Letter Sequence Request |
---|
|
|
MONTHYEARSBK-L-10056, Request for Use of an Alternate Depth Sizing Qualification2010-03-25025 March 2010 Request for Use of an Alternate Depth Sizing Qualification Project stage: Request ML1012702572010-05-0707 May 2010 E-mail, Miller, to O'Keefe, Seabrook, Acceptance Review, ASME Code Alternative, Alternate Depth Sizing Qualification Project stage: Acceptance Review ML1020906832010-07-28028 July 2010 Electronic Transmission, Draft Request for Additional Information Regarding Relief Request for Alternate Depth Sizing Qualification Project stage: Draft RAI SBK-L-10148, Response to Draft Request for Additional Information Re Request for Alternate Depth Sizing Qualification2010-08-31031 August 2010 Response to Draft Request for Additional Information Re Request for Alternate Depth Sizing Qualification Project stage: Draft Request ML1031901392010-11-22022 November 2010 Relief Request for Use of Alternate Depth Sizing Qualification, Third 10-Year Interval Project stage: Other NL-11-0463, Proposed Relief Request for the Fourth ISI Interval (FNP-ISI-RR-01)2011-03-28028 March 2011 Proposed Relief Request for the Fourth ISI Interval (FNP-ISI-RR-01) Project stage: Request 2010-05-07
[Table View] |
|
---|
Category:Letter type:NL
MONTHYEARNL-24-0011, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-01-11011 January 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0901, 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers2023-12-15015 December 2023 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers NL-23-0908, Cycle 30 Core Operating Limits Report2023-12-13013 December 2023 Cycle 30 Core Operating Limits Report NL-23-0877, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0825, Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection2023-11-14014 November 2023 Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection NL-23-0739, Response to NRC Inspection Report and Preliminary White Finding2023-09-0808 September 2023 Response to NRC Inspection Report and Preliminary White Finding NL-23-0716, Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-23023 August 2023 Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0713, Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-23023 August 2023 Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0704, Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-22022 August 2023 Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0628, Readiness for Supplemental Inspection EA-22-1012023-07-26026 July 2023 Readiness for Supplemental Inspection EA-22-101 NL-23-0566, ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use2023-07-13013 July 2023 ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use NL-23-0555, Request for Exemption from Physical Barrier Requirement2023-07-0707 July 2023 Request for Exemption from Physical Barrier Requirement NL-23-0506, to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications2023-07-0505 July 2023 to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications NL-23-0444, Quality Assurance Topical Report Submittal2023-06-15015 June 2023 Quality Assurance Topical Report Submittal NL-23-0457, ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use2023-06-12012 June 2023 ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use NL-23-0449, National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application2023-06-0202 June 2023 National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. NL-23-0372, Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 20222023-05-10010 May 2023 Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 2022 NL-23-0337, Response to Request for Additional Information Related to License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.52023-05-0505 May 2023 Response to Request for Additional Information Related to License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.5 NL-23-0295, Reply to a Notice of Violation; EA-22-1012023-05-0101 May 2023 Reply to a Notice of Violation; EA-22-101 NL-23-0310, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20222023-04-25025 April 2023 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2022 NL-23-0019, GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2023-04-12012 April 2023 GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI NL-23-0263, Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report2023-04-0505 April 2023 Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report NL-23-0208, Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update2023-03-29029 March 2023 Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update NL-23-0014, Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding2023-03-29029 March 2023 Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding NL-23-0213, Inservice Inspection Program Owner'S Activity Report for Outage 1R312023-03-21021 March 2023 Inservice Inspection Program Owner'S Activity