ML103210023

From kanterella
Jump to navigation Jump to search
Arpi System Upgrade, Cerpi System Requirements Specification (Nonproprietary), WNS-DS-00001-WBT-NP, Revision 2, Dated June 2009, Attachment 5
ML103210023
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 06/30/2009
From: Meyers T
Westinghouse
To:
Office of Nuclear Reactor Regulation
References
WNS-DS-00001-WBT-NP, Rev 2
Download: ML103210023 (82)


Text

Attachment 5 TVA Letter Dated November 5, 2010 Description of Commitments and Requested Vendor Documents Watts Bar Unit 2 ARPI System Upgrade, "CERPI System Requirements Specification" (Nonproprietary), WNS-DS-00001-WBT-NP, Revision 2, dated June 2009

  • Westinghouse Westinghouse Non-Proprietary Class 3 Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification WNS-DS-00001-WBT-NP, Rev. 2 June 2009 APPROVALS Function Name and Signature Author Timothy S. Meyers*

Senior Engineer, Rod Control Systems.Engineering Reviewer Kenneth A. Morgan*

Senior Engineer, Electro-Mechanical Product Engineering Approver Michael S. Warshafsky*

ProjectManager, RRAS Watts Bar 2 Completion Project, Rod Control Systems Engineering William J. Rosko*

Product Manager, RRAS Watts Bar 2 Completion Project, Rod Control Systems Engineering Andrew P. Drake*

Program Manager, RRAS Watts Bar 2 Completion Project, Safety &

Monitoring Systems

  • Electronically approved records are authenticated in the electronic document management system.

C©"

2009 Westinghouse Electric Company LLC All Rights Reserved

Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification LIST OF CONTRIBUTORS Revision Name and Title 0 Kenneth A. Morgan Senior Engineer, Electro-Mechanical Product Engineering 0 Jenna L. Tyger Editorial Specialist, Technical Writing and Editing Group 2 David W. Dietz III Editorial Specialist, Technical Communications Template Version 2.0 WNS-DS-00001-WBT-NP, Rev. 2 i Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification REVISION HISTORY RECORD OF CHANGES Revision Author Description Completed 0 Timothy S. Meyers Original Issue August 7, 2008 1 Timothy S. Meyers Updated proprietary information September 15, 2008 2 Timothy S. Meyers Updated for system separation See EDMS DOCUMENT TRACEABILITY & COMPLIANCE Created to Support the Following Document(s) Document Number Revision N/A OPEN ITEMS Item Description Status None.

VVNS-DS-00001-WBT-NP, Rev. 2 ii Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification TABLE OF CONTENTS Section Title Page LIST OF CONTRIBUTORS ...................................................................................... i REVISION HISTORY ............................................................................................ ii TABLE OF CONTENTS ....................................................................................... iii LIST OF TABLES ................................................................................................ vii LIST OF FIGURES .................................................................................................... vii ACRONYMS AND TRADEMARKS ............................... viii GLOSSARY OF TERM S ..................................................................................... ix REFERENCES ...................................................................................................... x REQUIREMENTS ................................................................................................ xi SECTION 1 INTRODUCTION ...................................................................................................... 1-1 1.1 PURPOSE .................................................................................................................. 1-1 1.2 SCOPE ............................................................................................................... 1-1 1.3 OVERVIEW ................................................... 1-1 1.3.1 Existing RPI System ................................................................................................ 1-1 1.3.2 CERPI System ...................................................................................................... 1-1 SECTION 2 GENERAL SYSTEM REQUIREM ENTS ................................................................ 2-1 2.1 DESIGN CONSTRA INTS ......................................................................................... 2-1 2.1.1 Physical Layout Constraints ........................................................................................ 2-1 2.1.2 Environmental Constraints ......................................................................................... 2-1 2.1.3 Redundancy Requirements ......................................................................................... 2-1 2.1.4 Retention of PLC Data ............................................................. 2-2

