Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML11181A182 | 30 June 2011 | Ltr. 06/30/2011 Fermi Re Summary of the 06/22/2011 Non-Public Meeting to Discuss End-of-Cycle Security Performance for Calendar Year 2010 | |
NRC-11-0036, Enrico Fermi Atomic Power Plant, Unit 1 - License Termination Plan, Revision 4 | 29 June 2011 | Enrico Fermi Atomic Power Plant, Unit 1 - License Termination Plan, Revision 4 | Fire Barrier Coatings |
NRC-11-0018, Enrico Fermi Atomic Power Plant, Unit 1 - Fermi 1 Groundwater Site Conceptual Model | 29 June 2011 | Enrico Fermi Atomic Power Plant, Unit 1 - Fermi 1 Groundwater Site Conceptual Model | |
ML11166A134 | 22 June 2011 | Meeting Summary with the Beyond Nuclear Petitioners Regarding Their 2.206 Petition to Suspend Operating Licenses (Ols) of General Electric (GE) Boiling Water Reactors (Bwrs) Mark I (Bwrs) | |
NRC-11-0034, Response to Request for Additional Information Regarding Fermi 2 2011 Biennial Decommissioning Funding Report | 15 June 2011 | Response to Request for Additional Information Regarding Fermi 2 2011 Biennial Decommissioning Funding Report | |
NRC-11-0029, Day Response to NRC Bulletin 2011-01: Mitigating Strategies | 10 June 2011 | Day Response to NRC Bulletin 2011-01: Mitigating Strategies | B.5.b Mitigating Strategies |
ML11167A114 | 8 June 2011 | Transcript of 10 CFR 2.206 Petition Review Board Conference Call Re GE Mark 1 Bwrs, June 08, 2011, Pages 1-74 | Earthquake Hardened vent Chernobyl Backfit |
IR 05000341/2011009 | 7 June 2011 | IR 05000341-11-009 (DRS) on 03/22/2011 - 04/29/2011; Fermi Power Plant, Unit 2; Routine Triennial Fire Protection Baseline Inspection | Hot Short Safe Shutdown Reactor Vessel Water Level Fire Barrier Operator Manual Action Emergency Lighting B.5.b Significance Determination Process B.5.b Mitigating Strategies Fire Protection Program Hourly Fire Watch |
IR 05000341/2011012 | 7 June 2011 | B.5.b | |
ML11158A116 | 7 June 2011 | Ltr. 06/07/11 Fermi 2011-012-Cover Letter | B.5.b Mitigating Strategies |
ML11154A096 | 1 June 2011 | Ltr. 06/01/2011 Fermi Re Confirmation of Initial Operator License Examinations | |
ML111460552 | 26 May 2011 | Summary of May 23, 2011, Open House Public Meeting to Discuss NRC Activities, Nuclear Power Issues, and the 2010 EOC Performance Assessment | Open House |
NL-11-0041, Letter from Fermi 2 to Michigan Department of State Police, 05-25-11 | 25 May 2011 | Letter from Fermi 2 to Michigan Department of State Police, 05-25-11 | |
ML111290359 | 23 May 2011 | Scheduler Exemption from Certain Requirements of 10 CFR Part 73, Section 73.55 | Cyber Security Exemption Request |
TAC:ME5918 | 23 May 2011 | ||
ML111380104 | 19 May 2011 | Request for Additional Information Regarding 2011 Biennial Decommissioning Funding Reports | |
NRC-11-0028, Submittal of Nuclear Liability Insurance Endorsement | 18 May 2011 | Submittal of Nuclear Liability Insurance Endorsement | |
ML111360307 | 16 May 2011 | FFD | Fitness for Duty |
IR 05000341/2011011 | 13 May 2011 | IR 05000341-11-011, on 03/23/2011 - 04/29/2011, Fermi Power Plant, Unit 2, Temporary Instruction 2515/183 - Followup to the Fukushima Daiichi Nuclear Station Fuel Damage Event | High Radiation Area Hydrostatic Seismically rugged Design basis earthquake Severe Accident Management Guideline B.5.b Mitigating Strategies Earthquake |
ML11133A378 | 13 May 2011 | Ltr. 05/13/2011 Fermi Re Non-Public Meeting to Discuss the 2010 End-of-Cycle Plant Security Performance Assessment | |
ML11126A096 | 12 May 2011 | Notice of Meeting with Petitioner Requesting Action Under 10CFR2.206 Regarding Immediate Suspension of Operating Licenses of General Electric Mark 1 Boiling Water Reactors | |
Press Release-III-11-017, NRC Schedules Open House for May 23 to Discuss Fermi Nuclear Power Plant Performance and NRC Oversight | 11 May 2011 | Press Release-III-11-017: NRC Schedules Open House for May 23 to Discuss Fermi Nuclear Power Plant Performance and NRC Oversight | Open House |
ML111300510 | 10 May 2011 | ME5483 - 2011 Biennial Decommissioning Funding Reports - Request for Additional Information | |
ML110980538 | 9 May 2011 | Cyber Security Plan Implementation Schedule | Cyber Security |
NRC-11-0025, Transmittal of Cycle 15 Core Operating Limits Report, Revision 1 | 5 May 2011 | Transmittal of Cycle 15 Core Operating Limits Report, Revision 1 | Safety Limit Minimum Critical Power Ratio Abnormal operational transient MELLLA Fuel cladding |
