Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
TAC:MD243528 December 2006
TAC:MD381128 December 2006
L-PI-07-003, Core Operating Limits Report (COLR) for Prairie Island Unit 2 Cycle 24, Revision 128 December 2006Core Operating Limits Report (COLR) for Prairie Island Unit 2 Cycle 24, Revision 1Shutdown Margin
L-HU-06-037, Supplement to Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity27 December 2006Supplement to Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity
L-PI-06-103, Steam Generator Category C-3 Inspection Results 30-Day Report26 December 2006Steam Generator Category C-3 Inspection Results 30-Day ReportBoric Acid
L-PI-06-099, Transmittal of Core Operating Limits Report (COLR) for Prairie Island Unit 2 Cycle 24, Revision 026 December 2006Transmittal of Core Operating Limits Report (COLR) for Prairie Island Unit 2 Cycle 24, Revision 0Shutdown Margin
L-PI-06-092, Supplement to License Amendment Request (LAR) to Incorporate Large Break Loss of Coolant Accident (LOCA) Analyses Using the Automated Statistical Treatment of Uncertainty Method26 December 2006Supplement to License Amendment Request (LAR) to Incorporate Large Break Loss of Coolant Accident (LOCA) Analyses Using the Automated Statistical Treatment of Uncertainty Method
ML06346025821 December 2006Alternative Approach for Responding to the Nuclear Regulatory Commission Request for Additional Information Letter Regarding Generic Letter 2004-02 (Docket Nos.: See Enclosure)
L-PI-06-078, Response to Additional Request for Additional Information on 2005 Prairie Island Unit 2 Steam Generator Reports21 December 2006Response to Additional Request for Additional Information on 2005 Prairie Island Unit 2 Steam Generator Reports
TAC:MD271721 December 2006
ML06354043320 December 2006Enclosure 2 - Consent and Hearing Waiver Form - the Nuclear Management Company, LLC
TAC:MB984318 December 2006
L-PI-06-101, Supplemental Response to Generic Letter 2003-01, Control Room Habitability.18 December 2006Supplemental Response to Generic Letter 2003-01, Control Room Habitability.
L-PI-06-102, Unit 2 Steam Generator Inspection Results - 15 Day Report18 December 2006Unit 2 Steam Generator Inspection Results - 15 Day Report
ML06347059914 December 2006Plant Service List
ML06334009914 December 2006Summary of November 21, 2006, Category 1 Pre-Application Meeting with Nuclear Management Company, LLC (Nmc), Regarding License Renewal Application, Fuel Transition, and Measurement Uncertainty Recapture Uprate (TAC Nos. MD3447 and MD3448)
L-PI-06-058, License Amendment Request (LAR) to Revise Technical Specifications (TS) in Support of Containment Sump Resolution14 December 2006License Amendment Request (LAR) to Revise Technical Specifications (TS) in Support of Containment Sump Resolution
L-PI-06-096, CFR 50.55a Requests 1-RR-4-7 and 2-RR-4-7 for the Units 1 and 2 Fourth 10-Year Interval Inservice Inspection Program14 December 2006CFR 50.55a Requests 1-RR-4-7 and 2-RR-4-7 for the Units 1 and 2 Fourth 10-Year Interval Inservice Inspection ProgramWeld Overlay
VT-2
Through-Wall Leak
ML06346044013 December 2006Response Date for Request for Additional Information Regarding Resolution of Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power (TAC Nos. MD0947 Through MD1050)
ML0634003257 December 2006Notice of Presubmittal Conference for Proposed Emergency Plan Changes
ML0634701677 December 2006Staff Review Comments on Security Plan Rev. 1
ML0633803175 December 2006Enclosure 1 - Addressee List
ML07009029927 November 20062R24 Outage Slides
ML06326014221 November 200611/21/2006 Informational Meeting Regarding Prairie Island License Renewal ApplicationPower change
TAC:MC786216 November 2006