.2.2 SYSTEM PERFORMANCE REQUIREMENTS ............................. 2-2 2.2.1 System Accuracy Requirements ............................................................................. 2-*2 2.2.1.1 Total System Accuracy Error Terms ....................................................................... 2-2.2.1.2 System Error Budget A llowances ............................................................................... 2-3 2.2.2 System Throughput Requirements .............................................................................. 2-3 SECTION 3 DETECTOR INTERFACE CIRCUITRY REQUIREMENTS ................................... 3-1 3.1 DETECTOR INTERFACE CIRCUITRY FUNCTIONAL REQUIREMENTS ........ 3-1 3 .1.1 G en era l ............................................................................................... ........................ 3-1 3.1.2 Detector Interface Board ............................................................................................. 3-1 3.1.2.1 General ........................................................................................................................ 3-1 3.1.2.2 Inputs ........................................................................................................................... 3-1 3.1.2.3 Processing ................................................. 3-2 3.1.2.4 Outputs ......................................................................................................................... 3-3 3.1.3 Oscillator Board .......................................................................................................... 3-4 3.1.3.1 General ........................................................................................................................ 3-4 WNS-DS-00001-WBT-NP, Rev. 2 iii Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification 3.1.3.2 Inputs ........ .................................................................................. .............. 3-4 3.1.3.3 Processing ................................................................................................................... 3-4 3.1.3.4 Outputs ........................................................................................................................ 3-5 3.2 DETECTOR INTERFACE CIRCUITRY USER INTERFACE REQUIREMENTS 3-5 3.2.1 General ....................................................................................................................... 3-5 3.2.2 Detector Interface Boards ....................................... 3-5 3.2.2.1 Test Points .................... ,.............................................................................................. 3-5 3.2.3 Oscillator Board .......................................................................................................... 3-6 3.2.3.1 Test Points ................................................................................................................... 3-6 3.2.3.2 Indicators ..................................................................................................................... 3-6 3.2.4 Backplane.................................................................................................................... 3-6 SECTION 4 PLC REQUIREM EN TS ..... ......................................... ........................................ 4-1 4.1 PLC FUNCTIONAL REQUIREM ENTS ................................................................... 4-1 4.1.1 Position Signal Algorithm .......................................................................................... 4-1 4.1.1.1 General ........................................................................................................................ 4-1 4.1.1.2 Inputs ............................................................................................................................ 4-1 4.1.1.3 Processing ................................................................................................................... 4-1 4.1.1.4 Outputs ....................................................................................................................... 4-2 4.1.2 Temperature Compensation Algorithm ...................................................................... 4-3 4.1.2.1 General ........................................................................................................................ 4-3 4.1.2.2 Inputs .......................................................................................................................... 4-3 4.1.2.3 Processing ................................................................................................................... 4-3 4.1.2.4 Outputs ........................................................................................................................ 4-4 4.1.3 Rod Bottom Bypass A lgorithmn ............................................................................. 4-4 4.1.3.1 General ........................................................................................................................ 4-4 4.1.3.2 Inputs .......................................................................................................................... 4-5 4.1.3.3 Processing ................................................................................................................... 4-5 4.1.3.4 Outputs ........................................................................................................................ 4-5 4.1.4 Bank Calibrate Algorithm ........................................................................................... 4-6 4.1.4.1 General ....................................... :................................................................................ 4-6 4.1.4.2 Inputs ......................................................................................................................... 4-6 4.1.4.3 Processing ................................................................................................................... 4-6 4.1.4.4 Outputs ........................................................................................................................ 4-7 4.1.5 Oscillator Supervision and Control Algorithm ............................................................ 4-7 4.1.5.1 General ........................................................................................................................ 4-7 4.1.5.2 Inputs ........................................................................................................................... 4-8 4.1.5.3 Processing ................................................................................................................. 4-9 4.1.5.4 Outputs ........................................................................................................................ 4-10 4.1.6 Rod D eviation A larm Algorithm s ................................................................................ 4-11 4.1.6.1 General ............................................................ ........................................................... 4-11 4.1.6.2 Inputs ........................................................................................................................... 4-11 4.1.6.3 Processing ................................................................................................................... 4-11 4.1.6.4 Outputs ....................................................................................................................... 4-13 4.1.7 Rod Insertion Lim it Algorithm ................................................................................... 4-13 WNS-DS-00001-WBT-NP, Rev. 2 i-v Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification 4.1.7.1 General ........................................................................................................................ 4-13 4.1.7.2 Inputs ........................................................................................................................... 4-14 4.1.7.3 Processing ................................................. 4-14 4.1.7.4 Outputs .................................................................................................................... 4-15 4.1.8 Rod Speed Indicator Algorithm ................................................................................ 4-15 4.1.8.1 General ............................................ ....... 4-15 4.1.8.2 Inputs ......................................................................................................................... 4-16 4.1.8.3 Processing .................................................................................................................. 4-16 4.1.8.4 Outputs ....................................................................................................................... 4-16 4.1.9 Rod Demand from Passive Summer Indicator Algorithm .......................................... 4-16 4.1.9.1 General ........................... ............. .................. ............................................... 4-16 4.1.9.2 Inputs ..................................................................................................................... 4-16 4.1.9.3 Processing ................................................. 4-16 4.1.9.4 Outputs ........................................................................................................................ 4-17 4.1.10 Rod Bottom A larm A lgorithm s .................................................................................. 4-17 4.1.10.1 G eneral .......................................................................................................... 4-17 4.1.10.2 Inputs ......................................................... I.................................................................. 4-17 4.1.10.3 Processing .................................................................................................................. 4-17 4.1.10.4 Outputs ........................................................................................................................ 4-18 4.1.11 Control Bank D Withdrawal Limit Alarm Algorithm .......................... 4-18 4.1.11.1 General .... ............................................... 4-18 4.1.11.2 Inputs ................................................................... . ............................................ 4-19 4.1.11.3 Processing ................................................................................................................... 4-19 4.1.1.1.4 Outputs ....................................................................................................................... 4-19 4.1.12 Rod Drop Test Computer Trouble (RDTC) Alarm Algorithm ................................... 4-19 4.1.12.1 General ......................... ............................................................................................ 4-19 4.1.12.2 Inputs .......................................................................................................................... 4-20 4.1.12.3 . Processing .................................................................................................................. 4-20 4.1.12.4 Outputs ........................................................................................................................ 4,20 4.1.13 Maintenance and Test Panel and Operator Module Trouble Alarm Algorithm .......... 4-20 4.1.13.1 G eneral .......................................................................................................... 4-20 4.1.13.2 Inputs ..................................................................................................... ................... 4-21 4.1.13.3 Processing .................................................................................................................. 4-21 4.1.13.4 Outputs ........................................................................................................................ 4-21 4.1.14 AF 100 Link Trouble Alarm A lgorithm .............. ......................... ............. I.............. 4-22 4.1.14.1 G eneral ....................................... ......................................................................... 4-22 4.1. 14.2 Inputs .............. ............................................................................................................. 4-22 4.1.14.3 Outputs ....................................................................................................................... 4-22 4.1.15 RPI System Trouble A larm A lgorithm................................................ ............ ............. 4-22 4.1.15.1 General ....................................................................................................................... 4-22 4.1.15.2 Inputs .......................................................................................................................... 4-23 4.1.15.3 Processing .......................................................................................................... ......... 4-23 4.1.15.4 Outputs .................................................. ................................................................ ,4-23 4.1.16 PLC Trouble Alarm Algorithm ................................... 4-23 4.1,16.1 General ..................................... ............................. ............................................... 4-23 4.1.16.2 Inputs ........................................................................................................................... 4-24 WNS-DS-00001-WBT-NP, Rev. 2 v Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification 4.1.16.3 Processing ................................................................................................................. 4-24 4.1.16.4 Outputs ....................................................................................................................... 4-24 4.1.16.5 A larm Action ............................................................................................................... 4-24 4.1.17 PLC W atchdog Timeout A larm Algorithm ................................................................. 4-24 4.1.17.1 General ......................................................... 4-24 4.1.17.2 A larm Outputs ........................................................................................................... 4-25 4.1.17.3 A larm A ction .............................................................................................................. 4-25 4.2 PLC U SER IN TERFA CE REQUIREM EN TS .......................................................... 4-25 4.2.1 M aintenance and Test Panel ...................................................................................... 4-25 4.2.1.1 General ........................................................................................................................ 4-25 4.2.1.2 Calibration Adjustm ents ............................................................................................. 4-25 4.2.1.3 Security Features.............. ............................... 4-26 4.2.1.4 Plant Com puter (ICS) Connection ............................................................................ 4-26 4.2.1.5 M TP Displays ............................................................................................................. 4-27 4.2.2 Operator Flat Panel D isplay ........................................................................................ 4-30 4.2.2.1 General ....................................................................................................................... 4-30 4.2.2.2 Calibration Adjustm ents............................................................................................. 4-31 4.2.2.3 Security Features ......................................................................................................... 4-31 4.2.2.4 OM D isplays ............................................................................................................... 4-31 SECTION 5 BLOCK D IA GRA M S ........................................................................................... 5-I 5.1 CO RE MAP [ ]c .......................................... 5-1 WNS-DS-00001-WBT-NP, Rev. 2 vi Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARM System Upgrade CERPI System Requirements Specification Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification TABLE OF CONTENTS (Cont'd)

LIST OF TABLES Table Title Page None.

LIST OF FIGURES Figure Title Page Figure 5.1-1 ]0 .............................................................. 5-1 WNS-DS-00001-WBT-NP, Rev. 2 vii Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification ACRONYMS AND TRADEMARKS Acronyms used in the document are defined in WNA-PS-00016-GEN, "Standard Acronyms and Definitions" (Reference 1), or included below to ensure unambiguous understanding of their use within this document.

Acronyms Definition 4PDT Four Pole, Double Throw CBA Control Bank.A CBB Control Bank B CBC Control Bank C CBD Control Bank D CERPI Computer Enhanced Rod Position Indication CRDM Control Rod Drive Mechanism DIB Detector.Interface Board EMI Electro-Magnetic Interference ICS TVA Integrated Computer System MCR Main Control Room MTP Maintenance and Test Panel OFPD Operator Flat Panel Display PC Personal Computer PLC Programmable Logic Controller Q Filter Quality RC Resistance Capacitance RIL Rod Insertion Limit RPI Rod Position Indication RWL Rod Withdrawal Limit SBA Shutdown Bank A SBB Shutdown Bank B SBC Shutdown Bank C SBD Shutdown Bank D TVA Tennessee Valley Authority WNA Westinghouse Nuclear Automation Advant is a registered trademark of ABB Process Automation Corporation.

All product and corporate names used in this document may be trademarks or registered trademarks of other companies, and are used only for explanation and to the owners' benefit, without intent to infringe.

WNS-13S-00001-WBT-NP, Rev. 2 °iii Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification GLOSSARY OF TERMS Standard terms used in the document are defined in WNA-PS-000 I6-GEN, "Standard Acronyms and Definitions" (Reference 1), or included below to ensure unambiguous understanding of their use within this document.

Term Definitions PLC Train One redundant set of signal processing equipment including one Programmable Logic Controller (PLC), its associated maintenance and test panel, fiber optic modems, power supplies, and other hardware not shared as inputs to the redundant PLCs.

