E-mail, Miller to Kilby, Draft RAI for Seabrook H* LAR
ML110880508
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 03/29/2011
From: Geoffrey Miller
Plant Licensing Branch 1
To: Kilby G
Nextera Energy
Miller G, NRR/DORL/LPL1-2, 415-2481
References
Download: ML110880508 (1)


Text

From:

Miller, Ed Sent:

Tuesday, March 29, 2011 2:04 PM To:

'Kilby, Gary'

Subject:

Draft RAI for Seabrook H* LAR

Gary, Emmett provided me with the following draft RAI. I am providing it to you in draft form to ensure that the question is clear. Please let me know if you have any questions. Thanks.

Ed Miller 415-2481 Draft RAI #1:

The proposed exclusion criteria for paragraph d. of TS 6.7.6.k is not consistent with the planned inspection scope (described in Section 3.2 of the technical evaluation supporting the proposed LAR) in the event that PWSCC is found at the TTS during the upcoming inspection.

The planned inspection scope is a key element supporting the proposed amendment for an interim H*. Please resolve the discrepancy or provide a revised proposal for paragraph d. which resolves the above inconsistency.