Issue date | Title | Topic | |
---|---|---|---|
ML110960073 | 31 March 2011 | Submittal of Decommissioning Funding Status Report | |
TAC:ME3717 | 31 March 2011 | ||
ML110680394 | 31 March 2011 | Relief from the Requirements of the Asme Code; 2-ISI-40 | Incorporated by reference |
ML110960072 | 31 March 2011 | Guarantee of Payment of Deferred Premiums - 2010 Annual Report | |
ML110110051 | 31 March 2011 | Safety Evaluation for Relief Request 2-Isi-41, for the Third 10-Year Inservice Inspection Interval | Weld Overlay Nondestructive Examination Incorporated by reference |
Press Release-II-11-012, NRC Schedules Conference with TVA to Discuss Browns Ferry Nuclear Plant Issues | 30 March 2011 | Press Release-II-11-012: NRC Schedules Conference with TVA to Discuss Browns Ferry Nuclear Plant Issues | |
TAC:L24550 | 30 March 2011 | ||
ML110240474 | 30 March 2011 | Safety Evaluation for Relief Request 2-PDI-40, for the Fourth 10-Year Inservice Inspection Interval | Incorporated by reference Dissimilar Metal Weld |
TAC:ME3719 | 30 March 2011 | ||
TAC:ME3720 | 28 March 2011 | ||
ML11095A073 | 28 March 2011 | Request for Additional Information Regarding a Request to Transition to Areva Fuel | |
ML110820353 | 28 March 2011 | Request for Additional Information Regarding 2-ISI-1, Updated Risk-Informed Inservice Inspection Program | |
ML110310453 | 24 March 2011 | Safety Evaluation for Relief Request 2-ISI-43, for the Fourth 10-Year Inservice Inspection Interval | Hydrostatic |
ML110871250 | 24 March 2011 | BWR Vessel and Internals Inspection Summaries for Spring 2010 Outages | Weld Overlay VT-2 Earthquake EVT-1 Dissimilar Metal Weld DM weld |
TAC:ME3721 | 24 March 2011 | ||
ML110840035 | 22 March 2011 | Letter Re Licensee Event Report Which Occurred on December 22, 2010, Concerning Low Pressure Coolant Injection Operability, TVA Expects to Submit a Revised LER by April 15, 2011 | |
ML110831044 | 21 March 2011 | Tennessee Valley Authority - Re-submittal of Attachments for Responses to Hydrology Action Items | |
ML110830037 | 21 March 2011 | American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, Inservice Inspection Program, Third Ten-Year Inspection Interval, Request for Relief 3-ISI-26 | |
TAC:ME5914 | 21 March 2011 | ||
ML110810568 | 21 March 2011 | Notice of Meeting with Tennessee Valley Authority to Discuss Safety Significance of One Preliminary Greater than Green Finding Associated with One Apparent Violation That Was Documented in NRC Inspection Report 05000259-01-005, 05000260-10- | |
IR 05000259/2001005 | 21 March 2011 | Notice of Meeting with Tennessee Valley Authority to Discuss Safety Significance of One Preliminary Greater than Green Finding Associated with One Apparent Violation That Was Documented in NRC Inspection Report 05000259-01-005, 05000260-10- | |
NRC-2011-0013, Comment (12) of R. M. Krich, on Behalf of TVA, on Draft Regulatory Issues Summary, Adequacy of Station Electric Distribution System Voltages, (Docket Id NRC-2011-0013) | 18 March 2011 | Comment (12) of R. M. Krich, on Behalf of TVA, on Draft Regulatory Issues Summary, Adequacy of Station Electric Distribution System Voltages, (Docket Id NRC-2011-0013) | |
ML110760683 | 17 March 2011 | Initial Exam 2011-301 Final RO Written Exam with References | Safe Shutdown Half scram Squib Severe Accident Management Guideline |
ML110760012 | 14 March 2011 | Reply to Request for Regulatory Conference | |
ML110740225 | 11 March 2011 | Reply to a Notice of Violation; EA-11-012 | |
ML110660349 | 10 March 2011 | Request for Additional Information Regarding Technical Specification Change TS-474 | |
IR 05000259/2010502 | 9 March 2011 | ||