Report for Outage 1R31 NL-23-0228, Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21)2023-03-20020 March 2023 Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21) NL-23-0080, Response to Request for Additional Information (RAI) Related to Proposed Inservice Inspection Alternative FNP-ISI-ALT-05-05, Version 1.02023-02-0202 February 2023 Response to Request for Additional Information (RAI) Related to Proposed Inservice Inspection Alternative FNP-ISI-ALT-05-05, Version 1.0 NL-23-0008, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 3.4.10, Pressurizer Safety Valves to Decrease Low Side Setpoint Tolerance Limiting.2023-01-17017 January 2023 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 3.4.10, Pressurizer Safety Valves to Decrease Low Side Setpoint Tolerance Limiting. NL-23-0011, Update to Supporting Documentation Regulatory Conference EA-22-101. Cover Letter Only2023-01-0505 January 2023 Update to Supporting Documentation Regulatory Conference EA-22-101. Cover Letter Only NL-22-0799, License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.52022-12-20020 December 2022 License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.5 NL-22-0897, Supplement to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A,2022-12-0909 December 2022 Supplement to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, NL-22-0887, Cycle 32 Core Operating Limits Report2022-11-21021 November 2022 Cycle 32 Core Operating Limits Report NL-22-0884, Response to NRC Inspection Report 05000348/2022440 and 05000364/2022440 EA-22-1012022-11-17017 November 2022 Response to NRC Inspection Report 05000348/2022440 and 05000364/2022440 EA-22-101 NL-20-0170, Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC2022-10-14014 October 2022 Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC NL-22-0756, Proposed Inservice Inspection Alternative FNP-ISI-ALT-05-05, Version 1.02022-09-30030 September 2022 Proposed Inservice Inspection Alternative FNP-ISI-ALT-05-05, Version 1.0 NL-22-0289, License Amendment Request to Revise Technical Specification 4.3 Fuel Storage to Correct Tabulated Values from the Associated Spent Fuel Pool (SFP) Criticality Analysis2022-09-21021 September 2022 License Amendment Request to Revise Technical Specification 4.3 Fuel Storage to Correct Tabulated Values from the Associated Spent Fuel Pool (SFP) Criticality Analysis NL-22-0608, Interim 10 CFR 21.21(a)(2) Report Regarding Framatome Supplied Siemens Medium Voltage Circuit Breakers2022-08-17017 August 2022 Interim 10 CFR 21.21(a)(2) Report Regarding Framatome Supplied Siemens Medium Voltage Circuit Breakers NL-22-0552, Inservice Inspection Program Owner'S Activity Report for Outage 2R282022-07-28028 July 2022 Inservice Inspection Program Owner'S Activity Report for Outage 2R28 NL-22-0510, Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20212022-07-14014 July 2022 Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2021 NL-22-0223, License Amendment to Revise Technical Specification 3.4.10, Pressurizer Safety Valves to Decrease Low Side Setpoint Tolerance Limiting Condition for Operation (LCO) Value2022-06-30030 June 2022 License Amendment to Revise Technical Specification 3.4.10, Pressurizer Safety Valves to Decrease Low Side Setpoint Tolerance Limiting Condition for Operation (LCO) Value NL-22-0361, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 5.5.17, Containment Leakage Rate Testing Program to Increase Calculated Peak.2022-06-20020 June 2022 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 5.5.17, Containment Leakage Rate Testing Program to Increase Calculated Peak. NL-22-0362, Southern Nuclear Operating Company, Inc. - Foreign Ownership, Control, or Influence Five-Year Renewal Filing and NRC Facility Clearance Update2022-06-0101 June 2022 Southern Nuclear Operating Company, Inc. - Foreign Ownership, Control, or Influence Five-Year Renewal Filing and NRC Facility Clearance Update NL-22-0388, Cycle 29 Core Operating Limits Report2022-05-31031 May 2022 Cycle 29 Core Operating Limits Report NL-22-0344, Annual Radiological Environmental Operating Reports for 20212022-05-10010 May 2022 Annual Radiological Environmental Operating Reports for 2021 NL-22-0340, Response to Request for Additional Information Related to Request for License Amendment to Relocate Augmented Piping Inspection Program Details from Technical2022-05-10010 May 2022 Response to Request for Additional Information Related to Request for License Amendment to Relocate Augmented Piping Inspection Program Details from Technical NL-22-0240, SNC Response to Regulatory Issue Summary 2022-01: Preparation and Scheduling of Operator Licensing Examinations2022-03-31031 March 2022 SNC Response to Regulatory Issue Summary 2022-01: Preparation and Scheduling of Operator Licensing Examinations 2024-01-11
[Table view] |
Text
Mark J. Ajluni, P.E. Southern Nuclear I~uclear Licensing Director Operating Company, Inc.
