Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML19164A00128 June 2019Issuance of Amendment No. 254 Regarding Revision of Technical Specification 3/4.7.4, Ultimate Heat Sink,Safe Shutdown
Ultimate heat sink
Mission time
Tornado Missile
Probabilistic Risk Assessment
Met Tower
Surveillance Frequency Control Program
IR 05000382/201901028 June 2019Unit - Design Basis Assurance Inspection (Programs) Inspection Report 05000382/2019010
W3F1-2019-0045, Updated Reply to a Notice of Violation; NRC Inspection Report 05000382/201800820 June 2019Updated Reply to a Notice of Violation; NRC Inspection Report 05000382/2018008Commercial Grade Dedication
Significance Determination Process
W3F1-2019-0041, Submittal of Owner'S Activity Report Form for Lnservice Inspection Performed During Operating Cycle 22 / Refuel 2213 June 2019Submittal of Owner'S Activity Report Form for Lnservice Inspection Performed During Operating Cycle 22 / Refuel 22Weld Overlay
ML19157A31612 June 2019Authorization of Proposed Alternative to ASME Code Case N-770-2VT-2
Dissimilar Metal Weld
IR 05000382/20194106 June 2019NRC Security Baseline Inspection Report 05000382/2019410Cyber Security
ML19156A2575 June 2019Response to Reply to Notice of Violation EA-18-020 SupplementFLEX
ML19151A6104 June 2019Non-Proprietary Second Round RAI Regarding License Amendment Request for Use of the Tranflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Internal Components
W3F1-2019-0042, SR-2019-001-00 for Waterford Steam Electric Station, Unit 3 (Waterford 3), Condenser Vacuum Pump High Range Instrument Inoperable for Greater than 7 Days3 June 2019SR-2019-001-00 for Waterford Steam Electric Station, Unit 3 (Waterford 3), Condenser Vacuum Pump High Range Instrument Inoperable for Greater than 7 Days
ML19172A08524 May 2019NRR E-mail Capture - Waterford 3 - Final Request for Additional Information (Rais) Re Relief Request W3-ISI-032: Volumetric Examination RequirementsDM weld
W3F1-2019-0033, (Waterford 3) - Reply to Notice of Violation EA-18-020 Supplement17 May 2019(Waterford 3) - Reply to Notice of Violation EA-18-020 SupplementBoric Acid
FLEX
Significance Determination Process
Spent Fuel Pool Instrumentation
W3F1-2019-0034, Letter-of-Intent to Submit License Amendment Requesting Using Digital Instrumentation and Control Interim Staff Guidance-(ISG)-06, Revision 2 and Request for NRC Fee Waiver16 May 2019Letter-of-Intent to Submit License Amendment Requesting Using Digital Instrumentation and Control Interim Staff Guidance-(ISG)-06, Revision 2 and Request for NRC Fee Waiver
ML19135A66415 May 2019Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations
ML14224A3563 May 2019Letter to All Holders of Licenses for Operating Power Reactors - Rescission of Certain Power Reactor Security Orders Applicable to Nuclear Power Plants
IR 05000382/201900130 April 2019NRC Integrated Inspection Report 05000382/2019001Boric Acid
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Stroke time
Weld Overlay
Enforcement Discretion
Coatings
Nondestructive Examination
Temporary Modification
VT-2
Functionality Assessment
Significance Determination Process
Local Leak Rate Testing
Integrated leak rate test
Operability Determination
Moisture barrier
Maintenance Rule Program
Liquid penetrant
Fire Protection Program
Dissimilar Metal Weld
Scaffolding
Power change
Operational leakage
Thermal fatigue
W3F1-2019-0001, Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule25 April 2019Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule
W3F1-2019-0028, (Waterford 3) - Annual Radiological Environmental Operating Report - 201825 April 2019(Waterford 3) - Annual Radiological Environmental Operating Report - 2018Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
Chernobyl
W3F1-2019-0029, Submittal of Annual Radioactive Effluent Release Report 201825 April 2019Submittal of Annual Radioactive Effluent Release Report 2018Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Process Control Program
Tritium
ML19113A29525 April 2019Notification of Inspection (NRC Inspection Report 05000382/2019003 and Request for Information
W3F1-2019-0027, Annual Report of Individual Monitoring of Radiation Exposure (Reirs) for 2018 Per 10CFR20.22069 April 2019Annual Report of Individual Monitoring of Radiation Exposure (Reirs) for 2018 Per 10CFR20.2206
IR 05000382/20180105 April 2019Notice of Violation; NRC Inspection Report 05000382/2018010 and Investigation Report 4-2017-022
IR 05000313/20190144 April 2019NRC Confirmatory Order (EA 17 132 and EA 17-153) Follow-Up Inspection Report 05000416/2019012; Arkansas Nuclear One, Units 1 and 2-Nrc Confirmatory Order (EA 17 132 and Ea-17-153) Follow-Up Inspection Report 05000313/2019014Fire Watch
ML19094B0783 April 2019Entergy - Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart GSafe Shutdown
Non-Destructive Examination
Coatings
Temporary Modification
Process Control Program
Fire Protection Program
Grace period