ML110900685

From kanterella
Jump to navigation Jump to search
Notification of Joseph M. Farley Nuclear Plant - Component Design Bases Inspection - NRC Inspection Report 05000348, 364/2011010
ML110900685
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/31/2011
From: Binoy Desai
NRC/RGN-II/DRS/EB1
To: Jerrica Johnson
Southern Nuclear Operating Co
References
Download: ML110900685 (7)


See also: IR 05000348/2011010

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

March 31, 2011

Mr. J. Randy Johnson

Vice President - Farley

Southern Nuclear Operating Company, Inc.

7388 North State Highway 95

Columbia, AL 36319

SUBJECT: NOTIFICATION OF JOSEPH M. FARLEY NUCLEAR PLANT - COMPONENT

DESIGN BASES INSPECTION - NRC INSPECTION REPORT 05000348,

364/2011010

Dear Mr. Johnson:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II staff will conduct a component design bases inspection at your Farley Nuclear Plant

during the weeks of August 29 - September 2, September 12 - 16 and September 26 - 30,

2011. The inspection team will be led by Shane Sandal, a Senior Reactor Inspector from the

NRC's Region II Office. This inspection will be conducted in accordance with the baseline

inspection procedure, Procedure 71111.21, Component Design Bases Inspection, issued

December 6, 2010.

The inspection will evaluate the capability of risk significant / low margin components to function

as designed and to support proper system operation. The inspection will also include a review

of selected operator actions, operating experience, and modifications.

During a telephone conversation on March 28, 2011, Mr. Sandal confirmed with Mr. Oldfield of

your staff, arrangements for an information gathering site visit and the three-week onsite

inspection. The schedule is as follows:

  • Information gathering visit: Week of August 8 - 12, 2011
  • Onsite weeks: August 29 - September 2, September 12 - 16 and

September 26 - 30, 2011

The purpose of the information gathering visit is to meet with members of your staff to identify

risk-significant components and operator actions. Information and documentation needed to

support the inspection will also be identified. Mr. George MacDonald, a Region II Senior

Reactor Analyst, will accompany Mr. Sandal during the information gathering visit to review

probabilistic risk assessment data and identify risk significant components which will be

examined during the inspection.

The enclosure lists documents that will be needed prior to the information gathering visit.

Please provide the referenced information to the Region II office by August 1, 2011. Contact

Mr. Sandal with any questions concerning the requested information. The inspectors will try to

minimize your administrative burden by specifically identifying only those documents required

for inspection preparation.

SNC 2

Additional documents will be requested during the information gathering visit. The additional

information will need to be made available to the team in the Region II office prior to the

inspection teams preparation week of August 22. Mr. Sandal, will also discuss the following

inspection support administrative details: availability of knowledgeable plant engineering and

licensing personnel to serve as points of contact during the inspection; method of tracking

inspector requests during the inspection; licensee computer access; working space;

arrangements for site access; and other applicable information.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding the

information requested or the inspection, please contact Mr. Sandal at (404) 997-4513 or me at

(404) 997-4519.

Sincerely,

/RA/

Binoy B. Desai, Chief

Engineering Branch 1

Division of Reactor Safety

Docket No.: 50-348, 50-364

License No.: NPF-2, NPF-8

Enclosure: Information Request For Joseph M. Farley Nuclear Plant - Component Design

Bases Inspection

cc w/enc/: (See page 3)

SNC 3

cc w/encl: Paula Marino

Vice President

B. D. McKinney, Jr. Engineering

Regulatory Response Manager Southern Nuclear Operating Company, Inc.

Southern Nuclear Operating Company, Inc. Electronic Mail Distribution

Electronic Mail Distribution

Moanica Caston

M. J. Ajluni Vice President and General Counsel

Nuclear Licensing Director Southern Nuclear Operating Company, Inc.

Southern Nuclear Operating Company, Inc. Electronic Mail Distribution

Electronic Mail Distribution

Chris Clark

T. D. Honeycutt Commissioner

Regulatory Response Supervisor Georgia Department of Natural Resources

Southern Nuclear Operating Company, Inc. Electronic Mail Distribution

Electronic Mail Distribution

John G. Horn

Todd L. Youngblood Site Support Manager

Plant Manager Joseph M. Farley Nuclear Plant

Joseph M. Farley Nuclear Plant Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Electronic Mail Distribution

R. D. Baker Ted V. Jackson

Licensing Supervisor Emergency Response and Radiation

Southern Nuclear Operating Company, Inc. Program Manager

Electronic Mail Distribution Environmental Protection Division

Georgia Department of Natural Resources

E. G. Anners Electronic Mail Distribution

Licensing Engineer

Southern Nuclear Operating Company, Inc. Tom W. Pelham

Electronic Mail Distribution Performance Improvement Supervisor

Joseph M. Farley Nuclear Plant

Jeffrey T. Gasser Southern Nuclear Operating Company, Inc.

