ML11096007331 March 2011Submittal of Decommissioning Funding Status Report
TAC:ME371731 March 2011
ML11068039431 March 2011Relief from the Requirements of the Asme Code; 2-ISI-40Incorporated by reference
ML11096007231 March 2011Guarantee of Payment of Deferred Premiums - 2010 Annual Report
ML11011005131 March 2011Safety Evaluation for Relief Request 2-Isi-41, for the Third 10-Year Inservice Inspection IntervalWeld Overlay
Nondestructive Examination
Incorporated by reference
Press Release-II-11-012, NRC Schedules Conference with TVA to Discuss Browns Ferry Nuclear Plant Issues30 March 2011Press Release-II-11-012: NRC Schedules Conference with TVA to Discuss Browns Ferry Nuclear Plant Issues
TAC:L2455030 March 2011
ML11024047430 March 2011Safety Evaluation for Relief Request 2-PDI-40, for the Fourth 10-Year Inservice Inspection IntervalIncorporated by reference
Dissimilar Metal Weld
TAC:ME371930 March 2011
TAC:ME372028 March 2011
ML11095A07328 March 2011Request for Additional Information Regarding a Request to Transition to Areva Fuel
ML11082035328 March 2011Request for Additional Information Regarding 2-ISI-1, Updated Risk-Informed Inservice Inspection Program
ML11031045324 March 2011Safety Evaluation for Relief Request 2-ISI-43, for the Fourth 10-Year Inservice Inspection IntervalHydrostatic
ML11087125024 March 2011BWR Vessel and Internals Inspection Summaries for Spring 2010 OutagesWeld Overlay
VT-2
Earthquake
EVT-1
Dissimilar Metal Weld
DM weld
TAC:ME372124 March 2011
ML11084003522 March 2011Letter Re Licensee Event Report Which Occurred on December 22, 2010, Concerning Low Pressure Coolant Injection Operability, TVA Expects to Submit a Revised LER by April 15, 2011
ML11083104421 March 2011Tennessee Valley Authority - Re-submittal of Attachments for Responses to Hydrology Action Items
ML11083003721 March 2011American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, Inservice Inspection Program, Third Ten-Year Inspection Interval, Request for Relief 3-ISI-26
TAC:ME591421 March 2011
ML11081056821 March 2011Notice of Meeting with Tennessee Valley Authority to Discuss Safety Significance of One Preliminary Greater than Green Finding Associated with One Apparent Violation That Was Documented in NRC Inspection Report 05000259-01-005, 05000260-10-
IR 05000259/200100521 March 2011Notice of Meeting with Tennessee Valley Authority to Discuss Safety Significance of One Preliminary Greater than Green Finding Associated with One Apparent Violation That Was Documented in NRC Inspection Report 05000259-01-005, 05000260-10-
NRC-2011-0013, Comment (12) of R. M. Krich, on Behalf of TVA, on Draft Regulatory Issues Summary, Adequacy of Station Electric Distribution System Voltages, (Docket Id NRC-2011-0013)18 March 2011Comment (12) of R. M. Krich, on Behalf of TVA, on Draft Regulatory Issues Summary, Adequacy of Station Electric Distribution System Voltages, (Docket Id NRC-2011-0013)
ML11076068317 March 2011Initial Exam 2011-301 Final RO Written Exam with ReferencesSafe Shutdown
Half scram
Squib
Severe Accident Management Guideline
ML11076001214 March 2011Reply to Request for Regulatory Conference
ML11074022511 March 2011Reply to a Notice of Violation; EA-11-012
ML11066034910 March 2011Request for Additional Information Regarding Technical Specification Change TS-474
IR 05000259/20105029 March 2011
ML1107307039 March 2011Brownsferry Nuclear Plant, NRC Emergency Preparedness Annual Inspection Report 05000259-10-502, 05000260-10-502 and 05000296-10-502
TAC:ME49578 March 2011
ML1105401318 March 2011Units 1 & 2, Request for Additional Information Regarding Cyber Security Plans Based on Nuclear Energy Institute 08-09, Revision 6Cyber Security
ML1106304274 March 2011Annual Assessment Letter for the Browns Ferry Nuclear Plant Unit 1 (IR 05000259,260,296-11-001)
ML1106304414 March 2011Inspection/Activity Plan 03/01/2011 - 06/30/2012
ML1106702252 March 2011Core Operating Limits Report for Cycle 17 OperationShutdown Margin
Coast down
ML1106106412 March 2011NRC Report 05000259/2010005, 05000260/2010005, and 05000296/2010005; Preliminary Greater than Green Finding Browns Ferry Nuclear PlantSafe Shutdown
Reactor Vessel Water Level
Mission time
Fire Barrier
Weld Overlay
Internal Flooding
Past operability
Nondestructive Examination
Temporary Modification
Condition Adverse to Quality
Tornado Generated Missile
Significance Determination Process
Job Performance Measure
Foreign Material Exclusion
Liquid penetrant
Fire Watch
Power change
Downpower
ML11046049628 February 2011Safety Evaluation for Relief Request 1-ISI-26, Risk-Informed Inservice Inspection Program.Probabilistic Risk Assessment
Incorporated by reference
ML11059005528 February 2011ANP-2988NP, Revision 0, Browns Ferry Nuclear Plant, Unit 1, Areva Fuel Transition Input to TVA for Rais, Enclosure 3Shutdown Margin
Anticipated operational occurrence
Power change
ML11061073728 February 2011Tennessee Valley Authority - Fitness for Duty Annual Program Performance Data, January Through December 2010Fitness for Duty
TAC:ME579925 February 2011
ML11061073825 February 2011Submittal of Report in Accordance with 10 CFR 26.719(c)(1) for Drug and Alcohol Testing ErrorsFitness for Duty
ML11060040825 February 2011Technical Specification Change TS-429 - Deletion of Low Pressure Coolant Injection Motor-Generator SetsSafe Shutdown
Abnormal operational transient
TAC:ME579625 February 2011
ML11061073924 February 2011Information Related to the Safety Significance of the Apparent Violation Concerning Failure of Unit 1 Residual Heat Removal System Low Pressure Injection ValveSafe Shutdown
Finite Element Analysis
Significance Determination Process
ML11059005423 February 2011Response to NRC Request for Additional Information Regarding Amendment Request to Transition to Areva FuelShutdown Margin
Incorporated by reference
ML11055064622 February 2011American Society of Mechanical Engineers Section Xl, Inservice Inspection, System Pressure Test, Containment Inservice Inspection, and Repair and Replacement Programs - Owner'S Activity Report for Cycle 8 Operation
ML11048088817 February 2011Revised - Browns Ferry Nuclear Power Plant - Operator Licensing Written Examination Approval 05000259/2011301, 05000260/2011301 and 05000296/2011301
ML11048055117 February 2011Acceptance Review Results for Relief Request 3-ISI-25
ML11048005415 February 2011Notification of Potential Part 21 Reportable Condition: Crack Indications in Marathon Control Rod Blades
ML11046048715 February 2011Notification of Potential Part 21 Reportable Condition Re Design Life of D and s Lattice Marathon Control Blades
ML11046045515 February 2011Notification of Inspection and Request for InformationNondestructive Examination
ML11047040614 February 2011Service List Change Update