Schedule for Milestone 8 | Safe Shutdown Cyber Security Safeguards Contingency Plan Fire Protection Program |
RA-14-052, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | 28 August 2014 | Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | Spent Fuel Pool Instrumentation |
RA-14-053, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | 28 August 2014 | Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | FLEX B.5.b Mitigating Strategies Hardened vent |
RA-14-072, Submittal of a 30-Day 10 CFR 50.46 Report | 27 August 2014 | Submittal of a 30-Day 10 CFR 50.46 Report | |
ML14220A027 | 27 August 2014 | Request for Additional Information Regarding Request for Extension to Comply with NRC Order EA-13-109: Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions | FLEX B.5.b Mitigating Strategies Hardened vent Scaffolding |