Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML11195A025 | 30 June 2011 | to Topical Report, D.C. Cook Unit 2 Post-LOCA Long Term Cooling Boron Precipitation Reanalysis Licensing Report Text. | Boric Acid |
AEP-NRC-2011-41, Updated Boric Acid Precipitation Analysis for Recirculation Phase of a Postulated Large-Break Loss-of-Coolant Accident | 30 June 2011 | Updated Boric Acid Precipitation Analysis for Recirculation Phase of a Postulated Large-Break Loss-of-Coolant Accident | Boric Acid |
ML11188A146 | 29 June 2011 | Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition. Without Attachments C, E, G, I & W | Hot Short Safe Shutdown Boric Acid Shutdown Margin Reactor Vessel Water Level Mission time Fire Barrier Time to boil Safe Shutdown Earthquake Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Coatings Fire impairment Operator Manual Action Multiple Spurious Operation Emergency Lighting B.5.b Thermoset Design basis earthquake Large early release frequency Exemption Request Earthquake Power-Operated Valves Fuel cladding Continuous fire watch Fire Protection Program Fire Watch Early Warning Fire Detection |
IR 05000315/2011404 | 27 June 2011 | IR 05000315-11-404, (Drs), IR 05000316-11-404, (Drs), on 05/16/2011 - 05/20/2011, D. C. Cook Nuclear Power Plant, Units 1 and 2, Routine Security Baseline Inspection - Cover Letter Only | Affidavit |
IR 05000315/2011008 | 23 June 2011 | IR 05000315-11-008; 05000316-11-008; 05/02/2011 05/20/2011; D. C. Cook Nuclear Power Plant, Units 1 and 2; Routine Biennial Problem Identification and Resolution Inspection | Condition Adverse to Quality Maintenance Rule Program |
ML111640263 | 16 June 2011 | EOC NRC Slides for Meeting | |
AEP-NRC-2011-35, Errors in Containment Backpressure Calculation in Large Break Loss-of-Coolant Accident Analysis | 16 June 2011 | Errors in Containment Backpressure Calculation in Large Break Loss-of-Coolant Accident Analysis | |
AEP-NRC-2011-36, 30-Day Response to NRC Bulletin 2011-01, Mitigating Strategies | 9 June 2011 | 30-Day Response to NRC Bulletin 2011-01, Mitigating Strategies | B.5.b Mitigating Strategies |
TAC:ME6422 | 9 June 2011 | ||
ML11129A242 | 8 June 2011 | Summary of Meeting with Indiana Michigan Power Company to Discuss Issues Related to a Future Submittal Using NFPA 805 | Enforcement Discretion |
AEP-NRC-2011-34, Response to Request for Information Regarding the Decommissioning Funding Status Report | 7 June 2011 | Response to Request for Information Regarding the Decommissioning Funding Status Report | |
AEP-NRC-2011-19, Commitment Change Notification for Steam Generator Bolting Inspection | 6 June 2011 | Commitment Change Notification for Steam Generator Bolting Inspection | |
TAC:ME2304 | 6 June 2011 | ||
Press Release-III-11-021, NRC Schedules Open House for June 16 to Discuss D. C. Cook Nuclear Power Plant Performance and NRC Oversight | 3 June 2011 | Press Release-III-11-021: NRC Schedules Open House for June 16 to Discuss D. C. Cook Nuclear Power Plant Performance and NRC Oversight | Open House |
ML11112A123 | 1 June 2011 | Issuance of Amendment No 314 and 298 to Units 1 and 2 Containment Spray Nozzle Surveillance | Boric Acid Foreign Material Exclusion Fire Protection Program |
ML11157A110 | 1 June 2011 | Ltr. 06/01/2011 D. C. Cook Re Confirmation of Initial Operator License Examinations | |
ML111460627 | 26 May 2011 | Found 4/8/11 Request for ISI Relief Acceptable for Review | |
ML111450889 | 25 May 2011 | Changing a Schedule Conveyed by a Letter Dated 2/24/11 in Support of a Proposed Amendment Regarding the Large-break LOCA Analysis | |
ML111390701 | 19 May 2011 | D. C. Cook Errata for Units 1 and 2 NRC Temporary Instruction 2515/183 Inspection Report 05000315/2011011; 05000316/2011011 | |
AEP-NRC-2011-31, Disposition of Temp-Mat Fibrous Insulation in Units 1 and 2 Containments with Respect to Generic Letter 2004-02 Concerns | 19 May 2011 | Disposition of Temp-Mat Fibrous Insulation in Units 1 and 2 Containments with Respect to Generic Letter 2004-02 Concerns | |
ML111390334 | 18 May 2011 | Notice of Meeting to Discuss NRC End-Of-Cycle Assessment of D.C. Cook Plant Performance for 2010 Calendar Year and the Agency'S Reactor Oversight Process with the Public | |
