Issue date | Title | Topic | |
---|---|---|---|
ML14001A021 | 20 December 2013 | Comment (00751) of Christopher Calnan on PR-51, Waste Confidence - Continued Storage of Spent Nuclear Fuel | Chernobyl |
ML13352A109 | 18 December 2013 | P. Sena Ltr Change in U.S. Nuclear Regulatory Commission Staff Project Management for Three Mile Island Nuclear Station, Unit 2 | |
ML13225A552 | 17 December 2013 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) | Safe Shutdown Boric Acid High winds Shutdown Margin Ultimate heat sink Tornado Missile Time to boil Safe Shutdown Earthquake Internal Flooding Emergency Lighting FLEX Fukushima Dai-Ichi Seismically rugged Frazil ice Battery sizing Earthquake |
ML13324A086 | 13 December 2013 | Exemption from Certain Requirements of 10 CFR Part 50, Appendix G and 10 CFR 50.61, for Initial RTNDT Values for Linde 80 Welds | Anticipated operational occurrence Hydrostatic |
NRC-2013-0274, Exelon Generation Company LLC; Three Mile Nuclear Station, Unit 1 Regarding Exemption from Portions of 10 CFR Part 50, Appendix G | 13 December 2013 | Exelon Generation Company LLC; Three Mile Nuclear Station, Unit 1 Regarding Exemption from Portions of 10 CFR Part 50, Appendix G | Anticipated operational occurrence Hydrostatic |
ML13325A023 | 13 December 2013 | Issuance of Amendment Revision to the Pressure and Temperature Limit Curves and the Low Temperature Overpressure Protection Limits | Safe Shutdown Hydrostatic Cyber Security Surveillance Frequency Control Program Exemption Request Fire Protection Program |
ML13324A089 | 13 December 2013 | Company LLC; Three Mile Nuclear Station, Unit 1 Regarding Exemption from Portions of 10 CFR Part 50, Appendix G | Anticipated operational occurrence Hydrostatic |
RA-13-119, Response to RAI - Proposed Alternative to Utilize Code Case N-786, Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping Section XI, Division 1. | 12 December 2013 | Response to RAI - Proposed Alternative to Utilize Code Case N-786, Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping Section XI, Division 1. | |
ML13338A671 | 9 December 2013 | Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Three Mile Island, Unit 1, TAC MF0803 | Safe Shutdown Boric Acid High winds Shutdown Margin Ultimate heat sink Time to boil Safe Shutdown Earthquake Internal Flooding Emergency Lighting FLEX Tornado Generated Missile Fukushima Dai-Ichi Seismically rugged Frazil ice Battery sizing Earthquake |
TMI-13-168, Closeout of Commitments Associated with Relief Request RR-12-02 Concerning the Installation of a Full Structural Weld Overlay on the Lower Cold Leg Letdown Nozzle Dissimilar Metal Welds and Alloy 600 Safe-End | 3 December 2013 | Closeout of Commitments Associated with Relief Request RR-12-02 Concerning the Installation of a Full Structural Weld Overlay on the Lower Cold Leg Letdown Nozzle Dissimilar Metal Welds and Alloy 600 Safe-End | Weld Overlay Dissimilar Metal Weld |
RA-13-109, Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns | 27 November 2013 | Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns | Fukushima Dai-Ichi Design basis earthquake |
ML13333A156 | 26 November 2013 | Senior Reactor and Reactor Operator Initial License Exam-TMI/1 120 Day Exam Ltr | |
TMI-13-156, Response to Request for Additional Information on Post-Shutdown Decommissioning Activities Report | 18 November 2013 | Response to Request for Additional Information on Post-Shutdown Decommissioning Activities Report | |
ML13309B072 | 15 November 2013 | Reassignment of U.S. Nuclear Regulatory Commission Branch Chief for Three Mile Island Nuclear Station, Unit 1, Peach Bottom Atomic Power Station, Units 2 and 3, Oyster Creek Nuclear Generating Station, and Limerick Generating Station, Units | |
ML13308C188 | 13 November 2013 | Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation | High Radiation Area Spent Fuel Pool Instrumentation Fire Protection Program |
ML14189A287 | 12 November 2013 | TMI 40TH Year Tendon Surveillance, Tendon No. 1-146-34, Tendon End Buddress 4 | Safe Shutdown Time of Discovery Commercial Grade Dedication Coatings Nondestructive Examination Aging Management Foreign Material Exclusion Moisture barrier Scaffolding |
TMI-13-155, Cycle 20 Core Operating Limits Report, COLR TMI 1, Revision 9 | 8 November 2013 | Cycle 20 Core Operating Limits Report, COLR TMI 1, Revision 9 | Boric Acid Shutdown Margin |
TAC:MF3332 | 8 November 2013 | ||
ML13294A039 | 7 November 2013 | Notice of Consideration of Approval of Transfer of Renewed Facility Operating Licenses and Conforming Amendments,.. | Exemption Request |
ML13310B685 | 6 November 2013 | NRR E-mail Capture - Preliminary Additional RAI Questions Regarding Use of Code Case N-786 | |
TMI-13-161, Submittal of Inspection Plan for Reactor Internals. Areva Report ANP-2952Q1NP Enclosed | 6 November 2013 | Submittal of Inspection Plan for Reactor Internals. Areva Report ANP-2952Q1NP Enclosed | Aging Management Flow Induced Vibration |
ML13311A313 | 6 November 2013 | 2013 Annual Report - Guarantees of Payment of Deferred Premiums | |
TAC:MF3003 | 30 October 2013 | ||