IR 05000341/2011002 | 2 May 2011 | IR 05000341-11-002, on 01/01/2011 - 03/31/2011, Fermi Power Plant, Unit 2, Routine Integrated, Maintenance Effectiveness, Outage Activities, Identification and Resolution of Findings | Ultimate heat sink Water Inventory Control Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Temporary Modification Significance Determination Process Fire Protection Program Scaffolding Backfit Downpower |
NRC-11-0022, Notification of Deviation from BWRVIP-25 Guidelines | 2 May 2011 | Notification of Deviation from BWRVIP-25 Guidelines | Safe Shutdown EVT-1 |
NRC-2010-0131, Brief of Nuclear Energy Institute as Amicus Curiae in Opposition to the Emergency Petition to Suspend All Pending Reactor Licensing Decisions and Related Rulemaking Decisions | 2 May 2011 | Brief of Nuclear Energy Institute as Amicus Curiae in Opposition to the Emergency Petition to Suspend All Pending Reactor Licensing Decisions and Related Rulemaking Decisions | Probabilistic Risk Assessment Design basis earthquake License Renewal Earthquake Chernobyl Affidavit |
ML11168A132 | 2 May 2011 | Revision 101 to Technical Requirements Manual, Volume I and Revision 1 to Core Operating Limits Report, Cycle 15 | Abnormal operational transient Minimum Critical Power Ratio MELLLA Fuel cladding |
NRC-14-0073, Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 - Part 4 of 5 | 30 April 2011 | Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 - Part 4 of 5 | |
NRC-14-0073, Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 - Part 1 of 5 | 30 April 2011 | Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 - Part 1 of 5 | |
ML14344B008 | 30 April 2011 | Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 - Part 5 of 5 | |
ML14344B007 | 30 April 2011 | Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 - Part 3 of 5 | FLEX |
ML14344B005 | 30 April 2011 | Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 - Part 1 of 5 | |
ML14344B006 | 30 April 2011 | Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 - Part 2 of 5 | |
NRC-14-0073, Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 - Part 2 of 5 | 30 April 2011 | Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 - Part 2 of 5 | |
NRC-14-0073, Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 - Part 3 of 5 | 30 April 2011 | Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 - Part 3 of 5 | FLEX |
NRC-14-0073, Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 - Part 5 of 5 | 30 April 2011 | Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 - Part 5 of 5 | |
NRC-11-0010, Submittal of 2010 Safety Relief Valve Challenge Report, Main Steam Bypass Line Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report | 29 April 2011 | Submittal of 2010 Safety Relief Valve Challenge Report, Main Steam Bypass Line Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report | |
NRC-11-0016, Annual Radiological Environmental Operating Report, Radioactive Effluent Release Report and Revised Offsite Dose Calculation Manual | 28 April 2011 | Annual Radiological Environmental Operating Report, Radioactive Effluent Release Report and Revised Offsite Dose Calculation Manual | Time of Discovery Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Chernobyl Fuel cladding Tritium Power change |
NRC-11-0023, Submittal of Annual Non-Radiological Environmental Operating Report | 27 April 2011 | Submittal of Annual Non-Radiological Environmental Operating Report | Zebra Mussel |
ML111170407 | 26 April 2011 | Open House EOC Meeting Letter to Licensee | Open House |
NRC-11-0024, 10 CFR 20.2206 Report of Individual Monitoring | 26 April 2011 | 10 CFR 20.2206 Report of Individual Monitoring | |
ML111170418 | 26 April 2011 | Meeting Notice for Open House to Discuss NRC Activities, Nuclear Power Issues, and 2010 EOC Performance Assessment Re Fermi 2 | Open House |
ML111150551 | 21 April 2011 | LIC-109 Acceptance - Fermi 2 - ME6015 - LAR for Adoption of TSTF-514, Rev. 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation | |
IR 05000016/2011010 | 20 April 2011 | IR 05000016-11-10 on 04/07/2011 for Fermi, Unit 1, Routine Decommissioning Inspection Included Reviews of Facility Management and Control, and Radiological Safety | |
ML111050535 | 12 April 2011 | FEMA, Submittal of Revision to the Fermi 2 Nuclear Power Plant (Fnpp) Emergency Preparedness Booklet (Epb) for 2010-2011 | |
NRC-11-0013, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation. | 8 April 2011 | License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation. | Grab sample Pressure Boundary Leakage |
TAC:ME6015 | 8 April 2011 | ||
ML110840205 | 7 April 2011 | Closeout of Generic Letter 2008-01 Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems. |