Tunable A system parameter that can be adjusted.

WNS-DS-00001-WBT-NP, Rev. 2 ix Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARPI Svsteni Up2rade CERPI System Requirements Specification REFERENCES Following is a list of references used throughout this document.

1. WNA-PS-0001 6-GEN, Rev. 3, "Standard Acronyms and Abbreviations," Westinghouse Electric Company LLC.

WNS-DS-00001-WBT-NP, Rev. 2 x Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification REQUIREMENTS Design and/or other requirements have been identified in this document. Following is a list of the requirement numbers and the document page on which the requirement is identified.

R101 .............. 1-1 R315 ................... 3-2 R102 ............... 1-1 R316 ....................... 3-3 R103 ................... 1-1 R317 ...................... 3-3 R104 ................... 1-1 R318 ....................... 3-3 R105 ....................... 1-2 R319 ...................... 3-3 R107 ....................... 1-2 R320 ....................... 3-3 R108 ....................... 1-2 R321 .......... 3-3 R109 ....................... 1-2 R322.4 ................... 3-3 R110 ........................ 1-2 R323 ...... ............... 3-4 R111 ....................... 1-2 R324 ....................... 3-4 R112 .......... 1-2 R325 .................. 3-4 R201 ........................ 2-1 R326 ....................... 3-4 R202 ............... 2-1 R327 ....................... 3-4 R203 ....................... 2-1 R328 ....................... 3-4 R204 ....................... 2-1 R329 .................... 3-4 R205 ....................... 2-1 R330 ....................... 3-4 R207 ....................... 2-1 R331 ....................... 3-4 R208 ....................... 2-1 R332 ....................... 3-5 R209 ....................... 2-1 R333 ....................... 3-5 R210 .................. 2-1 R334 ....................... 3-5 R211 ....................... 2-2 R335 ...................... 3-5 R212 ....................... 2-2 R336 ....................... 3-5 R213 ....................... 2-2 R337 ....................... 3-5 R214 ....................... 2-2 R338 ....................... 3-6 R215 ....................... 2-2 R339 ....................... 3-6 R216 ....................... 2-2 R340 ....................... 3-6 R217....................... 2-3 R341 ................... 3-.6 R301 ....................... 3-1 R401 ................... 4-1 R302 ....................... 3-1 R402 ................... 4-1 R303 ............... 3-1 R403 .................. 4-1 R304 .............. 3-1 R404 .................... :.4-1 R305 ....................... 3-1 R405 ....................... 4-2 R306 ....................... 3-1 R406 ....................... 4-2 R307 ....................... 3-1 R407 ...................... 4-2 R308 ....................... 3-1 R408 ....................... 4-2 R309 ....................... 3-2 R409 ....................... 4-2 R310 ....................... 3-2 R410 ............. 4-2 R311 ....................... 3-2 R411 ....................... 4-2 R312 ............... 3-2 R412 ................. 4-2 R313 ....................... 3-2 R413 ....................... 4-2 R314 ...................... 3-2 R414 ....................... 4-2 NVNS-DS-00001-WBT-NP, Rev. 2 xi Westinghouse.Non-Proprietary Class 3

Watts Bar Unit 2 ARM System Upgrade CERPI System Reuuirements Specification Watts Bar Unit 2 ARPI Svsten Upgrade CERPI System Requirements Specification R415 ....................... 4-2 R463 ....................... 4-9 R416 ....................... 4-3 R464 ....................... 4-9 R 417 ....................... 4-3 R465 ....................... 4-9 R418 ....................... 4-3 R466 .......... 4-10 R419 ....................... 4-3 R467 ...................... 4-10 R420 ....................... 4-3 R468 ....................... 4-10 R421 ....................... 4-3 R469 ....................... 4-10 R422 ....................... 4-3 R470 ....................... 4-10 R423 .................. 44 R471 ....................... 4-10 R424 .................. 4-4 R472 ....................... 4-10 R425 ....................... 4-4 R473 ....................... 4-10 R426 .................. 4-4 R474 ....................... 4-11 R427 ...................... 4-4 R475 ....................... 4-11 R428 ....................... 4-4 R476 ....................... 4-11 R431 ........................ 4-4 R477 ....................... 4-11 R432 ....................... 4-5 R478 ....................... 4-11 R433 ...............4-5 R479 ....................... 4-11 R434 ....................... 4-5 R480 ....................... 4-12 R435 ....................... 4-5 R481 ....................... 4-12 R436 ....................... 4-5 R482 ...................... 4-12 R437 ....................... 4-5 R483 ....................... 4-12 R438 ....................... 4-6 R484 ....................... 4-12 R439 ....................... 4-6 R485 ....................... 4-12 R440 ....................... 4-6 R486 . ........ ......... 4-12 R441 ....................... 4-6 R487 ....................... 4-12 R442 ....................... 4-6 R488 ....................... 4-12 R443 .................... 4-7 R489 ....................... 4-12 R444 ....................... 4-7 R490 ....................... 4-12 R445 ..................... 4-7 R491 ...................... 4-12 R446 ....................... 4-7 R492 ....................... 4-13 R447 ....................... 4-7 R493 ....................... 4-13 R448 ....................... 4-7 R494 .......... 4 13 R449 ....................... 4-8 R495 ....................... 4-13 R450 ....................... 4-8 R496 ................... 4-13 R451 ....................... 4-8 R497 .......... 4-13 R452 ....................... 4-8 R498 ....................... 4-13 R453 ....................... 4-8 R499 .......... 4-13 R 454 ....................... 4-8 R500 ....................... 4-14 R 455 -.................... 4-9 R501 ....*-................ 4-14 R 456 ....................... 4-9 R502 ............... 4-14 R 457 ....................... 4-9 R503 ....................... 4-14 R 458 ....................... 4-9 R504 ....................... 4-14 R459 ....................... 4-9 R505 ....................... 4-14 R460 ....................... 4-9 R506 ....................... 4-15 R461 .................... 4-9 R507 ....................... 4-15 R462 ....................... 4-9 R508 ....................... 4-15 WNS-DS-00001-WBT-NP, Rev. 2 xii Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification R509 ............... 4-15 R556 ....................... 4-23 R512 ....................... 4-15 R557 ....................... 4-23 R513 .... ................. 4-15 R559 ...................... 4-24 R514 ....................... 4-15 R560 ....................... 4-24 R515 ...................... 4-16 R561 ...................... 4-24 R516 .................. 4-16 R562 ...................... 4-24 R517 ........................ 4-16 R563 ....................... 4-24 R518...................... 4-16 R564 ....................... 4-25 R519 ....................... 4-17 R565 ....................... 4-25 R520 ....................... 4-17 R567 ....................... 4-25 R 521 ....................... 4-17 R568 ....................... 4-25 R522 .......... 4-17 R569 ....................... 4-25 R523 .......... 4-17 R570 ....................... 4-25 R524 ...................... 4-17 R571 ...............4-25 R525 ....................... 4-18 R572 .......... 4-25 R 526 ....................... 4-18 R573 ...................... 4-26 R527 ...............4-18 R575 ..... ...... 4-26 R 528 ....................... 4-18 R576 ....................... 4-26 R 529 ....................... 4-18 R577 ....................... 4-26 R530 ................. 4-18 R578 ....................... 4-26 R531 ...................... 4-18 R579 ....................... 4-26 R 532 ....................... 4-18 R580 ....................... 4-26 R 533 ....................... 4-19 R581 ....................... 4-26 R 534 ....................... 4-19 R582 ....................... 4-26 R 535 ....................... 4-19 R583 ....................... 4-26 R536 ................... 4-19 R584 ....................... 4-27 R 538 ...................... 4-19 R585 ............... 4-27 R 539 ...................... 4-19 R586 ....................... 4-27 R540 ....................... 4-19 R587 ....................... 4-27 R541 ....................... 4-20 R588 ....................... 4-27 R542 ....................... 4-20 R590 ...................... 4-27 R543 ...................... 4-20 R591 ....................... 4-27 R544 ....................... 4-20 R592 ....................... 4-27 R545 ....................... 4-20 R593 ....................... 4-27 R546 ....................... 4-20 R594...................... 4-27 R547 ........................ 4-21 R595 .................. 4-27 R548 ....................... 4-21 R597.1 .................... 4-28 R549 ....................... 4-21 R598 ....................... 4-28 R550 .................... 4-21 R599 .............. 4-28 R 551 ....................... 4-21 R600 .......... 4-28 R552 ....................... 4-21 R601 ....................... 4-28 R545 ....................... 4-22 R602 ...................... 4-28 R546 ....................... 4-22 R603 ....................... 4-28 R552 ...............4-22 R604 .............. 4-28 R553 ....................... 4-22 R605 ....................... '4-28 R554 ....................... 4-23 R606 ....................... 4-28 oiio Westinghouse Non-Proprietary Class 3 WNS-DS-00001-WBT-NP, Rev. 2

Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification R607 ....................... 4-28 R608 ....................... 4-28 R609 ....................... 4-28 R610 ...................... 4-28 R611 ....................... 4-28 R612 ...................... 4-29 R613 ..................... 4-29 R614 ....................... 4-29 R615 ....................... 4-29 R616 .................. 4-29 R617....................... 4-29 R618 ....................... 4-29 R619........................ 4-30 R620 ............... 4-30 R621 ...................... 4-30 R622 .................... 4-30 R623 ....................... 4-30 R624 ....................... 4-30 R625 ....................... 4-30 R626 ....................... 4-30 R627 ...............4-31 R628 ....................... 4-31 R630 ....................... 4-31 R631 ....................... 4-31 R632 ....................... 4-31 R633 ....................... 4-31 R634 ....................... 4-31 R635 ....................... 4-31 R636 ....................... 4-32 R637 ....................... 4-32 R638 ....................... 4-32 R639 ....................... 4-32 R640 ....................... 4-32 R641 ....................... 4-32 R642 ....................... 4-32 R643 ...............4-32 R644 ....................... 4-32 R645 ....................... 4-32 R646 ....................... 4-32 R647 ...... .................. 4-33 R648 .......... 4-33 R649 ........................ 4-33 (Last Page of Front Matter)

WNS-DS-00001-WBT-NP, Rev. 2 xiv Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARPI Svsteni Upizrade CERPI System Requirements Specification SECTION 1 INTRODUCTION 1.1 PURPOSE This specification presents the Westinghouse Computer Enhanced Rod Position Indication (CERPI) system hardware and software requirements for the Watts Bar Nuclear Plant Unit 2.

1.2 SCOPE The requirements presented herein apply to the detector interface circuitry, the programmable controllers, and the Human-System Interfaces (HSIs) of the CERPI system.

This is not a commnercial document and does not define project scope of supply.

1.3 OVERVIEW 1.3.1 Existing RPI System The existing rod position indication (RPI) system provides indication for 57 rods. It is used for plant technical specification compliance and is non-safety related.

The RPI detector is a linear voltage transformer. Detector primary excitation is provided by a constant current source. Detector Secondary voltage is rectified and signal-conditioned to provide analog outputs to control board meters and to the plant's Integrated Computer System (ICS). Rod bottom alarm indication is provided to the plant computer and to the main control room (MCR).

1.3.2 CERPI System R101

[The CERPI system shall use the existing RPI detectors.]

R102

[Improved detector primary excitation and secondary signal conditioning shall be incorporated.]

R103

[Individual rod bottom alarm functions shall be provided.]

C WNS-DS-00001-WBT-NP, Rev. 2 1-1 Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARPI Systern Upgrade W CERPI System Requirements Specification R105 j

R107

[Two PLCs - called "PLC A" and "PLC B," respectively - shall independently calculate rod positions and other algorithms described in this document.]

R108

[The only electrical commonality between the PLCs shall be the detector interface boards and the Oscillator control switch.]

R109

[A Maintenance and Test Panel (MTP) for each PLC shall be utilized for calibration and maintenance use at the instrument rack, and for establishing the Ethernet connections to the ICS.]

R1 10

[The MTPs shall also be capable of displaying rod positions.]

Ri11

[Rod position inforniation determined by the redundant PLCs shall be provided to the Operator's Module (OM) on the Main Control Board (MCB) utilizing the Advant-' Fieldbus 100 (AF 100) bus, and to the ICS using the Ethernet connection.]

Guidance: PLC A communicates its information to a dedicated OM that is only capable of displaying information from PLC A. Likewise, PLC B communicates its information to a dedicated OM that is only capable of displaying information from PLC B.

RI 12

[Each PLC train shall have a dedicated control-board-mounted OM, AF 100 network, and Ethernet connection to the ICS.]

(Last Page of Section 1)

WNS-DS-00001-WBT-NP, Rev. 2 1-2 Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARPI Svstem Upi!rade CERPI System Requirements Specification SECTION 2 GENERAL SYSTEM REQUIREMENTS 2.1 DESIGN CONSTRAINTS 2.1.1 Physical Layout Constraints R201

[The CERPI replacement system electronics shall occupy no more than the four (4) cabinets of the existing RPI system electronics, with minimal structural changes to maintain the seismic qualification.]

R202 2.1.2 Environmental Constraints R203

[The CERPI system shall function in an ambient room temperature varying between 65°F and 120'F.]

2.1.3 Redundancy Requirements R204

[Redundant PLCs, power supplies, MTPs, fiber optic modems, and other related hardware to each PLC train shall be implemented in the CERPI design.]

R205

[Redundant Rod Bottom Bypass Logic control signals shall be provided via each redundant PLC train.]

R207

[Alarms shall be provided via signal relays for PLC Trouble, PLC Watchdog, [

]a, Oscillator Trouble, Rod-to-Bank Deviation, Rod-to-Rod Deviation, Insertion Limit Low, Insertion Limit Low-Low, Control Bank D (CBD) Withdrawal Limit, Any Rod On Bottom, All Rods On Bottom, and Power Supply Fail.]

R208

[The outputs in R207 shall be provided by each PLC train.]

Guidance: The system used for alarms in the plant shall determine which of the two redundant PLCs to consider.

R209

[Two OMs with redundant communication connections to their respective PLC train shall be provided.]

R210

[Each PLC shall provide rod position and rod bottom information to its respective MTP and OM.]

WNS-DS-00001-WBT-NP, Rev. 2 2-1 Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification R211

[Each MTP shall be capable of providing the rod position information it receives from the PLC to the ICS via the fiber optic Ethernet connection.]

R212

[Redundant Oscillators shall be implemented in the system. [

C]

R213

[Redundant 24 VDC power supplies shall be utilized for each PLC train. Diode auctioneering and fault indicators shall be utilized.]

2.1.4 Retention of PLC Data R214

[Application program shall be stored in non-volatile memory (flash Programmable Read-Only Memory

[PROM]).]

2.2 SYSTEM PERFORMANCE REQUIREMENTS 2.2.1 System Accuracy Requirements R215

[The total system accuracy shall be at least +/-12 steps for reactor plant steady-state conditions between zero power hot standby and full power operation over a fuel cycle of 18 months, including throughout rod movement.]