RA-13-077, Company License Amendment Request to Revise the Emergency Plan Requalification Training Frequency for Emergency Response Organization Personnel | 30 October 2013 | Company License Amendment Request to Revise the Emergency Plan Requalification Training Frequency for Emergency Response Organization Personnel | Grace period |
RS-13-264, Company, Executed Trust Fund Agreement Amendments and Subordinate Trust Agreement | 29 October 2013 | Company, Executed Trust Fund Agreement Amendments and Subordinate Trust Agreement | Incorporated by reference |
IR 05000289/2013004 | 28 October 2013 | IR 05000289-13-004, 07/01/2013 - 09/30/2013; Three Mile Island, Unit 1, Integrated Inspection Report | Offsite Dose Calculation Manual |
IR 05000289/2013010 | 22 October 2013 | NRC Supplemental Inspection Report 05000289-13-010 and Assessment Follow-up Letter | Safe Shutdown Fire Barrier Functionality Assessment Fire Protection Program |
TAC:MF2799 | 21 October 2013 | ||
ML13266A285 | 21 October 2013 | Request for Additional Information on Three Mile Island Nuclear Station Unit 2 - post-shutdown Decommissioning Activities Report | |
ML13269A389 | 21 October 2013 | Upcoming Steam Generator Tube Inspection | |
TMI-13-150, Response to Request for Additional Information - 10 CFR 50.46 30-Day Report | 10 October 2013 | Response to Request for Additional Information - 10 CFR 50.46 30-Day Report | |
ML13290A561 | 9 October 2013 | NRR E-mail Capture - Acceptance Review for Request to Use a Provision of a Later Addenda of the ASME Boiler and Pressure Vessel Code, Section XI | |
IR 05000289/2013403 | 8 October 2013 | IR 05000289-13-403; 9/9/2013 to 9/13/2013; Three Mile Island Station, Unit 1; Baseline Security Inspection - Letter Only | Affidavit |
ML13276A649 | 3 October 2013 | Notification of Conduct of a Triennial Fire Protection Baseline Inspection | Safe Shutdown Probabilistic Risk Assessment Operator Manual Action Multiple Spurious Operation Emergency Lighting Job Performance Measure Thermoset Severe Accident Management Guideline B.5.b Mitigating Strategies Exemption Request Fire Protection Program |
ML13268A509 | 25 September 2013 | NRR E-mail Capture - Seismic Walkdown Delayed Items | |
ML13269A179 | 25 September 2013 | Draft Request for Additional Information | Aging Management |
RS-13-237, Request to Use a Provision of a Later Addenda of the ASME Boiler and Pressure Vessel Code, Section XI | 25 September 2013 | Request to Use a Provision of a Later Addenda of the ASME Boiler and Pressure Vessel Code, Section XI | Incorporated by reference |
ML13262A163 | 23 September 2013 | Meeting Report - Three Mile Island, Unit 2, Post-Shutdown Decommissioning Activities Report Public Meeting | |
ML13262A149 | 19 September 2013 | Enclosure 3- NRC Presentation Handout | |
RA-13-081, Proposed Resolution for Completion of the Seismic Walkdowns Associated with NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term. | 16 September 2013 | Proposed Resolution for Completion of the Seismic Walkdowns Associated with NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term. | Fukushima Dai-Ichi Foreign Material Exclusion |
RA-13-075, Response to NRC Request for Information Per 10 CFR 50.54(f) Re the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident- 1.5 Year Response for CEUS Sites | 12 September 2013 | Response to NRC Request for Information Per 10 CFR 50.54(f) Re the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident- 1.5 Year Response for CEUS Sites | Fukushima Dai-Ichi Earthquake |
ML13256A298 | 12 September 2013 | 09/25/2013 Notice of Meeting with the U.S. Department of Energy to Discuss the Three Mile Island Unit 2 License Renewal | |
ML13253A225 | 10 September 2013 | Draft Request for Additional Information | Fuel cladding |
Press Release-13-073, NRC Issues Mid-Cycle Assessments for Nation'S Nuclear Plants | 6 September 2013 | Press Release-13-073: NRC Issues Mid-Cycle Assessments for Nation'S Nuclear Plants | |
ML13254A114 | 5 September 2013 | Attachment 10 - Updated Evacuation Time Estimates for Three Mile Island Nuclear Station Plume Exposure Pathway and ETE Review Criteria Checklist | |
ML13249A207 | 5 September 2013 | Draft Request for Additional Information | Aging Management |
ML13248A341 | 5 September 2013 | Project Manager Reassignment | |
RA-13-085, 10 CFR 50, Appendix E, Evacuation Time Estimate Analysis Supplemental Response for Braidwood, Byron, Clinton, Dresden, LaSalle, Limerick, Oyster Creek, Peach Bottom, Quad Cities and Three Mile Island | 5 September 2013 | 10 CFR 50, Appendix E, Evacuation Time Estimate Analysis Supplemental Response for Braidwood, Byron, Clinton, Dresden, LaSalle, Limerick, Oyster Creek, Peach Bottom, Quad Cities and Three Mile Island | |
IR 05000289/2013006 | 3 September 2013 | Mid-Cycle Performance Review and Inspection Plan Report 05000289-13-006 | License Renewal |
NRC-2013-0183, Comment (1) of Susan Garelik on Three Mile Island, Unit 2; Post-Shutdown Decommissioning Activities Report | 3 September 2013 | Comment (1) of Susan Garelik on Three Mile Island, Unit 2; Post-Shutdown Decommissioning Activities Report |