Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML11090068531 March 2011Notification of Joseph M. Farley Nuclear Plant - Component Design Bases Inspection - NRC Inspection Report 05000348, 364/2011010Probabilistic Risk Assessment
Time Critical Operator Action
NL-11-0450, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors (10 CFR 50.75(f)(1)29 March 2011Financial Assurance Requirements for Decommissioning Nuclear Power Reactors (10 CFR 50.75(f)(1)
NL-11-0481, Response to Requests for Additional Information28 March 2011Response to Requests for Additional InformationSafe Shutdown
Cyber Security
Fire Protection Program
ML11087184928 March 2011Summary of Public Meeting with Southern Nuclear Operating Co. to to Discuss Fleet Improvement Initiatives for the Southern Nuclear Plants
NL-11-0463, Proposed Relief Request for the Fourth ISI Interval (FNP-ISI-RR-01)28 March 2011Proposed Relief Request for the Fourth ISI Interval (FNP-ISI-RR-01)Dissimilar Metal Weld
Press Release-II-11-010, NRC to Discuss 2010 Performance of Farley Nuclear Power Plant23 March 2011Press Release-II-11-010: NRC to Discuss 2010 Performance of Farley Nuclear Power PlantOpen House
ML11084003723 March 2011Notification of Potential Part 21 Report Concerning Valve Plunger Guide Malfunction
ML11081054422 March 2011Notice of Cancelled Forthcoming Meeting with Southern Nuclear Operating Company, Inc. (Snc), to Discuss NFPA 805 License Amendment for Joseph M. Farley Nuclear Plant, Units 1 and 2Fire Protection Program
NL-11-0464, Proposed Alternative for the Fourth Lsi Interval22 March 2011Proposed Alternative for the Fourth Lsi IntervalLoop seal
High Radiation Area
TAC:ME590822 March 2011
ML11076063117 March 2011Notification of Inspection and Request for Information for NRC Problem Identification and Resolution InspectionProbabilistic Risk Assessment
Operator Manual Action
Maintenance Rule Program
IR 05000348/201050211 March 2011NRC Emergency Preparedness Annual Inspection Report 05000348/2010502 and 05000364/2010502
ML1106803619 March 2011Notice of Meeting/Open House Regarding Farley Nuclear Plant Annual AssessmentOpen House
ML1104804057 March 2011Notice of Forthcoming Meeting with Southern Nuclear Operating Company to Discuss NFPA 805 License Amendment for FarleyFire Protection Program
IR 05000348/20112014 March 2011IR 05000348-11-201, 05000364-11-201; February 14, 2011 Through February 17, 2011, Joseph M. Farley Nuclear Plant Units 1 and 2; Target Set Inspection. Cover LetterAffidavit
ML1106301484 March 2011Report 22, Inspection/Activity Plan 01/01/2011 - 06/30/2012
ML1106301424 March 2011Farely End-of-Cycle Letter
IR 05000348/20114024 March 2011IR 05000348-11-402 & 05000364-11-402, on 02/04/11, for Joseph M. FarleyAffidavit
ML1103802063 March 20111 & 2, Edwin I. Hatch Nuclear Plant 1 & 2, and Vogtle Electric Generating Plant, 1 & 2 - Request for Additional Information on Cyber Security PlanCyber Security
ML1106106662 March 2011Notice of Public Meeting to Discuss Fleet Improvement Initiatives - Southern Nuclear Plants, Docket Nos. 50-348, 50-364, 50-424, 50-425, 50-321, and 50-366
ML11060034128 February 2011Annual Reporting Form for Drug and Alcohol Tests, for Period Ending 2010
ML11060033728 February 2011CFR Part 26, Subpart I - Managing Fatigue for Period Ending 2010
ML11060029828 February 2011Corporate - Southern Nuclear, Annual Reporting Form for Drug and Alcohol Tests, for Period Ending 2010