2.2.1.1 Total System Accuracy Error Terms R216 C 2-2 Westinghouse Non-Proprietary Class 3 WNS-DS-OOOO1-WBT-NP, Rev.

WNS-DS-00001-WBT-NP, Rev. 2 2 2-2 Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification 2.2.1.2 {System Error Budget Allowances The following error budget allowances are based on a calibrated span of 0-231 steps.

Error Budget Term Error Allowance Error Allowance (Steps) (% of Calibrated Span) C Total Allowance +/-12  :+/-5.19%

2.2.2 System Throughput Requirements R217

[The time that is required to process the rod position signal and rod bottom alarm from input to the detector interface board (DIB) shall be less than 2 seconds.]

(Last Page of Section 2)

WNS-DS-00001-WBT-NP, Rev. 2 2-3 Westinghouse Non-Proprietary Class3

Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification SECTION 3 DETECTOR INTERFACE CIRCUITRY REQUIREMENTS 3.1 DETECTOR INTERFACE CIRCUITRY FUNCTIONAL REQUIREMENTS 3.1.1 General R301

[The Watts Bar Unit 2 CERPI system detector interface circuitry shall consist of 57 DIBs, one for each control rod, and two Oscillator boards (main and backup).]

R302

[The DIBs shall perform RPI detector primary excitation and secondary filtering, rectification, and

[ ]C]

L R303 IR304 R3M5

[The main Oscillator shall be the normal source of DIB frequency references.]

R306

[In the event of a main Oscillator failure, the DIB frequencies shall be automatically switched to be sourced from the backup Oscillator.]

3.1.2 Detector Interface Board 3.1.2.1 General R307 3.1.2.2 Inputs R308 WNS-DS-00001-WBT-NP, Rev. 2 3-1 Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification R309 C K 3.1.2.3 Processing 3.1.2.3.1 Rod Position Signal m R310 C I R311 I

C I

R312

[Each DIB reference frequency shall beprovided by the Oscillator board.]

Guidance: The existing detector couples AC voltage from the primary winding to the secondary winding in response to actual rod position.

R313 C R3 14 IiC E1R315 j WNS-DS-00001-WBT-NP, Rev. 2 3-2 Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification R316 e 3.1.2.3.2 RPI Detector Resistance Signal R317 ]C I

R318 C

R319 R320 j

3.1.2.4 Outputs 3.1.2.4.1 Position Signal Outputs R321

[Each DIB shall provide two redundant [ ]f output signals proportional to rod position.]

C R322 3-3 Westinghouse Non-Proprietary Class 3 WNS-DS-OOOO1-WBT-NP, Rev.

WNS-DS-00001-WBT-NP, Rev. 2 2 3-3 Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification R323 C L

3.1.2.4.2 IL R324 C C

R325 R326 Ii I

3.1.3 Oscillator Board 3.1.3.1 General R327 C R328

[There shall be two Oscillator boards: a main and a backup.

]C]

R329

[In the event of a main Oscillator failure, the reference frequency busses shall be automatically switched to the backup Oscillator.]

3.1.3.2 Inputs C

E 3.1.3.3 330 Processing jC C

[R331 WNS-DS-00001-WBT-NP, Rev. 2 3-4 Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARM System Upgrade CERPI System Requirements Specification R3 3 2 R333 c 3.1.3.4 Outputs R334 EC R335 3.2 DETECTOR INTERFACE CIRCUITRY USER INTERFACE REQUIREMENTS 3.2.1 General R336

[Fuses located on the DIBs and Oscillator boards shall be fixed, utilizing sockets to allow replacement without soldering.]

3.2.2 Detector Interface Boards 3.2.2.1 Test Points

_R337 a 3-5 Westinghouse Non-Proprietary Class 3 WNS-DS-OOOO1-WBT-NP, Rev.

WNS-DS-00001-WBT-NP, Rev. 2 2 3 -5 Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification 3.2.3 Oscillator Board 3.2.3.1 Test Points R338 a 3.2.3.2 Indicators R339

[A green front card edge Light Emitting Diode (LED) shall be provided for each Oscillator frequency.]

R340

[The LED shall be lit by the applicable reference frequency.]

3.2.4 Backplane R341

[Each backplane slot shall have a connector for interfacing the RPI detector to the DIB located in the slot.]

(Last Page of Section 3)

WNS-DS-00001-WBT-NP, J Rev. 2 3-6 Westinhouse Non-Pronrietarv Classs3 L* L

Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification SECTION 4 PLC REQUIREMENTS 4.1 PLC FUNCTIONAL REQUIREMENTS Note The CERPI system shall have two redundant PLC trains. Both PLC trains shall have identical programs to fulfill the functional requirements described in this section. The requirements below describe one PLC train, which is acceptable because each PLC train is identically designed.

4.1.1 Position Signal Algorithm 4.1.1.1 General R401

[The position signal algorithm shall receive the rod position signal

]C from its associated DIB and provide the following functions:

_.R402 C

4.1.1.2 Inputs c

4 4 4 4 4.1.1.3 Processing 4.1.1.3.1 Position Signal Zero and Span FR403 C

[R404 C Rev. 22 4-1 Westinghouse Non-Proprietary Class 3 WNS-DS-OOOO1-WBT-NP, WNS-DS-00001-WBT-NP, Rev. 4-1 Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification C

R405 I

FR406 C

R407 C

R408 I

4.1.1.3.2 Position Signal Linearization C R409 I

R410 L C E1R411 C

IE1R413 R412 C

C R414 j

R415 4.1.1.4 Outputs C

4-2 Westinghouse Non-Proprietary Class 3 WNS-DS-OOOO1-WBT-NP, Rev.

WNS-DS-00001-WBT-NP, Rev. 2 2 4-2 Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARM System Upgrade CERPI System Requirements Specification 4.1.2 Temperature Compensation Algorithm 4.1.2.1 General R416 C

R417 R418 C Ic 4.1.2.2 Inputs C

I I I I I

  • 4.1.2.3 Processing R419 C R420 3 R421 IC R422 ]C E

4-3 Westinghouse Non-Proprietary Class 3 WNS-DS-00001-WBT-NP, Rev. 2 WNS-DS-OOOO1-WBT-NP, Rei'. 2 4-3 Westinghouse Non-Proprietan, Class 3

Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification C

E R423 C I R424 R425 C L R426 E C R427 C

4.1.2.4 Outputs R428 L 4.1.3 Rod Bottom Bypass Algorithm 4.1.3.1 General E

r 431 j

WNS-DS-00001-WBT-NP, Rev. 2 4-4 Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification R432 4.1.3.2 Inputs 4.1.3.3 Processing R433 C R434 ER436 4.1.3.4 Outputs C

4 1 4-5 Westinghouse Non-Proprietary Class 3 Rev. 2 NN'NS-DS-00001-WBT-NP, Rei'.

WNS-DS-O9091-WBT-NP, 2 4-5 Westinghouse Non-Proprietary Class 3 I

Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification 4.1.4 Bank Calibrate Algorithm 4.1.4.1 General R438 R439 L 4.1.4.2 Inputs C

4 4 4.1.4.3 Processing 4.1.4.3.1 Temperature Compensation Null Adjustment E R440 ]I 1 R441 J I R442 WNS-DS-00001-WBT-NP, Rev. 2 4-6 Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification 4.1.4.3.2 Position Zero Adjustment ER443 4.1.4.3.3 Position Span Adjustment R444 J R445 C 14.1.4.4 Outputs I

C 4.1.5 Oscillator Supervision and Control Algorithm LC 4.1.5.1 General R446 R447 C R448 WNS-DS-00001-WBT-NP, Rev. 2 4-7 Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification ER449 q IR450 q R451 Intentionally Left Blank.

