Issue date | Title | Topic | |
---|---|---|---|
ML091070228 | 31 December 2008 | Guidance for Post Fire Safe Shutdown Circuit Analysis | Hot Short Safe Shutdown Shutdown Margin Fire Barrier Probabilistic Risk Assessment Coatings Operator Manual Action Multiple Spurious Operation Emergency Lighting Significance Determination Process Thermoset Large early release frequency Exemption Request Earthquake Chernobyl Fuel cladding Biofouling Fire Protection Program |
ML090210376 | 30 December 2008 | December 2008 OL Exam (SRO Exam with Answers) | Half scram Hydrostatic Squib Abnormal operational transient Foreign Material Exclusion Scram Discharge Volume Severe Accident Management Guideline Overtravel |
Press Release-II-08-056, NRC Staff to Meet with TVA to Discuss Inspection of Browns Ferry Nuclear Power Plant | 30 December 2008 | Press Release-II-08-056: NRC Staff to Meet with TVA to Discuss Inspection of Browns Ferry Nuclear Power Plant | |
IR 05000259/2008007 | 22 December 2008 | IR 05000259-08-07, 05000260-08-007 and 05000296-08-007 on 9/29/2008 - 10/24/2008, Browns Ferry Nuclear Plant, Units 1, 2 and 3, Biennial Inspection of the Identification and Resolution of Problems | Anchor Darling Significance Determination Process Operability Determination |
ML083650109 | 22 December 2008 | Technical Specifications Change 463-T, One-time Extension of Surveillance Requirements (Srs) | Shutdown Margin Reactor Vessel Water Level Anticipated operational occurrence Post Accident Monitoring Hydrostatic Incorporated by reference Scram Discharge Volume Feedwater Controller Failure Fuel cladding |
ML083650227 | 19 December 2008 | Response for Additional Information Regarding Units 1, 2 and 3 - Technical Specifications Change 444 - Adoption of Changes to Standard Technical Specifications Under Technical Specification Task Force Change Number 448, Revision 3. | Safe Shutdown |
ML083650113 | 19 December 2008 | Core Operating Limits Report (Colr), Revision 1 for Cycle 8 Operation | Shutdown Margin |
ML091810100 | 19 December 2008 | Initial Exam 2008-302 Post Exam Comments | |
ML090210362 | 18 December 2008 | December 2008 OL Exam (RO Exam with Answers) | Half scram Hydrostatic Squib Foreign Material Exclusion Scram Discharge Volume Severe Accident Management Guideline Overtravel |
ML083530937 | 18 December 2008 | Notice of Public Meeting with Browns Ferry Nuclear Plant to Discuss the Results from IP 95002 Inspection Performed During the Week of December 1, 2008 | |
ML083530619 | 15 December 2008 | Technical Specifications Change TS-431 - Extended Power Uprate - Response to Round 22 Request for Additional Information - Unit 1 Large Transient Testing (Ltt) - | |
ML083390526 | 12 December 2008 | Verbal Relief'S Related to Instrument Line Weld Overlay (TAC MD0155 & MD0172) (1-ISI-21 and 1-ISI-22) | Weld Overlay Hydrostatic Nondestructive Examination Through-Wall Leak Through Wall Leak |
ML083460021 | 8 December 2008 | Technical Specifications Changes TS-418 and TS-431 - Extended Power Uprate - Response to Request for Additional Information Regarding Withholding Information from Public Disclosure | |
ML083440224 | 5 December 2008 | Units 1 & 2 - Tva'S Nuclear Quality Assurance Plan (TVA-NQA-PLN89-A) | Fitness for Duty Offsite Dose Calculation Manual Safe Shutdown Earthquake Coatings Nondestructive Examination B.5.b Process Control Program Fire Protection Program |
ML083450065 | 5 December 2008 | Unit 1 - Technical Specifications (TS) Change TS-446 - Safety Limit Minimum Critical Power Ratio (SLMCPR) - Cycle 8 Operation - Response to Request for Additional Information (RAI) | Minimum Critical Power Ratio |
ML083400324 | 5 December 2008 | Dec Exam 05000259, 260, 296-08-302 Approval ML083400324 | |
ML083030220 | 2 December 2008 | Summary of October 14, 2008, Meeting with Tennessee Valley Authority Regarding Steam Dryer Portion of the Extended Power Uprate Review (TAC Nos. MD5262 and MD5263) | |
ML091810105 | 1 December 2008 | Initial Exam 2008-302 Final Administrative Documents | Job Performance Measure |
ML083250115 | 30 November 2008 | CDI Report No. 08-20NP, Stress Assessment of Browns Ferry Nuclear Unit 2 Steam Dryer with Outer Hood and Tie-Bar Reinforcements Revision 0, Cover Page - Page 38 | Finite Element Analysis Liquid penetrant |
ML083460022 | 30 November 2008 | Enclosure 2 - Browns Ferry, Units 1, 2, & 3 - Technical Specifications Changes TS-418 and TS-431 - Extended Power Uprate - CDI Report 07-11NP, Revision 1, Dynamics of BWR Steam Dryer Components, Non-Proprietary Version | Finite Element Analysis |
ML083250116 | 30 November 2008 | CDI Report No. 08-20NP, Stress Assessment of Browns Ferry Nuclear Unit 2 Steam Dryer with Outer Hood and Tie-Bar Reinforcements Revision 0, Page 39 - End | |