40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.7673 Fax 205.992.7885 March 28, 2011 SOUTHERN'\
COMPANY Docket Nos.: 50-348 NL-11-0463 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Unit 1 Proposed Relief Request for the Fourth lSI Interval (FNP-ISI-RR-01 )
Ladies and Gentlemen:
Pursuant to 10 CFR 50.55a(g)(5)(iii), Southern Nuclear Operating Company (SNC) requests approval to use an alternate depth-sizing qualification for volumetric examinations of the reactor pressure vessel (RPV) nozzle-to-safe end dissimilar metal (DSM) welds from the inside surface. Specifically, SNC proposes to use a root mean square error criterion for sizing flaws that is greater than that allowed by the ASME Code. This relief request is similar to Seabrook Station's (Unit 1) request for use of an alternate depth-sizing qualification that was approved by the NRC in letter (TAC No. ME3623) dated November 22,2010.
The basis for the proposed relief request for Farley Nuclear Plant Unit 1 is provided in the Enclosure to this letter.
This letter contains no NRC commitments. If you have any questions, please contact Jack Stringfellow at (205) 992-7037.
Sincerely, fVLJ ~ 1-'
M. J. Ajluni Nuclear Licensing Director MJAlLPH/lac
Enclosure:
Proposed Relief Request FNP-ISI-RR-01, Version 1.0, Per 10 CFR 50.55a(g)(5)(iii)
U. S. Nuclear Regulatory Commission NL-11-0463 Page 2 cc: Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. L. M. Stinson, Vice President - Farley Ms. P. M. Marino, Vice President - Engineering RTYPE: CFA04.054 U. S. Nuclear Regulatory Commission Mr. V.M. McCree, Regional Administrator Mr. R. E. Martin, NRR Project Manager - Farley Mr. E. L. Crowe, Senior Resident Inspector - Farley Mr. P. Boyle, I\IRR Project Manager
Joseph M. Farley Nuclear Plant - Unit 1 Proposed Relief Request for the Fourth lSI Interval Enclosure 1 Proposed Relief Request FNP-ISI-RR-01, Version 1.0, Per 10 CFR SO.SSa(g)(S)(iii)
Enclosure 1 Proposed Relief Request FNP-ISI-RR-01, Version 1.0, Per 10 CFR SO.SSa(g)(S)(iii)
Plant Site-Unit: Joseph M. Farley Nuclear Plant (FNP) - Unit 1.
Interval Dates: 4th lSI Interval- December 1,2007 through November 30,2017.
Requested Date Approval is requested by January 3, 2012 to support scheduled for Approval: examinations performed during FNP 1R24 (March 2012).
ASMECode The affected components are the Class 1, Category 8-F, Item 85.10, Components Reactor Pressure Vessel (RPV) nozzle to safe-end dissimilar metal (DSM)
Affected: butt welds, as follows:
ALA 1-4100-1 DM Loop 1 Outlet Nozzle To Safe-End ALA 1-4200-1 DM Loop 2 Outlet Nozzle To Safe-End ALA1-4300-1DM Loop 3 Outlet Nozzle To Safe-End ALA1-41 00-14DM Loop 1 Safe-End To Inlet Nozzle ALA 1-4200-14DM Loop 2 Safe-End To Inlet Nozzle ALA 1-4300-14DM Loop 3 Safe-End To Inlet Nozzle Applicable Code The applicable Code edition and addenda is ASME Section XI, "Rules for Edition and Inservice Inspection of Nuclear Power Plant Components," 2001 Edition Addenda: through the 2003 addenda. In addition, as required by 10 CFR 50.55a, ASME Section XI, 2001 Edition is used for Appendix VIII, "Performance Demonstration for Ultrasonic Examination Systems."
Applicable Code The volumetric examination specified by Examination Category 8-F, Item Requirements: 85.10, "RPV nozzle to safe-end DSM butt welds" will be performed using the ultrasonic (UT) examination method as described in IWA-2232 and Appendix I. Appendix 1,1-2220 requires that ultrasonic examination procedures, equipment, and personnel be qualified by performance demonstration in accordance with Appendix VIII. Instead of the Appendix VIII qualification requirements, Southern Nuclear Operating Company (SNC) is using NRC-approved Code Case N-695, "Qualification Requirements for Dissimilar Metal Piping Welds."
Code Case N-695 provides an alternative to the Appendix VIII, Supplement 10 requirements for the qualification requirements of DSM welds.
Paragraph 3.3(c) indicates examination procedures, equipment, and personnel are qualified for depth-sizing when the Root Mean Square (RMS) error of the flaw depth measurements, as compared with the true depths, does not exceed 0.125 inches.