ML06313018016 November 2006Bulletin 2005-02, Emergency Preparedness
ML06312051516 November 2006Telephone Conference to Discuss the Results of the Steam Generator Inspection During Upcoming Refueling Outage
TAC:MD344116 November 2006
ML06325004114 November 2006Tech Spec Pages for Amendments 175 and 165 Regarding Technical Specification Requirements for Surveillance Requirements for Installed Spare Components and Miscellaneous Corrections
ML06319014814 November 2006Note to File 11/06/2006 Conference Call with Transnuclear, Inc
ML06292032314 November 2006License Amendments 175 and 165 Regarding Technical Specification Requirements for Surveillance Requirements for Installed Spare Components and Miscellaneous Corrections, (TAC Nos. MC8874 & MC8875)Safe Shutdown
Anticipated operational occurrence
Offsite Circuit
TAC:MC887414 November 2006
IR 05000282/20060049 November 2006IR 05000282-06-004; 05000306-06-004; 07/01/06 - 09/30/06; Prairie Island Nuclear Generating Plant, Units 1 and 2, Inservice Inspection, Operability Evaluations, ALARA Planning and ControlsPacking leak
High Radiation Area
Fire Barrier
Hydrostatic
Temporary Modification
Condition Adverse to Quality
Significance Determination Process
Operability Determination
Exemption Request
Maintenance Rule Program
Fire Protection Program
Dissimilar Metal Weld
Substantial potential for overexposure
Overexposure
ML0631700259 November 2006TSTF 449 SG Tube Integrity LAR - MD0209/MD0210
TAC:MD34473 November 2006
ML0630603043 November 200611/21/2006 Notice of Forthcoming Pre-Application Meeting with NMC Regarding Prairie Island License Renewal
ML0630600073 November 2006Branch Chief Letter
ML0629901713 November 2006Safety Evaluation for Administrative Changes to the Technical Specifications
L-PI-06-077, Supplement to License Amendment Request for Extension of Technical Specification 3.8.1, AC Sources-Operating, Emergency Diesel Generator Completion Time30 October 2006Supplement to License Amendment Request for Extension of Technical Specification 3.8.1, AC Sources-Operating, Emergency Diesel Generator Completion TimeProbabilistic Risk Assessment
IR 05000282/200640126 October 2006IR 05000282-06-401; 05000306-06-401; 09/25/2006 - 09/28/2006; Prairie Island Nuclear Generating Plant; Routine Security Baseline InspectionSignificance Determination Process
Affidavit
ML07031035825 October 2006Comments on TSTF449 Amendment
IR 05000282/200600923 October 2006IR 05000282-06-009 (Drs); 05000306-06-009 (Drs); 07/31/06 - 08/18/06; Prairie Island Nuclear Generating Plant, Units 1 and 2; Triennial Fire Protection Baseline Inspection, NFPA 805 - Enforcement Discretion ExercisedSafe Shutdown
Fire Barrier
Enforcement Discretion
Emergency Lighting
Significance Determination Process
Fire Protection Program
Hourly Fire Watch
ML06272029220 October 2006Summary of September 21, 2006, Category 1 Meeting with Nuclear Management Company, LLC (Nmc), to Discuss Extension of Completion Time for Emergency Diesel Generators
ML07137029820 October 2006Offsite Dose Calculation Manual H4, Rev 20Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Process Control Program
TAC:MD312320 October 2006
ML06276044520 October 2006Extension of Relief Requests 2 & 3 for Fourth 10-Year Inservice Testing Program Interval
ML06290003720 October 2006Summary of 09/21/2006 Teleconference Re Extension of Relief Requests 2 & 3 for the Fourth 10-Year Inservice Testing Program Interval
TAC:MD949213 October 2006
ML0628300224 October 2006E-mail, SG Program (TSTF-449) LARNondestructive Examination
ML0624000052 October 2006License Amendments 174 and 164 Regarding One-Time Extension of Containment Integrated Leakage Rate Test IntervalProbabilistic Risk Assessment
Large early release frequency
Moisture barrier