ER452 1 R454 c 4.1.5.2 Inputs C

4. 0 1* I 4.
4. I 4 4 4 4
4. I.

4 4.

WNS-DS-00001-WBT-NP, Rev. 2 4-8 Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification 4.1.5.3 Processing R455 KR456 j

R457 Intentionally Left Blank.

R458 Intentionally Left Bank.

R459 Intentionally Left Bank.

R460 Intentionally Left Blank.

R461 Intentionally Left Blank.

ER462 c K_463 j R464 Intentionally Left Blank.

R465 WNS-DS-00001-WBT-NP, Rev. 2 4-9 Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARM System Upgrade CERPI System Requirements Specification IR466 Intentionally Left Blank.

R467 Intentionally Left Blank.

ER468 I

c R469 R470 Intentionally Left Blank.

R471 Intentionally Left Blank.

R472 Intentionally Left Blank.

R473 4.1.5.4 Outputs i i WNS-DS-00001-WBT-NP, Rev. 2 4-10 Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification 4.1.6 Rod Deviation Alarm Algorithms 4.1.6.1 General R474 C K R475 C 4.1.6.2 Inputs C

  • I. 4-

+ 4.

4- 1" 4.1.6.3 Processing 4.1.6.3.1 Rod-to-Rod Deviation R476 C K

I _R477 C I R478 C R479 Intentionally Left Blank.

WNS-DS-00001-WBT-NP, Rev. 2 4-11 Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification R480 C E

R481 C

-E R482 Intentionally Left Blank.

483 I

R484 I

4.1.6.3.2 Rod-to-Bank Deviation RR485 C E

R486 K

CI487 C

R488 I R489 C

C I

R490 C

R491 I I WNS-DS-00001-WBT-NP, Rev. 2 4-12 Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification Watts Bar Unit 2 ARPI Systeni Upgrade CERPI System Requirements Specification R492 Intentionally Left Blank.

R493 j-c R494 II1 R495 Intentionally Left Blank.

R496 I

I r497

[R498 I

4.1.6.4 Outputs C

.1. 4

+ 4 4 4 4.1.7 Rod Insertion Limit Algorithm 4.1.7.1 General R499 I

WNS-DS-00001-WBT-NP, Rev. 2 4-13 Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARPI System Upgrade CE"I System Requirements Specification Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification R500 C R501 j

4.1.7.2 Inputs C 4.1.7.3 Processing R502 C R503 C R504 C

LR505 j WNS7DS-00001-WBT-NP, Rev. 2 4-14 Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARM System Upgrade CERPI System Requirements Specification C

I 507 j

R508 E

R509 Intentionally Left Blank.

4.1.7.4 Outputs C

4 I 4 i R512 Intentionally Left Blank.

R513 C 4.1.8 Rod Speed Indicator Algorithm 4.1.8.1 General R514 C 4-15 Westinghouse Non-Proprietary Class 3 WNS-DS-OOOO1-WBT-NP, Rev.

WNS-DS-00001-WBT-NP, Rev. 2 2 4-15 Westinghouse Non-Proprietar-y Class 3

Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification R515 t 4.1.8.2 C

Inputs 4.1.8.3 Processing R516 4.1.8.4 Outputs 4.1.9 Rod Demand from Passive Summer Indicator Algorithm 4.1.9.1 General R517 C 4.1.9.2 Inputs C

4.1.9.3 Processing R518 C WNS-DS-00001-WBT-NP, Rev. 2 4-16 Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARM System Upgrade CERPI System Requirements Specification 4.1.9.4 Outputs C

4.1.10 Rod Bottom Alarm Algorithms 4.1.10.1 General C

r 519 I R520 E

R521 4.1.10.2 Inputs C

.4. 4

+ 4 4.1.10.3 Processing 4.1.10.3.1 Rod Bottom Alarms R522 C IR523 Intentionally Left Blank.

R524 Intentionally Left Blank.

4-17 Westinghouse Non-Proprietary Class 3 WNS-DS-90001-WBT-NP, Rev.

WNS-DS-00001-WBT-NP, Rev. 2 2 4-17 Westinghouse Non-Proprictary Class 3

Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification R525 c R526 c E ]

4.1.10.3.2 Any Rod On Bottom Alarm R527 Intentionally Left Blank.

  • 528 ,c 4.1.10.3.3 All Rods On Bottom Alarm R529 Intentionally Left Blank ER530 c 4.1.10.4 Outputs c 4.1.11. Control Bank D Withdrawal Limit Alarm Algorithm 4.1.11.1 General R531 c K

IR532 II c

WNS-DS-00001-WBT-NP, Rev. 2 - 4-18 Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification 4.1.11.2 Inputs 4.1.11.3 Processing R533 R534 Intentionally Left Blank.

R535 c R536 C E ]

R538 C LI U 4.1.11.4 Outputs 4.1.12 Rod Drop Test Computer Trouble (RDTC) Alarm Algorithm 4.1.12.1 General R539 a

ER540 WNS-DS-00001-WBT-NP, Rev. 2 4-19 Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification 4.1.12.2 Inputs 4.1.12.3 Processing R541 a R542 Intentionally Left Blank.

543 i R5 4 4 a 4.1.12.4 Outputs 4.1.13 Maintenance and Test Panel and Operator Module Trouble Alarm Algorithm 4.1.13.1 General ER545 c IR546 II C

4-20 Westinghouse Non-Proprietary Class 3 WNS-DS-00001-WBT-NP, Rev.

WNS-DS-QQOO1-WBT-NP, Rev. 2 2 4-20 Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARM System Upgrade CERPI System Requirements Specification Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification 4.1.13.2 Inputs

.4.1.13.3 Processing R547

[The heartbeat alarms shall be implemented using counters.]

R548 Intentionally Left Blank.

R549 Intentionally Left Blank.

R550 Intentionally Left Blank.

R551 Intentionally Left Blank.

R552 Intentionally Left Blank.

4.1.13.4 Outputs c

  • l. 1

+ I WNS-DS-00001-WBT-NP, Rev. 2 4-21, Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification 4.1.14 AF100 Link Trouble Alarm Algorithm 4.1.14.1 General R545 c R5 4 6 c 4.1.14.2 Inputs c 4.1.14.3 Outputs c 4.1.15 RPI System Trouble Alarm Algorithm 4.1.15.1 General ER552 c KR553 WNS-DS-00001-WBT-NP, Rev. 2 4-22 Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 -ARPI Svstem Upiwade CERPI System Requirements Specification Watts Bar Unit 2 ARPI Svsteni Upgrade CERPI System Requirements Specification 4.1.15.2 Inputs C

_____________________________________________________ _____________________ I _____________________________________________

i i4 4- 4.

  • 1.

4.1.15.3 Processing R554 j E

4.1.15.4 Outputs 4.1.16 PLC Trouble Alarm Algorithm 4.1.16.1 General R556 C E

C

_R557 WNS-DS-00001-WBT-NP, Rev. 2 4-23 Westinghouse Non-Proprietary Class 3

E Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification j

4.1.16.2 Inputs c 4.1.16.3 Processing R559 4.1.16.4 Outputs

[560 j R56 1 -1 4.1.16.5 Alarm Action 1R562 4.1.17 PLC Watchdog Timeout Alarm Algorithm 4.1.17.1 General IR563 IC WNS-DS-00001-WBT-NP, Rev. 2 4-24 Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification Watts Bar Unit 2 ARPI Systeni Upgrade CERPI System Requirements Specification 4.1.17.2 Alarm Outputs KR564 j KR565 4.1.17.3 Alarm Action R567 4.2 PLC USER INTERFACE REQUIREMENTS 4.2.1 Maintenance and Test Panel 4.2.1.1 General R568

[One MTP shall be provided with each PLC train.]

