Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML103210023 | 30 June 2009 | Arpi System Upgrade, Cerpi System Requirements Specification (Nonproprietary), WNS-DS-00001-WBT-NP, Revision 2, Dated June 2009, Attachment 5 | |
ML091800453 | 29 June 2009 | Meeting Announcement - Category 2 Public Meeting, 2009 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Development Workshop | License Renewal |
ML091810046 | 26 June 2009 | Tennessee Valley Authority - Submittal of Report in Accordance with 10 CFR 26.719 (c)(1) for Drug and Alcohol Testing Errors | |
ML091740467 | 24 June 2009 | Notice of Meeting with Tennessee Valley Authority (TVA) Regarding Future Watts Bar Unit 2 Submittals | |
ML091760986 | 24 June 2009 | Public Meeting Slides, Safety Evaluation Report Review | |
ML091750643 | 24 June 2009 | Order of the Secretary (Granting Southern Alliance for Clean Energy'S Request for Extension of Time) | |
ML091740225 | 23 June 2009 | Initial Exam 2009-301 Final SRO Written Exam with References | Safe Shutdown Time of Discovery Shutdown Margin High Radiation Area Locked High Radiation Area Condition Adverse to Quality Fuel cladding Pressure Boundary Leakage Continuous fire watch Fire Watch |
ML091740220 | 23 June 2009 | Initial Exam 2009-301 Final RO Written Exam with References | Safe Shutdown Time of Discovery Shutdown Margin High Radiation Area Locked High Radiation Area Condition Adverse to Quality Fuel cladding Pressure Boundary Leakage Continuous fire watch Fire Watch |
ML091740212 | 23 June 2009 | Final SRO Written Exam | |
ML091700402 | 19 June 2009 | Notice of Appearance of David E. Roth on Behal of the NRC Staff in the Matter of TVA | |
IR 05000390/2009402 | 19 June 2009 | IR 05000390-09-402, 05000391-09-402, on 05/15/2009, Watts Bar Nuclear Plant - NRC Security Inspection | Affidavit |
ML091700434 | 19 June 2009 | NRC Staff'S Answer to Southern Alliance for Clean Energy'S Request for Extension of Time to Submit Hearing Request/Petition to Intervene | |
ML091690464 | 18 June 2009 | Notice of Appearance of Edward J. Vigluicci | |
ML091530187 | 18 June 2009 | Tennessee Valley Authority'S Status of Decommissioning Funding Assurance for Watts Bar Nuclear Plant, Unit 1 | |
TAC:ME0567 | 18 June 2009 | ||
ML091690465 | 18 June 2009 | Response of Tennessee Valley Authority to Request for Extension of Time to Submit Hearing Request/Petition to Intervene by Southern Alliance for Clean Energy | |
ML091671861 | 16 June 2009 | Notice of Appearance by Diane Curran on Behalf of Southern Alliance for Clean Energy | |
ML091670518 | 16 June 2009 | Emergency Diesel Generator (EDG) Fuel Oil - Sampling of Storage Tanks - Supplemental Information | |
ML091671862 | 16 June 2009 | Southern Alliance for Clean Energy'S Request for Extension of Time to Submit Hearing Request/Petition to Intervene | |
ML091610638 | 12 June 2009 | Confirmation of Schedule for Submission of Information to Support Operating License Application Review | |
ML091590430 | 9 June 2009 | Notice of Meeting with Tennessee Valley Authority (TVA) to Discuss the Scope of Future Submittals Related to the Mechanical Area | |
ML091610067 | 5 June 2009 | Submittal of Technical Specification Change TS-09-14, Application for Technical Specification Improvement to Extend Completion Time for Action B.1 of TS 3.5.1, Accumulators, Using Consolidated Line Item Improvement Process | Incorporated by reference |
ML091610066 | 5 June 2009 | Unit 1 - Technical Specification Change 09-10 - Request to Correct Logic Connector Between TS 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, Condition I, Actions 1.2.1 and 1.2.2 | Anticipated operational occurrence |
TAC:ME1436 | 5 June 2009 | ||
TAC:ME1435 | 5 June 2009 | ||
TAC:ME1437 | 5 June 2009 | ||
