Issue date | Title | Topic | |
---|---|---|---|
ML110900485 | 31 March 2011 | Lr - Dseis Distribution List | |
SBK-L-11059, Response to Request for Information Regarding Approval of Cyber Security Plan | 31 March 2011 | Response to Request for Information Regarding Approval of Cyber Security Plan | Safe Shutdown Cyber Security Fuel cladding Fire Protection Program |
ML110700018 | 30 March 2011 | Request for Additional Information Related to the Review of the Seabrook Station License Renewal Application | Safe Shutdown Aging Management Fire Protection Program Flow Induced Vibration |
ML110890825 | 30 March 2011 | Letter to ASLB from Counsel for NextEra Energy, Providing Comments on Board'S Draft Scheduling Order | |
ML110750197 | 30 March 2011 | 2011 Summary of Public Teleconference with NextEra to Discuss Erosion Testing to Be Performed in Support of Debris Interceptor Analysis | |
ML110880663 | 29 March 2011 | Notification of Conduct of a Triennial Fire Protection Baseline Inspection | Safe Shutdown Fitness for Duty Fire Barrier Emergency Lighting Severe Accident Management Guideline B.5.b Mitigating Strategies Fire Protection Program |
ML110880508 | 29 March 2011 | E-mail, Miller to Kilby, Draft RAI for Seabrook H* LAR | |
ML110970260 | 28 March 2011 | Nwt 817, Chemistry Control in the Seabrook Thermal Barrier Loop, Final | Boric Acid |
ML110820526 | 23 March 2011 | Board Order (Granting Massachusetts Interested State Status) | |
L-2011-058, Duane Arnold and Point Beach, Units 1 & 2 - Status Reports Decommissioning Funding Status Report for the Listed Units | 23 March 2011 | Duane Arnold and Point Beach, Units 1 & 2 - Status Reports Decommissioning Funding Status Report for the Listed Units | Decommissioning Funding Plan |
ML110820249 | 23 March 2011 | Lr - Draft Phone Call Summary | |
ML110820647 | 23 March 2011 | Board Order (Circulating Draft Initial Scheduling Order) | |
ML110820699 | 22 March 2011 | 3/22/11 Revised Pre-application Meeting Slides Regarding NFPA 805 License Amendment Request | Internal Flooding Multiple Spurious Operation |
ML110800677 | 21 March 2011 | Lr - Draft Phone Call Summary | |
ML110280424 | 21 March 2011 | Audit Report Regarding the Seabrook Station License Renewal Application | Boric Acid Fire Barrier Weld Overlay Coatings Nondestructive Examination VT-2 Aging Management Operability Determination Moisture barrier License Renewal Maintenance Rule Program Biofouling Through Wall Leak DM weld Unidentified leakage Power Uprate Stretch Power Uprate |
L-2011-094, Comment (11) of Larry Nicholson, on Behalf of NextEra Energy, on Draft Regulatory Issue Summary, Adequacy of Station Electric Distribution System Voltages. | 18 March 2011 | Comment (11) of Larry Nicholson, on Behalf of NextEra Energy, on Draft Regulatory Issue Summary, Adequacy of Station Electric Distribution System Voltages. | Safe Shutdown |
L-2011-094, Comment (7) of Larry Nicholson, on Behalf of Nextera Energy, on Draft Regulatory Issue Summary, Adequacy of Station Electric Distribution System Voltages. | 18 March 2011 | Comment (7) of Larry Nicholson, on Behalf of Nextera Energy, on Draft Regulatory Issue Summary, Adequacy of Station Electric Distribution System Voltages. | Safe Shutdown Anticipated operational occurrence |
ML110800536 | 18 March 2011 | Comment (7) of Larry Nicholson, on Behalf of Nextera Energy, on Draft Regulatory Issue Summary, Adequacy of Station Electric Distribution System Voltages. | Safe Shutdown Anticipated operational occurrence |
ML110760689 | 17 March 2011 | Notice of Withdrawal of Antonio Fernandez on Behalf of NextEra Energy Seabrook, LLC | |
ML110760394 | 17 March 2011 | Lr - Phone Call on 3/21 Seabrook LRA Environmental Review | |
ML110350630 | 17 March 2011 | Letter Request for Additional Information Related to the Review of the Seabrook Station License Renewal Application | Coatings Through-Wall Leakage |
