Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
GNRO-2017/00039, Steam Dryer Visual Inspection Results for the First Two Scheduled Refueling Outages30 June 2017Steam Dryer Visual Inspection Results for the First Two Scheduled Refueling Outages
GNRO-2017/00045, Request for Severe Accident Management Guidelines (Samgs) Commitment Schedule Relaxation29 June 2017Request for Severe Accident Management Guidelines (Samgs) Commitment Schedule RelaxationSevere Accident Management Guideline
CAC:MF991128 June 2017
ML17179A26928 June 2017Assessment Follow-Up Letter for Grand Gulf Nuclear StationPower change
GNRO-2017/00035, Notice of Readiness of 95001 Supplemental Inspection28 June 2017Notice of Readiness of 95001 Supplemental Inspection
GNRO-2017/00040, Request to Use a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI, for Repair / Replacement Activities in Accordance with 10CFR50.55a(g)(4)(iv)28 June 2017Request to Use a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI, for Repair / Replacement Activities in Accordance with 10CFR50.55a(g)(4)(iv)Nondestructive Examination
VT-2
Through-Wall Leakage
GNRO-2017/00038, Focused Evaluation of External Flooding27 June 2017Focused Evaluation of External FloodingFLEX
Fukushima Dai-Ichi
Time Critical Operator Action
Flooding Focused Evaluation
CAC:MF974926 June 2017
ML17177A07526 June 2017NRR E-mail Capture - Grand Gulf - Acceptance Review of Relief Requests PRR-GGNS-2017-1, PRR-GGNS-2017-2, and PRR-GGNS-2017-3, Jockey Pumps
IR 05000416/201730121 June 2017NRC Examination Report 05000416/2017301Job Performance Measure
ML17186A07615 June 2017After Action Report/Improvement Plan, Exercise Date - March 29, 2017, Radiological Emergency Preparedness (REP) Program
GNRO-2017/00041, NRC Form 536 Response to Regulatory Issue Summary 2017-0314 June 2017NRC Form 536 Response to Regulatory Issue Summary 2017-03Generic Fundamentals Examination
ML17166A03314 June 2017NRR E-mail Capture - Grand Gulf - Acceptance Review of Relief Request Associated with Fourth Interval Inservice Inspection
ML17116A0327 June 2017Grand Gulf Nuclear Station, Unit 1 - Issuance of Amendment No. 212 to Adopt Technical Specifications Task Force-427, Allowance For Non-Technical Specification Barrier Degradation on Supported System Operability (CAC No. MF8692.)
ML17150A2565 June 2017Entergy Fleet - 2017 Onsite Insurance Submittal Review for Entergy Operations, Inc., and Entergy Nuclear Operations, Inc. (CAC No. TM3058)
IR 05000416/20170082 June 2017NRC Triennial Fire Protection Inspection Report 05000416/2017008Hot Short
Safe Shutdown
Fire Barrier
Multiple Spurious Operation
Emergency Lighting
Significance Determination Process
Large early release frequency
Fire Protection Program
Power Uprate
GNRO-2017/00017, Three Relief Requests for Jockey Pumps for the Third 10-year Inservice Testing Interval25 May 2017Three Relief Requests for Jockey Pumps for the Third 10-year Inservice Testing Interval
GNRO-2017/00034, Proposed Alternative Request for Forth Interval Inservice Inspection Program25 May 2017Proposed Alternative Request for Forth Interval Inservice Inspection Program
CAC:MF975225 May 2017
ML17142A25819 May 2017Notification of NRC Design Bases Assurance Inspection (05000416/2017007) and Initial Request for InformationUltimate heat sink
Temporary Modification
IR 05000416/201701016 May 2017NRC Team Inspection Report 05000416/2017010FLEX
Spent Fuel Pool Instrumentation
IR 05000416/201700115 May 2017NRC Integrated Inspection Report 05000416/2017001Safe Shutdown
High winds
High Radiation Area
Hydrostatic
Temporary Modification
Functionality Assessment
Locked High Radiation Area
FLEX
Significance Determination Process
Open Phase Condition
Operability Determination
Fire Protection Program
Power change
Downpower
Overexposure
ML17135A42612 May 2017Notification of NRC Initial Operator Licensing Examination 05000416/2017302
GNRO-2017/00031, NRC Form 536 Response to Regulatory Issue Summary 2017-034 May 2017NRC Form 536 Response to Regulatory Issue Summary 2017-03Generic Fundamentals Examination
ML17125A3173 May 2017NRR E-mail Capture - Grand Gulf - Acceptance Review of License Amendment Request Associated with One Cycle Extension of Appendix J Type a ILRT and Drywell Bypass Test Interval
ML17123A1013 May 2017Notification of Inspection (NRC Inspection Report (05000416/2017003) and Request for Information
ML17121A00327 April 2017NRR E-mail Capture - Grand Gulf - Acceptance Review of License Amendment Request for Administrative Change to Licensee Name
GNRO-2017/00028, Annual Radioactive Effluent Release Report (Arerr)For 201627 April 2017Annual Radioactive Effluent Release Report (Arerr)For 2016Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
GNRO-2017/00029, Annual Radiological Environmental Operating Report27 April 2017Annual Radiological Environmental Operating ReportOffsite Dose Calculation Manual
Fukushima Dai-Ichi
Annual Radiological Environmental Operating Report
Earthquake
Chernobyl
GNRO-2017/00027, Entergy Operations Inc. Intent to Submit a License Amendment Request to Implement Tornado Missile Risk Evaluator and Request for Pilot Plant Status26 April 2017Entergy Operations Inc. Intent to Submit a License Amendment Request to Implement Tornado Missile Risk Evaluator and Request for Pilot Plant StatusTornado Generated Missile
Tornado Missile Protection
Tornado Missile Risk Evaluator
CAC:MF967726 April 2017
GNRO-2017/00025, Annual Report of Individual Monitoring - NRC Form 5 for 2016 Per 10 CFR 20.220625 April 2017Annual Report of Individual Monitoring - NRC Form 5 for 2016 Per 10 CFR 20.2206
GNRO-2017/00023, Notification of Deviation from BWRVIP-4124 April 2017Notification of Deviation from BWRVIP-41
ML17101A57911 April 2017NRR E-mail Capture - Grand Gulf Nuclear Station - Acceptance Review of Proposed Alternative Relief Request GG-ISI-020 to Use BWRVIP Guidelines
ML17101A44011 April 2017Summary of Public Meeting with Entergy Operations, Inc. to Discuss Results of the Annual Assessment of Safety Performance at Grand Gulf Nuclear Station for 2016Power change
ML17101A73811 April 2017Response to Request for Component Design Basis Inspection Extension
ML17109A48710 April 2017Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart GSafe Shutdown
Non-Destructive Examination
Coatings
Temporary Modification
Process Control Program
Fire Protection Program
Grace period