Chief Nuclear Officer Electronic Mail Distribution

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Cynthia A. Sanders

Radioactive Materials Program Manager

N. J. Stringfellow Environmental Protection Division

Licensing Manager Georgia Department of Natural Resources

Southern Nuclear Operating Company, Inc. Electronic Mail Distribution

Electronic Mail Distribution

James C. Hardeman

L. Mike Stinson Environmental Radiation Program Manager

Vice President Environmental Protection Division

Fleet Operations Support Georgia Department of Natural Resources

Southern Nuclear Operating Company, Inc. Electronic Mail Distribution

Electronic Mail Distribution

(cc w/encl contd -See page 4)

SNC 4

(cc w/encl contd)

William D. Oldfield

Principal Licensing Engineer

Joseph M. Farley Nuclear Plant

Electronic Mail Distribution

Senior Resident Inspector

U.S. Nuclear Regulatory Commission

Joseph M. Farley Nuclear Plant

U.S. NRC

7388 N. State Highway 95

Columbia, AL 36319

Mr. Mark Culver

Chairman

Houston County Commission

P. O. Box 6406

Dothan, AL 36302

James A. Sommerville

Program Coordination Branch Chief

Environmental Protection Division

Georgia Department of Natural Resources

Electronic Mail Distribution

James L. McNees, CHP

Director

Office of Radiation Control

Alabama Dept. of Public Health

P. O. Box 303017

Montgomery, AL 36130-3017

State Health Officer

Alabama Dept. of Public Health

RSA Tower - Administration

Suite 1552

P.O. Box 30317

Montgomery, AL 36130-3017

F. Allen Barnes

Director

Environmental Protection Division

Georgia Department of Natural Resources

Electronic Mail Distribution

__ML110900685___________________ xG SUNSI REVIEW COMPLETE

OFFICE RII:DRS RII:DRS

SIGNATURE RA RA

NAME SANDAL DESAI

DATE 3/ 31/ 2011 3/31/2011

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES

INFORMATION REQUEST FOR JOSEPH M. FARLEY NUCLEAR PLANT

COMPONENT DESIGN BASES INSPECTION

Please provide the information electronically in .pdf files, Excel, or other searchable format on

CDROM (or FTP site, Sharepoint, etc.) The CDROM (or website) should be indexed and

hyperlinked to facilitate ease of use.

1. From your most-recent probabilistic safety analysis (PSA) excluding external events and

fires:

a. Two risk rankings of components from your site-specific probabilistic safety analysis

(PSA): one sorted by Risk Achievement Worth (RAW), and the other sorted by

Birnbaum Importance.

b. A list of the top 500 cutsets.

2. From your most-recent probabilistic safety analysis (PSA) including external events and

fires:

a. Two risk rankings of components from your site-specific probabilistic safety analysis

(PSA): one sorted by Risk Achievement Worth (RAW), and the other sorted by

Birnbaum Importance.

b. A list of the top 500 cutsets.

3. Risk ranking of operator actions from your site specific PSA sorted by RAW. Provide

human reliability worksheets for these items.

4. List of time critical operator actions with a brief description of each action.

5. List of Emergency and Abnormal Operating Procedures revised (significant) since March 1,

2009 with a brief description of each revision.

6. List of components with low design margins (i.e., pumps closest to the design limit for flow

or pressure, diesel generator close to design required output, heat exchangers close to

rated design heat removal, MOV risk-margin rankings, etc.) and associated evaluations or

calculations.

7. List of station operating experience evaluations/reviews performed and documented in the

stations corrective action program for industry events and safety related equipment

failures/vulnerabilities [as communicated by NRC generic communications, industry

communications, 10 CFR part 21 notifications, etc.] since March 1, 2009.

8. List and brief description of safety related SSC design modifications implemented since

March 1, 2009.

9. List and brief description of common-cause component failures that have occurred since

March 1, 2009.

10. List and brief description of operability evaluations completed since March 1, 2009.

11. List of equipment on the sites Station Equipment Reliability Issues List, including a

description of the reason(s) why each component is on that list and summaries (if available)

of your plans to address the issue(s).

Enclosure

2

12. List and brief description of equipment currently in degraded or nonconforming status as

described in RIS 05-020.

13. List and reason for equipment classified in maintenance rule (a)(1) status since March 1,

2009 to present.

14. Copies of System Descriptions (or the like design basis documents) for Safety-Related

Systems

15. Copy of UFSAR(s)

16. Copy of Technical Specification(s)

17. Copy of Technical Specifications Bases

18. Copy of Technical Requirements Manual(s)

19. List and brief description of Root Cause Evaluations that have been performed since March

1, 2009

20. In-service Testing Program Procedure(s)

21. Corrective Action Program Procedure(s)

22. One line diagram of electrical plant (electronic and full size - hard copy week of August 8)

23. Index and legend for electrical plant one-line diagrams

24. Primary AC calculation(s) for safety-related buses

25. Primary DC calculation(s) for safety-related buses

26. PI&Ds for ECCS systems (electronic and 1/2 size - hard copy week of August 8)

27. Index and Legend for PI&Ds

28. Copy of design bases documents for ECCS systems

29. Copy of Operability determination procedure(s)

30. Copies of condition reports associated with findings from previous CDBI (if applicable)

31. Index (procedure number, titles, and current revision) of station Emergency Operating

Procedures (EOPs), Abnormal Operating Procedures (AOPs), and Annunciator Response

Procedures (ARPs)

32. Contact information for a person to discuss PRA information prior to the information

gathering trip (name, title, phone number, and e-mail address)

Enclosure