ML111390325 | 18 May 2011 | Notice of Public Meeting/Open House to Discuss NRC Activities, Nuclear Power Issues, and 2010 End-Of-Cycle Performance Assessment for D.C. Cook Nuclear Power Plant | |
IR 05000315/2011011 | 13 May 2011 | IR 05000315-11-011, on 05000316/2011011, 03/23/2011 - 04/29/2011; D. C. Cook Nuclear Power Plant Temporary Instruction 2515/183 - Followup to the Fukushima Daiichi Nuclear Station Fuel Damage Event | Boric Acid Internal Flooding B.5.b Design basis earthquake Severe Accident Management Guideline Time Critical Operator Action Earthquake |
AEP-NRC-2011-32, Annual Radiological Environmental Operating Report | 13 May 2011 | Annual Radiological Environmental Operating Report | Annual Radiological Environmental Operating Report Process Control Program |
ML111320302 | 13 May 2011 | IR 05000315-11-011, on 05000316/2011011, 03/23/2011 - 04/29/2011; D. C. Cook Nuclear Power Plant Temporary Instruction 2515/183 - Followup to the Fukushima Daiichi Nuclear Station Fuel Damage Event | Boric Acid Internal Flooding Design basis earthquake Severe Accident Management Guideline Time Critical Operator Action B.5.b Mitigating Strategies Earthquake |
ML111320346 | 12 May 2011 | Found D.C. Cook'S 05/03/11 Application for Amendment Acceptable for Review | |
ML110980538 | 9 May 2011 | Cyber Security Plan Implementation Schedule | Cyber Security |
ML111290302 | 9 May 2011 | Draft RAI Re. the 2011 Decommissioning Funding Status Report | |
ML111290322 | 6 May 2011 | Slides for the 5/10/11 Meeting to Discuss Pre-application Issues Concerning Use of NFPA-805 (Fire Protection) | Enforcement Discretion |
AEP-NRC-2011-28, License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-513, Revision 3, Revise PWR Operability Requirements and Action for RCS Leakage Instrumentation | 3 May 2011 | License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-513, Revision 3, Revise PWR Operability Requirements and Action for RCS Leakage Instrumentation | Grab sample Pressure Boundary Leakage |
TAC:ME6159 | 3 May 2011 | ||
AEP-NRC-2011-27, Annual Radioactive Effluent Release Report, January 1, 2010, Through December 31, 2010 | 29 April 2011 | Annual Radioactive Effluent Release Report, January 1, 2010, Through December 31, 2010 | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Downpower |
ML111190406 | 29 April 2011 | E-mail Regarding D.C Cook - Proposed Amendment Per TSTF-495 Acceptable for Review | |
ML11115A001 | 26 April 2011 | Notice of Forthcoming Meeting with Indiana Michigan Power Company to Discuss Pre-Application Issues Related to the Future Amendment to Transition to NFPA 805, Performance-Based Fire Protection | |
TAC:ME6083 | 26 April 2011 | ||
AEP-NRC-2011-33, Response to Order EA-11-039 | 26 April 2011 | Response to Order EA-11-039 | |
IR 05000315/2011002 | 21 April 2011 | IR 05000315-11-002, 05000316-11-002, on 01/01/2011 - 03/31/2011, D. C. Cook Nuclear Power Plant, Units 1 & 2, Routine Integrated Inspection | Internal Flooding Hydrostatic Probabilistic Risk Assessment Temporary Modification Deep Dose Equivalent Fire Protection Program Operability Assessment Overexposure |
IR 05000315/2011009 | 20 April 2011 | IR 05000315-11-009; 05000316-11-009; on 03/21/2011 - 04/08/2011; D. C. Cook Nuclear Power Plant; Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications | |
ML11083A033 | 12 April 2011 | Withholding from Public Disclosure, Westinghouse Reports, D.C. Cook Unit 2 (AMP) Post-LOCA Responses to Request for Additional Information (Rai), & Supplemental Information to Support Informal NRC Audit of 12 ... | |
AEP-NRC-2011-18, Response to Request for Information Regarding a License Amendment Request for Approval of the Cyber Security Plan | 8 April 2011 | Response to Request for Information Regarding a License Amendment Request for Approval of the Cyber Security Plan | Cyber Security Incorporated by reference |
AEP-NRC-2011-23, Relief Requests for Limited Coverage Examinations Performed in the Third 10-Year Inspection Interval | 8 April 2011 | Relief Requests for Limited Coverage Examinations Performed in the Third 10-Year Inspection Interval | |
TAC:ME6087 | 8 April 2011 |