R569

[The MTP shall provide the means to:

0 Calibrate the CERPI system 0 Communicate with the Plant Computer 0 Reset the Oscillator transfer function 0 Show indication of the rod positions 0 Evaluate system health]

R570

[The MTP shall serve as a gateway between the PLC and the ICS.]

R571

[The MTP shall be a PC Node Box with a touch-screen flat panel display.]

4.2.1.2 Calibration Adjustments R572 WNS-DS-00001-WBT-NP, Rev. 2 4-25 Westinghouse Non-Proprietary Class 3

jC Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification t

1 R573 1 C 4.2.1.3 Security Features R575 IR576 I C R577 4.2.1.4 Plant Computer (ICS) Connection R578

[There shall be a fiber optic Ethernet connection between the MTP and the ICS.]

R579

[The MTP shall broadcast data to the ICS]

R580 C R582 I I FR583 c

-1 4-26 Westinghouse Non-Proprietary Class 3 WNS-DS-00001-WBT-NP, Rev.

~VNS-DS-OOOO1-WBT-NP, Rev. 22 4-26 Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification 4.2.1.5 MTP Displays 4.2.1.5.1 Control Banks A, B, C, and D Rod Positions Display R584

[A display screen shall be provided to show the positions of the rods in CBA, CBB, CBC, and CBD in a bar graph format.]

R585

[The ability to identify a rod position value affected by a faulty analog input shall be provided.]

R586

[An indication for the rod bottom position of each rod shall be provided.]

R587

["Any Rod On Bottom," "All Rods On Bottom," "Rod-to-Bank Deviation," "Rod-to-Rod Deviation," and "RPI System Trouble" alarm signals shall be displayed on this screen.]

R588 C R590

[The "Rod Demand from Passive Summer" and "Rod Speed" indicators shall be provided in bar graph format.]

4.2.1.5.2 Shutdown Banks.A, B, C, and D Rod Position Display R591

[A display screen shall be provided to show the positions of the rods in Shutdown Banks A, B, C, and D (SBA, SBB, SBC, SBD) in a bar graph format.]

R592

[The ability to identify a rod position value affected by a faulty analog input shall be provided.]

R593

[An indication for the rod bottom position of each rod shall be provided.]

R594

["Any Rod On Bottom," "All Rods On Bottom," "Rod-to-Bank Deviation," "Rod-to-Rod Deviation," and "RPI System Trouble" alarm signals shall be displayed on this screen.]

R595 C WNS-DS-00001-WBT-NP, Rev. 2 4-27 Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification R597

[The "Rod Demand from Passive Summer" and "Rod Speed" indicators shall be provided in bar graph format.]

4.2.1.5.3 All Rods Display R598

[A display screen which shows all system rod position values simultaneously shall be provided.]

R599

[The ability to identify a rod position value affected by a faulty analog input shall be provided.]

R600

["Any Rod On Bottom," "All Rods On Bottom," "Rod-to-Bank Deviation," "Rod-to-Rod Deviation," and "RPI System Trouble" alarm signals shall be displayed on this screen.]

R601 C R602

[The "Rod Demand from Passive Summer" and "Rod Speed" indicators shall be provided in bar graph format.]

4.2.1.5.4 Bank Demands Display R603

[A display screen shall be provided to show the demand positions for all the control and shutdown banks.]

R604

[Rod Withdrawal limit for CBD and its associated alarm condition, and rod insertion LOW and LOW-LOW limits for CBA, CBB, CBC, and CBD and the associated alarm conditions shall be displayed.]

R605

["Any Rod On Bottom," "All Rods On Bottom," "Rod-to-Bank Deviation," "Rod-to-Rod Deviation," and "RPI System Trouble" alarm signals shall be displayed on this screen.]

R606 C R607

[The "Rod Demand from Passive Summer," "Rod Speed," and "Rod Direction" indicators shall be provided.]

WNS-DS-00001-WBT-NP, Rev. 2 4-28 Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification 4.2.1.5.5 Bank Calibration Display R608

[A display screen which allows for bank automatic calibration adjustments of a selected rod bank shall be provided.]

R609 Cý R610 I 4.2.1.5.6 Individual Rod Calibration Display L Calibration Tunable Parameter Adjustments -

K 6 11 C R612 C R613 C 4.2.1.5.7 System Status Display R614 R615 c I I WNS-DS-00001-WBT-NP, Rev. 2 4-29 Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 -A"ISystem Upgrade CERPI System Requirements Specification Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification 4.2.1.5.8 System Resets Display R617

[A display screen containing a reset button for transferring the Oscillator switch-over function back to the main Oscillator for recovery from an Auto-Transfer event shall be provided.]

K R618 j j

4.2.1.5.9 System Tunable Parameters Display R619 I

R620 j

4.2.1.5.10 Rod Insertion Limit Alarm Constant Tuning R621 c 4.2.1.5.11 Alarm Selection Display R622

[A display screen that contains an enable/disable toggle button for each "Rod-to-Rod Deviation,"

"Rod-to-Bank Deviation," "Rod Bottom," "Any Rod On Bottom," "All Rods On Bottom," "Rod Withdrawal Limit," and "RDTC Trouble" alarm shall be provided.]

4.2.2 Operator Flat Panel Display 4.2.2.1 General R623

[There shall be two OMs in the MCR: one for each PLC train.]

R624

[Each OM shall consist of four (4) operator-selectable screens that are selectable from either the touch-screen or trackballs that are connected to each OM.]

WNS-DS-00001-WBT-NP, Rev. 2 4-30 Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification R625

[Operator functions shall be limited to:

  • Selecting screens
  • Monitoring individual rod positions
  • Evaluating system status]

R626

[No operator action shall be capable of affecting CERPI system calibration or programming.]

R627

[Each OM shall consist of:

  • A PC Node Box
  • A touch-screen flat panel display

" A trackball]

4.2.2.2 Calibration Adjustments R628

[PLC tunable parameters or the PLC calibration constants shall not be adjustable via OM.]

4.2.2.3 Security Features R629

[There shall not be any password-protected screens on the OM.]

4.2.2.4 OM Displays Note Each OM shall be capable of accessing all the displays described in this section.

4.2.2.4.1 Control Banks A, B, C, and D Rod Position Display R630

[A display screen shall be provided to show the positions of the rods in CBA, CBB, CBC, and CBD in a bar graph format.]

R631

[The ability to identify a rod position value affected by a faulty analog input shall be provided.]

R632

[An indication for the rod bottom position of each rod shall be provided.]

WNS-DS-00001-WBT-NP, Rev. 2 4-31 Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification R633

["Any Rod On Bottom," "All Rods On Bottom," "Rod-to-Bank Deviation," "Rod-to-Rod Deviation," and "RPI System Trouble" alarm signals shall be displayed on this screen.]

634 C R635

[The "Rod Demand from Passive Summer" and "Rod Speed" indicators shall be provided in bar graph fornat.]

4.2.2.4.2 Shutdown Banks A, B, C, and D Rod Position Display R636

[A display screen shall be provided to show the positions of the rods in SBA, SBB, SBC, and SBD in a bar graph format.]

R637

[The ability to identify a rod position value affected by a faulty analog input shall be provided.]

R638

[An indication for the rod bottom position of each rod shall be provided.]

