ML110140901

From kanterella
Jump to navigation Jump to search
Notification of Licensed Operator Initial Examination - 05000348/11-301 and 05000364/11-301
ML110140901
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 01/13/2011
From: Widmann M
Division of Reactor Safety II
To: Jerrica Johnson
Southern Nuclear Operating Co
References
Download: ML110140901 (6)


See also: IR 05000348/2011301

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVE., NE., SUITE 1200

ATLANTA, GEORGIA 30303-1257

January 13, 2011

Mr. J. Randy Johnson

Vice President - Farley

Southern Nuclear Operating Company, Inc.

7388 North State Highway 95

Columbia, AL 36319

SUBJECT:

FARLEY NUCLEAR STATION - NOTIFICATION OF LICENSED OPERATOR

INITIAL EXAMINATION - 05000348/2011301 AND 05000364/2011301

Dear Mr. Johnson:

In a telephone conversation on December 28, 2010, between Mr. Gary Ohmstede, Lead

Instructor Exam Development, and Mr. Ronald F. Aiello, Senior Operations Engineer,

arrangements were made for the administration of licensing examinations at the Farley Nuclear

Station. The operating test is scheduled to be administered during the weeks of May 9, 2011,

and May 16, 2011. The written examination is scheduled to be administered on May 24, 2011.

The on-site preparatory week is scheduled for the week of April 18, 2011.

As agreed during the telephone conversation, your staff will prepare both the operating test and

written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,

"Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory

Commission (NRC) regional office will discuss with your staff any changes that might be

necessary before the examinations are administered. Your staff has also agreed to make

copies of all examination materials that are necessary for administering the examination.

Your training staff furnished us the operating test outline on October 18, 2010. Mr. Aiello

provided a written examination outline to your staff in September 2010. The written

examination, operating test, and the supporting reference materials identified in Attachment 3 to

ES-201 will be due by March 14, 2011. Pursuant to Title 10, Section 55.40(b)(3), of the Code of

Federal Regulations (10 CFR55.40(b)(3)), an authorized representative of the facility licensee

shall approve the outline, examination, and test before they are submitted to the NRC for review

and approval. All materials shall be complete and ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in

your response be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examination and reference materials, or the submittal of inadequate or

incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

SNC

2

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications, medical certifications, and waiver

requests, (if any) at least 30 days before the first examination date. If the applications are not

received at least 30 days before the examination date, a postponement may be necessary.

Signed applications certifying that all training has been completed should be submitted at least

14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget. The public reporting burden for this collection of information is

estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response for examinations prepared by the facility,

including the time for reviewing instructions, gathering and maintaining the data needed, and

completing and reviewing the collection of information. Send comments on any aspect of this

collection of information, including suggestions for reducing the burden, to the Information and

Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington,

DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk

Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of

Management and Budget, Washington, DC 20503.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of the NRCs document

system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-

rm.adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. Mr. Ohmstede has been advised of the policies

and guidelines referenced in this letter. If you have any questions regarding the NRC's

examination procedures and guidelines, please contact Mr. Ronald F. Aiello at (404) 997-4641,

(Internet E-mail: ronald.aiello@nrc.gov), or my direct line at (404) 997-4550, (Internet E-mail:

malcolm.widmann@nrc.gov).

Sincerely,

/RA/

Malcolm T. Widmann, Chief

Operations Branch

Division of Reactor Safety

Docket Nos.: 50-348, and 50-364

License Nos.: NPF -2 and NPF- 8

cc: (See page 3)

ML_______________________

x SUNSI REVIEW COMPLETE

OFFICE

RII: DRS

RII: DRS

SIGNATURE

RA

RA

NAME

R. AIELLO

M.WIDMANN

DATE

01/13/2011

01/13/2011

E-MAIL COPY?

YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO

SNC

3

cc w/encl:

B. D. McKinney, Jr.

Regulatory Response Manager

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

M. J. Ajluni

Nuclear Licensing Director

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

T. D. Honeycutt

Regulatory Response Supervisor

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

Todd L. Youngblood

Plant Manager

Joseph M. Farley Nuclear Plant

Electronic Mail Distribution

R. D. Baker

Licensing Supervisor

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

E. G. Anners

Licensing Engineer

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

Jeffrey T. Gasser

Chief Nuclear Officer

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

N. J. Stringfellow

Licensing Manager

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

L. Mike Stinson

Vice President

Fleet Operations Support

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

Paula Marino

Vice President

Engineering

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

Moanica Caston

Vice President and General Counsel

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

Chris Clark

Commissioner

Georgia Department of Natural Resources

Electronic Mail Distribution

John G. Horn

Site Support Manager

Joseph M. Farley Nuclear Plant

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

Ted V. Jackson

Emergency Response and Radiation

Program Manager

Environmental Protection Division

Georgia Department of Natural Resources

Electronic Mail Distribution

Tom W. Pelham

Performance Improvement Supervisor

Joseph M. Farley Nuclear Plant

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

Cynthia A. Sanders

Radioactive Materials Program Manager

Environmental Protection Division

Georgia Department of Natural Resources

Electronic Mail Distribution

James C. Hardeman

Environmental Radiation Program Manager

Environmental Protection Division

Georgia Department of Natural Resources

Electronic Mail Distribution

SNC

4

William D. Oldfield

Principal Licensing Engineer

Joseph M. Farley Nuclear Plant

Electronic Mail Distribution

Senior Resident Inspector

U.S. Nuclear Regulatory Commission

Joseph M. Farley Nuclear Plant

U.S. NRC

7388 N. State Highway 95

Columbia, AL 36319

Mr. Mark Culver

Chairman

Houston County Commission

P. O. Box 6406

Dothan, AL 36302

James A. Sommerville

Program Coordination Branch Chief

Environmental Protection Division

Georgia Department of Natural Resources

Electronic Mail Distribution

James L. McNees, CHP

Director

Office of Radiation Control

Alabama Dept. of Public Health

P. O. Box 303017

Montgomery, AL 36130-3017

State Health Officer

Alabama Dept. of Public Health

Electronic Mail Distribution

F. Allen Barnes

Director

Environmental Protection Division

Georgia Department of Natural Resources

Electronic Mail Distribution

Southern Nuclear Operating Company, Inc

ATTN: Ms. Donna Christiansen, Plant

Training & Emergency Preparedness

Manager

Farley Nuclear Plant

Electronic Mail Distribution

Letter to Mr. J. Randy Johnson from Malcolm T. Widmann dated January 13, 2011.

SUBJECT:

FARLEY NUCLEAR STATION - NOTIFICATION OF LICENSED OPERATOR

INITIAL EXAMINATION - 05000348/2011301 AND 05000364/2011301

Distribution w/encl:

C. Evans, RII

OE Mail

RIDSNRRDIRS

PUBLIC

RidsNrrPMFarley Resource