ML083360196 | 26 November 2008 | Unit 1 - American Society of Mechanical Engineers (ASME) Section XI, Inservice Inspection Program for the Second Ten-Year Inspection Interval - Request for Relief 1-ISI-21 - Resubmittal | Weld Overlay Nondestructive Examination |
TAC:ME0172 | 26 November 2008 | ||
TAC:MD9356 | 26 November 2008 | ||
ML082800326 | 26 November 2008 | Tennessee Valley Authority - Decommissioning Funding Status Report - Browns Ferry (Bfn), Sequoyah (SQN) and Watts Bar (WBN) Nuclear Plants | |
ML083400030 | 25 November 2008 | American Society of Mechanical Engineers Section XI, Inservice Inspection Program for the Second Ten-Year Inspection Interval - Request for Relief 1-ISI-21 | Weld Overlay Nondestructive Examination |
ML083380201 | 25 November 2008 | American Society of Mechanical Engineers (ASME) Section XI, Inservice Inspection Program for the Second Ten-year Inspection Interval - Relief Request for 1-ISI-22 | Weld Overlay Hydrostatic VT-2 Through-Wall Leak Through Wall Leak |
TAC:ME0155 | 25 November 2008 | ||
TAC:MD8794 | 24 November 2008 | ||
ML083290387 | 24 November 2008 | Review of the Summary Report for Updated Final Safety Analysis Report Changes | |
ML083330187 | 21 November 2008 | Notification of Potential Part 21 Re Tyco Electronics, Transfer of Information - CII-012 | |
ML083300545 | 20 November 2008 | (BFN) Units 1, 2, & 3 - Technical Specifications (TS) Change 462 - Request for Adoption of TSTF-475 Revision 1 of Control Rod Notch Surveillance Test Frequency and a Clarification of a Frequency Example Using the Consolidated Line | |
ML082760583 | 17 November 2008 | Summary of July 18, 2008, Meeting with Tennessee Valley Authority Regarding Steam Dryer Portion of the Extended Power Uprate Review | |
ML083150424 | 17 November 2008 | Request for Withholding Information from Public Disclosure for Browns Ferry Nuclear Plant | |
ML083250114 | 14 November 2008 | (BFN) - Units 1, 2, & 3 - Technical Specifications (TS) Changes TS-418 & TS-431 - Extended Power Uprate (EPU) - Supplemental Response to Rounds 19 and 22 Request for Additional Information (RAI) Regarding Steam Dryers. | |
ML083240224 | 14 November 2008 | Technical Specifications Changes TS-431 & TS-418 - Extended Power Uprate (EPU) - Correction to Schedule Letter Regarding EPU | |
ML083250083 | 14 November 2008 | (BFN) - Units 1, 2, and 3 - Technical Specifications (TS) Changes TS-418 and TS-431 - Extended Power Uprate (EPU) - Steam Dryer Reports | |
ML083120045 | 12 November 2008 | Request for Additional Information for Extended Power Uprate - Round 22 (TAC Nos. MD5262 and MD5263) (TS-431 and TS-418) | Finite Element Analysis |
TAC:MD9564 | 12 November 2008 | ||
ML083190040 | 11 November 2008 | Core Operating Limits Report (Colr), for Cycle 8 Operation | Shutdown Margin |
ML083090404 | 6 November 2008 | RAI Regarding a Revision to the Minimum Critical Power Ratio | Safety Limit Minimum Critical Power Ratio |
ML083100003 | 6 November 2008 | Request for Withholding Information from Public Disclosure for Browns Ferry Nuclear Plant | |
ML083100241 | 6 November 2008 | Request for Withholding Information from Public Disclosure | |
ML083250084 | 31 October 2008 | CDI Report No. 08-05NP, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Browns Ferry Nuclear Unit 2 Steam Dryer to 250 Hz, Revision 3. | |
ML083250085 | 31 October 2008 | CDI Report No. 08-14NP, Flow-Induced Vibration in the Main Steam Lines at Browns Ferry Nuclear Units 1 and 2, with and Without Acoustic Side Branches, and Resulting Steam Dryer Loads Revision 0. | Finite Element Analysis Flow Induced Vibration |
ML083120307 | 31 October 2008 | Technical Specifications (TS) Changes TS-418 and TS-431, Extended Power Uprate (EPU) - Supplemental Response to Round 19 Request for Additional Information & Response to Round 22 Rai'S Regarding Steam Dryers | Finite Element Analysis |
ML083250090 | 31 October 2008 | CDI Report No. 08-15NP Stress Assessment of Browns Ferry Nuclear Unit 1 Steam Dryer with Tie-Bar Modifications Revision 2, Page 38 - End | |
ML083260034 | 31 October 2008 | CDI Report No. 08-04NP, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Browns Ferry Nuclear Unit 1 Steam Dryer to 250 Hz, Revision 2. | |
ML083250086 | 31 October 2008 | CDI Report No. 08-15NP Stress Assessment of Browns Ferry Nuclear Unit 1 Steam Dryer with Tie-Bar Modifications Revision 2, Cover Page - Page 37 | Finite Element Analysis Liquid penetrant |
ML083120308 | 30 October 2008 | Calculation Package 0006982.304, Extended Power Uprate Main Steam Line Strain Gauge Vibration Monitoring. | Finite Element Analysis |