ML23193A856 | 28 June 2023 | Submittal of Updates to the Final Safety Analysis Reports | |
ML23193A857 | 28 June 2023 | 8 to Defueled Safety Analysis Report, Redacted | Safe Shutdown Grab sample Offsite Dose Calculation Manual Fire Barrier Tornado Missile Safe Shutdown Earthquake Post Accident Monitoring Hydrostatic Operating Basis Earthquake Incorporated by reference Tornado-Generated Missile Earthquake Continuous fire watch Fire Protection Program GOTHIC Exclusive Use |
ML23193A858 | 28 June 2023 | 8 to Defueled Safety Analysis Report, Drawings Incorporated by Reference | Incorporated by reference |
ML23193A859 | 28 June 2023 | 8 to Defueled Safety Analysis Report, Technical Requirements Manual | Fire Barrier Hydrostatic Maintenance Rule Program Continuous fire watch Fire Protection Program Fire Watch |
ML23193A865 | 28 June 2023 | 1 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Anticipated operational occurrence Weld Overlay Hydrostatic Reserve Station Service Transformer Nondestructive Examination Incorporated by reference Design basis earthquake Earthquake Fuel cladding Liquid penetrant Dissimilar Metal Weld Power change |
ML23193A866 | 28 June 2023 | 1 to Updated Final Safety Analysis Report, Drawings Incorporated by Reference - Redacted | Boric Acid Loop seal Incorporated by reference FLEX |
ML23193A867 | 28 June 2023 | 1 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control | Safe Shutdown Boric Acid Health Physics Network Shutdown Margin Grab sample Fire Barrier Stroke time Anticipated operational occurrence Reserve Station Service Transformer Design basis earthquake Fuel cladding Failure to Scram |
ML23193A868 | 28 June 2023 | 1 to Updated Final Safety Analysis Report, Chapter 3, Reactor | Boric Acid Shutdown Margin Anticipated operational occurrence Weld Overlay Hydrostatic Operating Basis Earthquake Design basis earthquake Earthquake Fuel cladding Power change Flow Induced Vibration |
ML23193A869 | 28 June 2023 | 1 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems | Safe Shutdown Unanalyzed Condition Boric Acid Fire Barrier Safe Shutdown Earthquake Reserve Station Service Transformer Operator Manual Action Emergency Lighting Surveillance Frequency Control Program Open Phase Condition Design basis earthquake Earthquake |
ML23193A870 | 28 June 2023 | 1 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features Systems | Safe Shutdown Boric Acid Shutdown Margin Loop seal Safe Shutdown Earthquake Weld Overlay FLEX Design basis earthquake Earthquake Power-Operated Valves Power Operated Valves Dissimilar Metal Weld |
ML23193A871 | 28 June 2023 | 1 to Updated Final Safety Analysis Report, Chapter 5, Structures | Hot Short Safe Shutdown Stroke time Tornado Missile Safe Shutdown Earthquake Hydrostatic Coatings Operating Basis Earthquake Nondestructive Examination Finite Element Analysis Tornado Generated Missile Seismically rugged Tornado Missile Protection Design basis earthquake Earthquake Turbine Missile Liquid penetrant |
ML23193A872 | 28 June 2023 | 1 to Updated Final Safety Analysis Report, Chapter 2, Site and Environment | Safe Shutdown Offsite Dose Calculation Manual Hydrostatic Tornado Missile Protection Design basis earthquake Annual Radiological Environmental Operating Report Frazil ice Earthquake |
ML23193A873 | 28 June 2023 | 1 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System | Safe Shutdown Loop seal Stroke time Excess Flow Check Valve Power change |
ML23193A874 | 28 June 2023 | 1 to Updated Final Safety Analysis Report, Chapter 4, Reactor Coolant System | Safe Shutdown Boric Acid Shutdown Margin Hydrostatic Operating Basis Earthquake Design basis earthquake Earthquake Fuel cladding Liquid penetrant Power change Flow Induced Vibration Coast down |
ML23193A875 | 28 June 2023 | 1 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Processing and Radiation Protection Systems | Boric Acid Offsite Dose Calculation Manual Anticipated operational occurrence Annual Radiological Effluent Release Report Fuel cladding |
ML23193A876 | 28 June 2023 | 1 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems | Hot Short Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Grab sample Fire Barrier Tornado Missile Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Emergency Lighting FLEX Design basis earthquake License Renewal Exemption Request Earthquake Control of Heavy Loads Fuel cladding Biofouling Liquid penetrant Fire Protection Program Fire Watch Power change |
ML23193A877 | 28 June 2023 | 1 to Updated Final Safety Analysis Report, Chapter 15, License Renewal | Boric Acid Coatings Aging Management Severe Accident Management Guideline License Renewal Biofouling Fire Protection Program Dissimilar Metal Weld |
ML23193A878 | 28 June 2023 | 1 to Updated Final Safety Analysis Report, Chapter 13, Initial Tests and Operation | Boric Acid Shutdown Margin Hydrostatic Reserve Station Service Transformer Test box Coast down |
ML23193A879 | 28 June 2023 | Technical Requirements Manual (Incorporated by Reference) Including Change No. 185 | Safe Shutdown Boric Acid Time of Discovery Shutdown Margin Fire Barrier Stroke time Hydrostatic Emergency Lighting Functionality Assessment Incorporated by reference Large early release frequency Operability Determination Severe Accident Management Guideline Pressure Boundary Leakage Continuous fire watch Fire Protection Program Fire Watch Downpower |
ML23193A880 | 28 June 2023 | 1 to Updated Final Safety Analysis Report, Chapter 14, Safety Analysis | Boric Acid Shutdown Margin Loop seal Stroke time Anticipated operational occurrence Fuel cladding Coast down GOTHIC |
