Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
RIS 2003-08, Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure | 30 April 2003 7 November 2005 3 April 2008 | Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure Summary of Safeguards Information Requirements, Attachment 1 to NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure | Backfit |
RIS 2003-08, Protection of Safeguards Information from Unauthorized Disclosure | 30 April 2003 7 November 2005 3 April 2008 | Protection of Safeguards Information from Unauthorized Disclosure 2005/04/30-NRC Regulatory Issue Summary 2003-08 Protection of Safeguards Information from Unauthorized Disclosure Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure Summary of Safeguards Information Requirements, Attachment 1 to NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure | Backfit |
ML071581019 | 31 December 2006 | Effluent Release Data 01/01/2006 - 12/31/2006 | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report |
ML071410228 | 31 December 2006 | Transmittal of 2006 Annual Radiological Environmental Operating Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Chernobyl |
ML063460258 | 21 December 2006 | Alternative Approach for Responding to the Nuclear Regulatory Commission Request for Additional Information Letter Regarding Generic Letter 2004-02 (Docket Nos.: See Enclosure) | |
ML063620092 | 20 December 2006 | Appeal of Final Significance Determination for White Finding and Reply to Notice of Violation; EA-06-199 | Safe Shutdown Probabilistic Risk Assessment Significance Determination Process Maintenance Rule Program |
ML071150220 | 19 December 2006 | 2 Part E-Mail Between R. Pedersen, Dpopm, and M. Shannon, Rii, Subject: Action: DPO-2006-002 Comments | |
IR 05000269/2006018 | 19 December 2006 | Notice of Public Meeting to Discuss the Risk Significance of the Inspection Finding Documented in Inspection Report 05000269, 270, 287/200618 | Foreign Material Exclusion |
ML070030383 | 19 December 2006 | NFPA 805 Transition Pilot Plant FAQ 06-0017 | |
ML071150219 | 18 December 2006 | Resolution Schedule for DPOs 2006-002 and 2006-003 | |
ML063470599 | 14 December 2006 | Plant Service List | |
ML063460440 | 13 December 2006 | Response Date for Request for Additional Information Regarding Resolution of Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power (TAC Nos. MD0947 Through MD1050) | |
ML070080325 | 13 December 2006 | Licensee'S Handouts for Oconee, Summary of December 13, and 14, 2006 | Reactor Vessel Water Level Anticipated operational occurrence Cyber Security License Renewal Commercial Grade Manual Operator Action Dedication package |
ML063530433 | 13 December 2006 | Protection System Digital Replacement Project: Technical Discussions for Selected Safety System Topics | |
ML070080416 | 12 December 2006 | Licensee Handouts for Oconee, Summary of December 12, 2006 Meeting | |
TAC:MD3682 | 11 December 2006 | ||
ML063320389 | 11 December 2006 | Approval to Use More Recent Inservice Testing Requirements. | Incorporated by reference |
ML063530369 | 8 December 2006 | Affidavit for Meeting Handout | Exclusive Use Affidavit |
ML063470042 | 6 December 2006 | Duke Power Company LLC, D/B/A Duke Energy Carolinas, LLC, Oconee Nuclear Station - Technical Specification Bases (Tsb) Change | Safe Shutdown Tornado Missile Probabilistic Risk Assessment Battery sizing License Renewal |
ML063470137 | 6 December 2006 | Technical Specification Bases (Tsb) Change | Safe Shutdown Boric Acid Reactor Vessel Water Level Post Accident Monitoring Commercial Grade |
ML063380317 | 5 December 2006 | Enclosure 1 - Addressee List | |
TAC:MD1006 | 5 December 2006 | ||
ML063450128 | 4 December 2006 | Comment (17) of Bryan J. Dolan on Behalf of Duke Power Co Re Draft Regulatory Guide, DG-1164, Meteorological Monitoring Programs for Nuclear Power Plants. | |