ML110730703 | 9 March 2011 | Brownsferry Nuclear Plant, NRC Emergency Preparedness Annual Inspection Report 05000259-10-502, 05000260-10-502 and 05000296-10-502 | |
TAC:ME4957 | 8 March 2011 | ||
ML110540131 | 8 March 2011 | Units 1 & 2, Request for Additional Information Regarding Cyber Security Plans Based on Nuclear Energy Institute 08-09, Revision 6 | Cyber Security |
ML110630427 | 4 March 2011 | Annual Assessment Letter for the Browns Ferry Nuclear Plant Unit 1 (IR 05000259,260,296-11-001) | |
ML110630441 | 4 March 2011 | Inspection/Activity Plan 03/01/2011 - 06/30/2012 | |
ML110670225 | 2 March 2011 | Core Operating Limits Report for Cycle 17 Operation | Shutdown Margin Coast down |
ML110610641 | 2 March 2011 | NRC Report 05000259/2010005, 05000260/2010005, and 05000296/2010005; Preliminary Greater than Green Finding Browns Ferry Nuclear Plant | Safe Shutdown Reactor Vessel Water Level Mission time Fire Barrier Weld Overlay Internal Flooding Past operability Nondestructive Examination Temporary Modification Condition Adverse to Quality Tornado Generated Missile Significance Determination Process Job Performance Measure Foreign Material Exclusion Liquid penetrant Fire Watch Power change Downpower |
ML110460496 | 28 February 2011 | Safety Evaluation for Relief Request 1-ISI-26, Risk-Informed Inservice Inspection Program. | Probabilistic Risk Assessment Incorporated by reference |
ML110590055 | 28 February 2011 | ANP-2988NP, Revision 0, Browns Ferry Nuclear Plant, Unit 1, Areva Fuel Transition Input to TVA for Rais, Enclosure 3 | Shutdown Margin Anticipated operational occurrence Power change |
ML110610737 | 28 February 2011 | Tennessee Valley Authority - Fitness for Duty Annual Program Performance Data, January Through December 2010 | Fitness for Duty |
TAC:ME5799 | 25 February 2011 | ||
ML110610738 | 25 February 2011 | Submittal of Report in Accordance with 10 CFR 26.719(c)(1) for Drug and Alcohol Testing Errors | Fitness for Duty |
ML110600408 | 25 February 2011 | Technical Specification Change TS-429 - Deletion of Low Pressure Coolant Injection Motor-Generator Sets | Safe Shutdown Abnormal operational transient |
TAC:ME5796 | 25 February 2011 | ||
ML110610739 | 24 February 2011 | Information Related to the Safety Significance of the Apparent Violation Concerning Failure of Unit 1 Residual Heat Removal System Low Pressure Injection Valve | Safe Shutdown Finite Element Analysis Significance Determination Process |
ML110590054 | 23 February 2011 | Response to NRC Request for Additional Information Regarding Amendment Request to Transition to Areva Fuel | Shutdown Margin Incorporated by reference |
ML110550646 | 22 February 2011 | American Society of Mechanical Engineers Section Xl, Inservice Inspection, System Pressure Test, Containment Inservice Inspection, and Repair and Replacement Programs - Owner'S Activity Report for Cycle 8 Operation | |
ML110480888 | 17 February 2011 | Revised - Browns Ferry Nuclear Power Plant - Operator Licensing Written Examination Approval 05000259/2011301, 05000260/2011301 and 05000296/2011301 | |
ML110480551 | 17 February 2011 | Acceptance Review Results for Relief Request 3-ISI-25 | |
ML110480054 | 15 February 2011 | Notification of Potential Part 21 Reportable Condition: Crack Indications in Marathon Control Rod Blades | |
ML110460487 | 15 February 2011 | Notification of Potential Part 21 Reportable Condition Re Design Life of D and s Lattice Marathon Control Blades | |
ML110460455 | 15 February 2011 | Notification of Inspection and Request for Information | Nondestructive Examination |
ML110470406 | 14 February 2011 | Service List Change Update |