ML23193A881 | 28 June 2023 | 1 to Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations | Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Incorporated by reference Fire Protection Program |
ML23193A882 | 28 June 2023 | 1 to Updated Final Safety Analysis Report, Frontmatter | Boric Acid Shutdown Margin Loop seal Tornado Missile Operating Basis Earthquake Incorporated by reference Aging Management Design basis earthquake License Renewal Earthquake |
ML23193A883 | 28 June 2023 | 6 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management | Boric Acid Offsite Dose Calculation Manual Anticipated operational occurrence Hydrostatic Annual Radioactive Effluent Release Report Fuel cladding |
ML23193A884 | 28 June 2023 | 6 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses | Boric Acid Shutdown Margin Loop seal Emergency Lighting Design basis earthquake Fuel cladding Coast down Power Uprate Measurement Uncertainty Recapture Failure to Scram |
ML23193A885 | 28 June 2023 | 6 to Updated Final Safety Analysis Report, Chapter 7, Instruments and Controls | Safe Shutdown Boric Acid Shutdown Margin Anticipated operational occurrence Water Inventory Control Post Accident Monitoring Surveillance Frequency Control Program Earthquake Fuel cladding Power change Stretch Power Uprate |
ML23193A886 | 28 June 2023 | 6 to Updated Final Safety Analysis Report, Chapter 18, Human Factors Engineering | |
ML23193A887 | 28 June 2023 | 6 to Updated Final Safety Analysis Report, Chapter 4, Reactor | Boric Acid Shutdown Margin Reactor Vessel Water Level Anticipated operational occurrence Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Nondestructive Examination Thermoset Fuel cladding Power change Flow Induced Vibration |
ML23193A888 | 28 June 2023 | 6 to Updated Final Safety Analysis Report, Chapter 8, Electric Power | Safe Shutdown Fire Barrier Anticipated operational occurrence Tornado Missile Reserve Station Service Transformer Operator Manual Action Emergency Lighting FLEX Tornado Generated Missile Surveillance Frequency Control Program Open Phase Condition Battery sizing Earthquake |
ML23193A889 | 28 June 2023 | 6 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection | Boric Acid High Radiation Area Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Tornado Missile Protection Backfit Overexposure |
ML23193A890 | 28 June 2023 | 6 to Updated Final Safety Analysis Report, Frontmatter | Safe Shutdown Boric Acid Non-Destructive Examination Stroke time Anticipated operational occurrence Safe Shutdown Earthquake Reserve Station Service Transformer Nondestructive Examination Incorporated by reference Aging Management Tornado Missile Protection Surveillance Frequency Control Program License Renewal Earthquake Fuel cladding |
ML23193A891 | 28 June 2023 | 6 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary System | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Grab sample Tornado Missile Safe Shutdown Earthquake Hydrostatic Coatings Operating Basis Earthquake Emergency Lighting FLEX TORMIS License Renewal Earthquake Control of Heavy Loads Power-Operated Valves Biofouling Fire Protection Program Unidentified leakage Siren Exit Sign |
ML23193A893 | 28 June 2023 | Technical Requirements Manual | Safe Shutdown Boric Acid Time of Discovery Shutdown Margin High Radiation Area Fire Barrier Stroke time Hydrostatic Emergency Lighting Functionality Assessment Incorporated by reference Large early release frequency Operability Determination Severe Accident Management Guideline Earthquake Pressure Boundary Leakage Recently irradiated fuel Continuous fire watch Fire Protection Program Fire Watch Hourly Fire Watch Early Warning Fire Detection Downpower Coast down Power Uprate Measurement Uncertainty Recapture |
ML23193A894 | 28 June 2023 | 6 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems | Safe Shutdown Boric Acid Shutdown Margin Loop seal Ultimate heat sink Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Internal Flooding Hydrostatic Coatings Reserve Station Service Transformer Operating Basis Earthquake Emergency Lighting Finite Element Analysis Tornado-Generated Missile Tornado Generated Missile Tornado Missile Protection Earthquake Turbine Missile Pressure Boundary Leakage Through-Wall Leakage Backfit Power change Flow Induced Vibration Stretch Power Uprate |
ML23193A895 | 28 June 2023 | 6 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System | Safe Shutdown Boric Acid Loop seal Fire Barrier Tornado Missile Internal Flooding Probabilistic Risk Assessment FLEX TORMIS Earthquake Biofouling Fire Protection Program |
ML23193A896 | 28 June 2023 | 6 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems | Hot Short Safe Shutdown Boric Acid Shutdown Margin Loop seal Packing leak Non-Destructive Examination Anticipated operational occurrence Safe Shutdown Earthquake Weld Overlay Hydrostatic Operating Basis Earthquake Nondestructive Examination Design basis earthquake Earthquake Liquid penetrant Pressure Boundary Leakage Power change Flow Induced Vibration Unidentified leakage Power Uprate |
ML23193A897 | 28 June 2023 | 6 to Updated Final Safety Analysis Report, Fire Protection Evaluation Report | Hot Short Safe Shutdown Boric Acid Ultimate heat sink Fire Barrier Safe Shutdown Earthquake Hydrostatic Coatings Emergency Lighting Earthquake Fire Protection Program Early Warning Fire Detection Scaffolding Backfit Stretch Power Uprate Exit Sign |
ML23193A898 | 28 June 2023 | 6 to Updated Final Safety Analysis Report, Drawing Incorporated by Reference | Incorporated by reference FLEX |