ML071290286 | 4 December 2006 | Email from J. Dyer, NRR, to R. Pedersen, Dpopm, Subject: Office Director Comments on DPO-2006-003 Panel Report | |
TAC:MD2130 | 30 November 2006 | ||
ML070290328 | 30 November 2006 | Tornado/Helb Mitigation Strategies and Regulatory Commitments | Safe Shutdown Shutdown Margin Mission time Tornado Missile Probabilistic Risk Assessment Operating Basis Earthquake Tornado-Generated Missile Tornado Missile Protection TORMIS Earthquake Liquid penetrant GOTHIC Thermal fatigue |
TAC:MD2129 | 30 November 2006 | ||
ML063340044 | 30 November 2006 | 12/13-14/2006 Notice of Meeting with Duke Power Company, Llc. to Discuss the Future License Amendment Request for a Digital Upgrade to Reactor Protective System and Engineered Safeguards Protective System (Rps/Esps) | |
ML063320222 | 30 November 2006 | Forthcoming Meeting with Duke Power Company LLC, to Discuss the Use of Fiber-Reinforced Polymer | |
TAC:MD3746 | 30 November 2006 | ||
TAC:MD3721 | 30 November 2006 | ||
ML063450131 | 30 November 2006 | Fourth Ten-Year Inservice Inspection Interval Request for Alternate (Relief Request 2004-ON-001) | Hydrostatic |
ML063110611 | 29 November 2006 | Response to Bulletin (Bl) 2005-02, Emergency Preparedness and Response Actions for Security-Based Events for Oconee Units 1, 2, and 3.(TAC Nos MC7849 and MC7850 | |
TAC:MC7848 | 29 November 2006 | ||
ML062340490 | 28 November 2006 | Meeting Summary, Spring 2006 Steam Generator Inspection | |
ML063410220 | 27 November 2006 | Relief Request 06-ON-004 | Weld Overlay Nondestructive Examination Stress corrosion cracking Dissimilar Metal Weld |
ML063420150 | 27 November 2006 | Inservice Testing (IST) Program Fourth 10 Year Program Interval Use of Subsequent Code Edition | Incorporated by reference |
IR 05000269/2006017 | 22 November 2006 | IR 05000269-06-017, IR 05000270-06-017, and IR 05000287-06-017, Final Significance Determination for a White Finding and Notice of Violation, Duke Energy Carolinas, LLC | Probabilistic Risk Assessment Significance Determination Process Fuel cladding Preliminary White Finding |
ML071290325 | 22 November 2006 | Email from M. Shannon, R11, to R. Pedersen, Dpopm, Subject: Action: Review DPO-2006-003 Report | |
ML063240383 | 20 November 2006 | NRC Inspection Report 05000269, 270, 287/2006018 Preliminary Greater than Green Finding - Attachments Removed | Significance Determination Process Foreign Material Exclusion |
IR 05000269/2006008 | 20 November 2006 | IR 05000269-06-008, 05000270-06-008, and 05000287-06-008, Safeguards Information Removed | Affidavit |
ML071150218 | 18 November 2006 | DPO-2006-002: DPO Milestones and Timeliness Goals | |
ML063200195 | 17 November 2006 | EN-06-055, Oconee Nuclear Station (Duke Power Company, LLC) | Significance Determination Process |
ML063210217 | 15 November 2006 | Comment (2) Submitted by Duke Energy, Bryan J. Dolan, on Supplemental Proposed Rules PR-2, 50, 51, and 52, Regarding Licenses, Certifications, and Approvals for Nuclear Power Plants | |
ML063200171 | 15 November 2006 | Reply to Notice of Violation EA-06-080 | |
ML071290283 | 13 November 2006 | DPO Panel Report-Memo to J. Dyer, NRR, from J. Grobe, Ades/Nrr, Subject: DPO Panel Response to DPO-2006-002 | Internal Flooding |
ML063190227 | 9 November 2006 | Change in Legal Counsel | |
ML071290255 | 8 November 2006 | Memo to R. Pedersen, Dpopm, from L. Reyes, EDO, Subject: Approved Extension Request for DPOs 2006-002 and 2006-003 | |
ML071150215 | 7 November 2006 | Memo to L. Reyes, EDO, from R. Pedersen, Dpopm, Subject: Extension Request for DPOs 2006-002 and 2006-003, (Encl. 1-DPO-2006-002: DPO Milestones and Timeliness Goals, Encl. 2-DPO-2006-003: DPO Milestones and Timeliness Goals, Encl. 3.. | |
ML063120422 | 2 November 2006 | CFR 21 Notification - Identification of Defect Problem Investigation Process No.: O-03-4686 | Operability Determination |