SBK-L-11044, Response to Request for Additional Information Regarding License Renewal Environmental Report | 16 March 2011 | Response to Request for Additional Information Regarding License Renewal Environmental Report | |
ML110750191 | 16 March 2011 | Letter to ASLB from Counsel for NRC Staff Providing Responses to Issues 3 - 5 in Board'S February 24, 2011 Order | |
ML11307A135 | 15 March 2011 | Lr - FW: Seabrook Glass Folder | |
ML11307A134 | 15 March 2011 | Lr - FW: Corrosion Resistant Materials Handbook - Google Books | |
ML11307A136 | 15 March 2011 | Lr - FW: Follow-up RAI for Seabrook 4.7.11 | |
ML110740661 | 15 March 2011 | Notice of Appearance of David R. Lewis on Behalf of NextEra Energy Seabrook, LLC | |
L-2011-096, Nuclear Property Insurance - 10 CFR 50.54(w)(3) | 14 March 2011 | Nuclear Property Insurance - 10 CFR 50.54(w)(3) | |
ML110770445 | 14 March 2011 | Transcript of Pre-Hearing Telephone Conference Held on March 14, 2011, Pages 175-227 | |
ML11307A133 | 11 March 2011 | Lr - FW: Draft Structural AMP Follow-up RAIs - Seabrook 2-24-11.doc | Coatings Through-Wall Leak |
TAC:ME5715 | 10 March 2011 | ||
ML110480846 | 10 March 2011 | Upcoming Steam Generator Tube Inservice Inspection | |
ML11307A132 | 10 March 2011 | Lr - Chlorination Draft RAI for Seabrook | Aging Management |
ML110700001 | 10 March 2011 | Friends of the Coast and New England Coalition Answer and Opposition to Nextera Energy Seabrook, Llc'S Notice of Appeal of LBP-11-02 | Aging Management |
ML110680534 | 9 March 2011 | Commonwealth of Massachusetts' Request to Participate as an Interested State | |
ML11307A130 | 9 March 2011 | Lr - FW: Seabrook Follow Up RAI for Metal Fatigue and TLAA | |
ML110680536 | 9 March 2011 | Notice of Appearance of Matthew Brock on Behalf of the Commonwealth of Massachusetts in the Matter of Seabrook Station Operating License Renewal | |
ML110680637 | 9 March 2011 | Order of the Secretary (Granting Friends of the Coast & New England Coalition, Inc Request for Three-Day Extension of Time to File Joint Opposition to Nextera'S Appeal to Commission of LBP-11-02 Through March 10, 2011) | |
ML110680108 | 9 March 2011 | Board Order (Denying Extension Request and Denying Motion for Leave to File for Reconsideration) | |
ML110680535 | 9 March 2011 | Certificate of Service for Commonwealth of Massachusetts' Request to Participate as an Interested State, and Notice of Appearance of Matthew Brock on Behalf of the Commonwealth of Massachusetts | |
ML110680133 | 8 March 2011 | Friends of the Coast and New England Coalition, Inc. Request for Extension of Time | |
ML110670017 | 8 March 2011 | E-mail, Miller to O'Keefe, Seabrook LAR 10-06 Acceptance Review | |
ML12174A034 | 8 March 2011 | E-mail from Bill Raymond, Region I to Art Burritt, Region I, Seabrook Proposed Presentation for MR Violation | Hydrostatic Condition Adverse to Quality |
ML12088A212 | 8 March 2011 | E-mail from Bill Raymond, Region I to Mike Modes, Region I; Subject: Management Briefing Status Seabrook | |
ML110660432 | 7 March 2011 | Letter from Counsel for NRC Staff to ASLB Providing Projected Schedule for Completion of the Safety and Environmental Evaluations in the Matter of Nextera Energy Seabrook, LLC, Seabrook Station, Unit 1 | |
ML110660679 | 7 March 2011 | Petitioners' Beyond Nuclear, Seacoast Anti-Pollution League and New Hampshire Sierra Club Reply in Opposition to Nextera Seabrook, Llc'S Appeal of LBP-11-02 | |
ML110660473 | 7 March 2011 | NRC Staff'S Response to Friends of the Coast and New England Coalition, Inc.'S Motion for Reconsideration of LBP-11-02 | Aging Management |
ML110660635 | 7 March 2011 | NextEra Energy Seabrook, Llc'S Answers to Friends of the Coast and New England Coalition Motion for Leave to File for Reconsideration of Memorandum and Order LBP-11-02 | Aging Management |
ML110660113 | 7 March 2011 | Lr - Request for Information Seabrook LRA SAMA Review | |
ML110550920 | 7 March 2011 | Request for Additional Information Related to the Review of the Seabrook Station License Renewal Application | Aging Management |