TAC:ME435625 February 2011
ML11054046125 February 2011Request for Additional Information on Cyber Security ProgramCyber Security
ML11053018421 February 2011Joseph M. Farley Nuclear Plant and Edwin I. Hatch Nuclear Plant - Supplement to Licensing Amendment Request for the Implement Technical Specification Task Force 425 - A. Revision 3Shutdown Margin
Hydrostatic
Squib
Surveillance Frequency Control Program
NL-11-0298, Comment (4) of M. J. Ajuni on Behalf of Southern Nuclear Operating Co. Draft NRC Regulatory Issue Summary (RIS) 2011-XX, Adequacy of Station Electric Distribution System Voltages17 February 2011Comment (4) of M. J. Ajuni on Behalf of Southern Nuclear Operating Co. Draft NRC Regulatory Issue Summary (RIS) 2011-XX, Adequacy of Station Electric Distribution System VoltagesBackfit
NL-11-0298, Joseph M. Farley, Units 1 and 2, Edwin I. Hatch, Units 1 and 2, and Vogtle, Units 1 and 2, Comments on Draft NRC Regulatory Issue Summary 2011-xx, Adequacy of Station Electric Distribution System Voltages.17 February 2011Joseph M. Farley, Units 1 and 2, Edwin I. Hatch, Units 1 and 2, and Vogtle, Units 1 and 2, Comments on Draft NRC Regulatory Issue Summary 2011-xx, Adequacy of Station Electric Distribution System Voltages.Backfit
ML11048040317 February 2011Edwin I. Hatch, Units 1 and 2, and Vogtle, Units 1 and 2, Comments on Draft NRC Regulatory Issue Summary 2011-xx, Adequacy of Station Electric Distribution System Voltages.Backfit
NL-11-0255, Outage Inservice Inspection Summary Report15 February 2011Outage Inservice Inspection Summary ReportHydrostatic
Nondestructive Examination
VT-2
FLEX
Dissimilar Metal Weld
ML11041067614 February 2011Evaluation of the Request for an Extension of Enforcement Discretion in Accordance with the Interim Enforcement Policy for Fire Protection Issues During Transition to National Fire Protection Standard (NFPA) 805Enforcement Discretion
IR 05000348/201000527 January 2011IR 05000348-10-005 and 05000364-10-005; 10/01/2010 - 12/31/2010; Joseph M. Farley Nuclear Plant, Units 1 and 2; Fire Protection, Identification, and Resolution of ProblemsSafe Shutdown
Boric Acid
High Radiation Area
Non-Destructive Examination
Fire Barrier
Time to boil
Weld Overlay
Internal Flooding
Hydrostatic
Coatings
VT-2
Functionality Assessment
Locked High Radiation Area
Significance Determination Process
Substantial potential for overexposure
Overexposure
ML11025015725 January 2011Acceptance of Farley Relief Request Dated January 5, 2011
IR 05000348/201050114 January 2011
IR 05000364/201050114 January 2011IR 05000364-10-501, on 12/06/10 - 12/17/10, Joseph M. Farley, Emergency Preparedness Inspection
ML11014090113 January 2011Notification of Licensed Operator Initial Examination - 05000348/11-301 and 05000364/11-301
ML1101303907 January 2011Annual Letter - Generic Fundamentals Examination (GFE) SectionGeneric Fundamentals Examination
TAC:ME52735 January 2011
NL-10-2355, Request for Approval of Risk-Informed/Safety Based Inservice Inspection Alternative for Class 1 and 2 Piping FNP-ISI-AL T-12, Version 2.05 January 2011Request for Approval of Risk-Informed/Safety Based Inservice Inspection Alternative for Class 1 and 2 Piping FNP-ISI-AL T-12, Version 2.0High winds
Mission time
Weld Overlay
Internal Flooding
Probabilistic Risk Assessment
Nondestructive Examination
VT-2
Seismically rugged
Large early release frequency
Dissimilar Metal Weld