GNRO-2017/00023, Notification of Deviation from BWRVIP-41

From kanterella
Jump to navigation Jump to search
Notification of Deviation from BWRVIP-41
ML17114A479
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 04/24/2017
From: Nadeau J
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GNRO-2017/00023
Download: ML17114A479 (4)


Text

.-

~Entergy Entergy Operations, Inc.

P.o. Box 756 Port Gibson, MS 39150 James Nadeau Manager, Regulatory Assurance Grand Gulf Nuclear Station Tel. (601) 437-2103 GNRO-2017/00023 April 24, 2017 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Notification of Deviation from BWRVIP-41 Grand Gulf Nuclear Station, Unit 1 Docket No. 50-416 License No. NPF-29

Dear Sir or Madam:

This letter provides notification of a deviation from the Boiling Water Reactor Vessel and Internals Project (BWRVIP) guidelines for Grand Gulf Nuclear Station (GGNS). This is a deviation from the performance of inspection in accordance with the guidance provided in BWRVIP-41, Revision 3, "BWR Vessel and Internals Project, BWR Jet Pump Assembly Inspection and Flaw Evaluation Guidelines," (EPRI Report 1021000, September 2010).

This is a deviation from a "needed" element of the BWRVIP program to perform inspections in accordance with the guidance of BWRVIP-41, Revision 3. This document provides the requirement for periodic inspection of the primary riser brace leaf to vessel pad weld (RB-1 locations). The execution of this inspection requirement was not completed within the required periodicity. The missed inspection requirement has been scheduled to be completed at the next available opportunity, Refueling Outage 21 (2018).

The deviation from BWRVIP-41, Revision 3, guidelines has been reviewed and approved in accordance with Entergy procedures and NEI 03-08 guidance. This is a notification of deviation only and no action is being requested from the NRC.

The attachment to this letter provides the regulatory commitment made in this submittal.

If you have any questions or require additional information, please contact Greg Phillips at 601-437-2266.

SinCereIY(J~~

JJN/sas Attachment 1: List of Regulatory Commitments

GNRO-2017/00023 1

Page 2 of 2 cc: U.S. Nuclear Regulatory Commission ATTN: Mr. Siva Lingham Mail Stop OWFN 8 B1 Rockville, MD 20852-2738 U.S. Nuclear Regulatory Commission ATTN: Mr. Kriss M. Kennedy (w/2)

Regional Administrator, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Mr. B. J. Smith (w/2)

Director, Division of Radiological Health Mississippi State Department of Health Division of Radiological Health 3150 Lawson Street Jackson, MS 39213 NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150 to GNRO 2017/00023 List Regulatory Commitments

GNRO-2017/00023 Page 1 of 1

. **.:*..**.*:}:* * $¢:~:~D.J(j~Q*** **. *. * *.; **..*

    • .*~~~~~~~~~~d .f~M.R~E~J8~I[)~"[E**
'((l;>' ;>< * *.**.**.i/>}':: .1 j':i.;~:*<.;::.:~.If:,~~qHi~~;~)";: ',

GNNS will complete the remaining RB-1, Jet Pump Assembly, weld inspections to meet the RF-21 25% sampling requirement of BWRVIP-41, R3, by the completion of Refueling Outage 21 (2018)