1
Enclosure 1 Proposed Relief Request FNP-ISI-RR-01, Version 1.0, Per 10 CFR 50.55a(g}(5}(iii)
Impracticality of Southern Nuclear Operating Company will be performing volumetric Compliance: examinations of the RPV nozzle-to-safe end dissimilar metal welds from the inside surface during the upcoming 1R24 outage (March 2012) and will implement the alternative requirements of ASME Code Case N-695. Code Case N-695 requires that qualified procedures and personnel shall demonstrate a flaw depth-sizing error less than or equal to 0.125 inch RMS.
This relief request is being submitted due to the impracticality of meeting the required 0.125 inch RMS value required by Code Case N-695. The nuclear power industry has attempted to qualify personnel and procedures for depth-sizing examinations performed from the inside surface of dissimilar metal welds since November 2002. To date, no domestic inspection vendor has met RIVIS error requirements of Code Case N-695.
The inability of examination procedures to achieve the required RMS error value is primarily due to a combination of factors such as surface condition (e.g., roughness), scan access, base materials, and the dendritic structure in the welds themselves. The combination of these factors has proven too difficult for vendors to achieve an RMS error value that meets the established requirements.
Burden Caused The most recent attempt at achieving 0.125 inch RMS error was in early by Compliance: 2008. This attempt, as well as previous attempts, did not achieve the required RMS error value. The qualification attempts have been substantial.
The attempts have involved multiple vendors, ultrasonic instruments, personnel, and flaw depth-sizing methodologies, all of which have been incapable of achieving the 0.125 inch RMS error value.
The process of qualification for this type of flaw sizing is well established.
The cost and effort involved to perform a successful demonstration is quantifiable when a capable technique is available. However, when a capable technique is not available, the costs and effort required for a successful demonstration cannot be easily quantified.
Proposed SNC proposes using an alternative depth-sizing RMS error value greater Alternative and than the 0.125 inch RMS error value stated in ASME Code Case N-695 for Basis for Use: the examination of welds listed above. SNC proposes to use a RMS error of 0.189 inches (based on the results achieved by SNC's examination vendor) instead of the 0.125 inches required for Code Case N-695. In the event an indication is detected that requires depth-sizing, the difference between the required RMS error and the demonstrated RMS error will be added to the measured through-wall extent for comparison with applicable ASME Section XI acceptance criteria.
If the examination vendor demonstrates an improved depth-sizing RMS error prior to the examination, the excess of that improved RMS error over the 0.125 inch RMS error requirement, if any, will be added to the measured value for comparison with applicable acceptance criteria. In the event that an indication is detected that requires depth-sizing, a process will E-2
Enclosure 1 Proposed Relief Request FNP-ISI-RR-01, Version 1.0, Per 10 CFR 50.55a(g)(5)(iii) be used where the difference between the required RMS error and vendor demonstrated RMS error will be added to the measured through-wall depth.
This amended through-wall depth will then be used to determine the acceptability of the indication, as follows:
- For planar indications that are not connected to the inside surface, the amended through-wall depth will be compared with the Section IW8 3S00 acceptance criteria.
- For planar indications that are connected to the inside surface, an IW8 3600 evaluation will be performed per Section 7 of MRP-139, Revision 1 or per future NRC rule-making (such as the expedited implementation of Code Case N-770) which will supersede MRP-139 requirements.
The proposed alternative assures that the DSM nozzle-to-safe-end welds will be fully examined by procedures, personnel and equipment qualified by demonstration in all aspects except depth-sizing. Therefore, it will assure that there is reasonable assurance of structural integrity and thus, will provide an acceptable level of quality and safety. Pursuant to 10 CFR SO.SSa(g)(S)(iii), relief is requested to use this alternative depth-sizing error due to impracticality.
Duration of The proposed relief request is applicable for the 4th Inservice Inspection Proposed Relief Request: Interval for FNP Unit 1.
Precedents: Seabrook Station Unit No.1 has received approval of a similar relief request.
References:
Seabrook submitted their relief request by letter dated March 2S, 2010 (ML100890436) as supplemented by letter dated August 31, 2010 (ML 102S00268). NRC approval was granted by letter dated November 22, 2010 (ML103190139).
Status: Awaiting NRC approval.
E-3