ML091610068 | 5 June 2009 | Change to TS 3.6.3, Containment Isolation Valves, Regarding Position Verification Requirements (TSTF-269-A, TSTF-45-A, and TSTF-440-A) | High Radiation Area |
ML091530389 | 2 June 2009 | NRC Regulatory Issue Summary (RIS) 2008-16 - Preparation and Scheduling of Operator Licensing Examinations | Generic Fundamentals Examination |
ML091530227 | 2 June 2009 | March 04, 2009, Generic Fundamentals Examination Section Region II, Participant Letter | Generic Fundamentals Examination |
ML110831041 | 31 May 2009 | Engineering Evaluation of Hesco Barriers Performance at Fargo, Nd 2009, Wenck File 2283-01, Enclosure 2 | Hydrostatic |
ML091460593 | 26 May 2009 | Wb Exam May 2009-301 Approval Letter 05000390-09-301 | |
ML091400199 | 19 May 2009 | Emergency Diesel Generator (EDG) Fuel Oil - Sampling of Storage Tanks | |
TAC:ME1330 | 19 May 2009 | ||
ML091410284 | 18 May 2009 | Additional Information Regarding Corrective Action Programs | |
ML091280463 | 18 May 2009 | Letter Watts Bar Nuclear Plant, Unit 2 - Project Manager Reassignment | |
ML091320182 | 8 May 2009 | Changes to Distribution Lists for TVA Dockets | |
ML091310178 | 8 May 2009 | Unit 1 - 2008 Annual Nonradiological Environment Operation Report | |
ML091250151 | 8 May 2009 | Public Notice of Receipt of Updated Application for Facility Operating License | |
ML091310168 | 6 May 2009 | Core Operating Limits Report (COLR) for Cycle 9, Revision 1 | Tritium Producing Burnable Absorber Rods |
ML090920506 | 4 May 2009 | Issuance of Amendment Regarding the Maximum Number of Tritium Producing Burnable Assembly Rods in the Reactor Core | Boric Acid |
Press Release-09-080, NRC Announces Opportunity to Request a Hearing on Operating License Application for Watts Bar 2 Nuclear Reactor | 1 May 2009 | Press Release-09-080: NRC Announces Opportunity to Request a Hearing on Operating License Application for Watts Bar 2 Nuclear Reactor | |
ML091400735 | 30 April 2009 | Final Safety Analysis Report (Fsar), Amendment 93, Figure 2.5-549. Sheet 3 of 4 | |
ML091400730 | 30 April 2009 | Final Safety Analysis Report (Fsar), Amendment 93, Figure 2.5-281. Sheet 2 of 2 | |
ML091400733 | 30 April 2009 | Final Safety Analysis Report (Fsar), Amendment 93, Figure 2.5-549. Sheet 1 of 4 | |
ML091400725 | 30 April 2009 | Final Safety Analysis Report (Fsar), Amendment 93, Figure 2.5-3 | |
ML091400728 | 30 April 2009 | Final Safety Analysis Report (Fsar), Amendment 93, Figure 2.5-222 | |
ML091400729 | 30 April 2009 | Final Safety Analysis Report (Fsar), Amendment 93, Figure 2.5-281. Sheet 1 of 2 | |
ML091400646 | 30 April 2009 | Final Safety Analysis Report (Fsar), Amendment 93, Section 7, Instrumentation and Controls Through Figure 7A-6 | Safe Shutdown Boric Acid Shutdown Margin Anticipated operational occurrence Safe Shutdown Earthquake Post Accident Monitoring Operating Basis Earthquake Earthquake Fuel cladding Pressure Boundary Leakage Power change |
ML091400533 | 30 April 2009 | Final Safety Analysis Report (Fsar), Amendment 93, Section 3.8, Design of Category I Structures Through Figure 3.8.4-80 | Safe Shutdown Boric Acid Non-Destructive Examination Tornado Missile Safe Shutdown Earthquake Hydrostatic Coatings Operating Basis Earthquake Nondestructive Examination Finite Element Analysis Tornado-Generated Missile Tornado Generated Missile Tornado Missile Protection Earthquake Liquid penetrant |
ML091400532 | 30 April 2009 | Final Safety Analysis Report (Fsar), Amendment 93, Section 3.6, Protection Against Dynamic Effects Associated with the Postulated Rupture of Piping Through Figure 3.7-45 | Safe Shutdown Boric Acid Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Nondestructive Examination Emergency Lighting Finite Element Analysis Earthquake Liquid penetrant Through-Wall Leak |