R639

["Any Rod On Bottom," "All Rods On Bottom," "Rod-to-Bank Deviation," "Rod-to-Rod Deviation," and "RPI System Trouble" alarm signals shall be displayed on this screen.]

L R640 C R641

[The "Rod Demand from Passive Summer" and "Rod Speed" indicators shall be provided in a bar graph format.]

4.2.2.4.3 All Rods Display R642

[A display screen shall be provided which shows all system rod position values simultaneously.]

R643

[The ability to identify a rod position value affected by a faulty analog input shall be provided.]

4-32 Westinghouse Non-Proprietary Class 3

~VNS-DS-OOOO1-WBT-NP, Rev.

WNS-DS-00001-WBT-NP, Rev. 2 2 4-32 Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARPI System Upgrade CERPI S-ystem Requirements Specification R644

["Any Rod On Bottom," "All Rods On Bottom," "Rod-to-Bank Deviation," "Rod-to-Rod Deviation," and "RPI System Trouble" alarm signals shall be displayed on this screen.]

E]

R645 C R646

[The "Rod Demand from Passive Summer" and "Rod Speed" indicators shall be provided in a bar graph format.]

4.2.2.4.4 System Status Display R647

[CPU and 1/O health information for both PLCs shall be on this screen to assist diagnosing and isolating system faults.]

R648

[The display shall show the Main Oscillator Failure, Backup Oscillator Failure, Heartbeat Alarm, RDTC Failure, Power Supply Failure, and ICS Data Link Failure status bits]

R649 C (Last Page of Section 4)

WNS-DS-00001-WBT-NP, Rev. 2 4-33 Westinghouse Non-Proprietary Class 3

Watts Bar Unit 2 ARPI System Upgrade CERPI System Requirements Specification_

SECTION 5 BLOCK DIAGRAMS 5.1 CORE MAP[ IC C Figure 5.1-1. 1 lC (Last Page of Section 5)

WNS-DS-00001-WBT-NP, Rev. 2 5-1 Westinghouse Non-Proprietary Class 3

Attachment 6 TVA Letter Dated November 5, 2010 Description of Commitments and Requested Vendor Documents Application For Withholding Proprietary Information From Public Disclosure WNS-DS-00001-WBT-P, Revision2, "Watts Bar Unit 2 ARPI System Upgrade, CERPI System Requirements Specification," (Proprietary), CAW-10-2981, dated October 8, 2010

Westinghouse Westinghouse Electric Company Nuclear Services P.O. Box 355 Pittsburgh, Pennsylvania 15230-0355 USA U.S. Nuclear Regulatory Commission Direct tel: (412) 374-4643 Document Control Desk Direct fax. (412) 374-3846 Washington, DC 20555-0001 e-mail: greshaja@westinghouse.com Proj:letter: WBT-D-2487 CAW-10-2981 October 8, 2010 APPLICATION FOR WITHHOLDING PROPRIETARY INFORMATION FROM PUBLIC DISCLOSURE

Subject:

WNS-DS-0000 I-WBT-P, Rev. 2, "Watts Bar Unit 2 ARPI System Upgrade, CERPI System Requirements Specification" (Proprietary)

The proprietary information for which withholding is being requested in the above-referenced report is further identified in Affidavit CAW- 10-2981 signed by the owner of the proprietary information, Westinghouse Electric Company LLC. The affidavit, which accompanies this letter, sets forth the basis on which the information may be withheld from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)X4) of 10 CFR Section 2.390 of the Commission's regulations.

Accordingly, this letter authorizes the utilization of the accompanying affidavit by Tennessee Valley Authority.

Correspondence with respect to the proprietary aspects of the application for withholding or the Westinghouse affidavit should reference this letter, CAW- 10-2981, and should be addressed to J. A. Gresham, Manager, Regulatory Compliance and Plant Licensing, Westinghouse Electric Company LLC, P.O. Box 355, Pittsburgh, Pennsylvania 15230-0355.

Very truly yours,

/fJ. A. Gresham, Manager Regulatory Compliance and Plant Licensing Enclosures

CAW-10-2981 AFFIDAVIT COMMONWEALTH OF PENNSYLVANIA:

ss COUNTY OF ALLEGHENY:

Before me, the undersigned authority, personally appeared J. A. Gresham, who, being by me duly sworn according to law, deposes and says that he is authorized to execute this Affidavit on behalf of Westinghouse Electric Company LLC (Westinghouse), and that the averments of fact set forth in this Affidavit are true and correct to the best of his knowledge, information, and belief:

. A. Gresham, Manager Regulatory Compliance and Plant Licensing Sworn to and subscribed before me this 8th day of October 2010 Notary Public COMMONWEALTH OF PENNSYLVANLA Notafal Seal Cynthia Oley, Notary Putdic Manor Boro, Westmoreland County My Cmmsoblr July 16, 2014 Member. Pennsvtvanla Association of Notaries

2 CAW- 10-2981 (1) I am Manager, Regulatory Compliance and Plant Licensing, in Nuclear Services, Westinghouse Electric Company LLC (Westinghouse), and as such, I have been specifically delegated the function of reviewing the proprietary information sought to be withheld from public disclosure in connection with nuclear power plant licensing and rule making proceedings, and am authorized to apply for its withholding on behalf of Westinghouse.

(2) 1 am making this Affidavit in conformance with the provisions of 10 CFR Section 2.390 of the Commission's regulations and in conjunction with the Westinghouse Application for Withholding Proprietary Information from Public Disclosure accompanying this Affidavit.

(3) 1 have personal knowledge of the criteria and procedures utilized by Westinghouse in designating information as a trade secret, privileged or as confidential commercial or financial information.

(4) Pursuant to the provisions of paragraph (b)(4) of Section 2.390 of the Commission's regulations, the following is furnished for consideration by the Commission in determining whether the information sought to be withheld from public disclosure should be withheld.

(i) The information sought to be withheld from public disclosure is owned and has been held in confidence by Westinghouse.

(ii) The information is of a type customarily held in confidence by Westinghouse and not customarily disclosed to the public. Westinghouse has a rational basis for determining the types of information customarily held in confidence by it and, in that connection, utilizes a system to determine when and whether to hold certain types of information in confidence. The application of that system and the substance of that system constitutes Westinghouse policy and provides the rational basis required.

Under that system, information is held in confidence if it falls in one or more of several types, the release of which might result in the loss of an existing or potential competitive advantage, as follows:

(a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of

3 CAW-10-2981 Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.

(b) It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved marketability.

(c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.

(d) It reveals cost or price information, production capacities, budget levels, or commercial strategies of Westinghouse, its customers or suppliers.

(e) It reveals aspects of past, present, or future Westinghouse or customer funded development plans and programs of potential commercial value to Westinghouse.

(f) It contains patentable ideas, for which patent protection may be desirable.

There are sound policy reasons behind the Westinghouse system which include the following:

(a) The use of such information by Westinghouse gives Westinghouse a competitive advantage over its competitors. It is, therefore, withheld from disclosure to protect the Westinghouse competitive position.

(b) It is information that is marketable in many ways, The extent to which such information is available to competitors diminishes the Westinghouse ability to sell products and services involving the use of the information.

(c) Use by our competitor would put Westinghouse at a competitive disadvantage by reducing his expenditure of resources at our expense.

4 CAW- 10-2981 (d) Each component of proprietary information pertinent to a particular competitive advantage is potentially as valuable as the total competitive advantage. If competitors acquire components of proprietary information, any one component.

may be the key to the entire puzzle, thereby depriving Westinghouse of a competitive advantage.

(e) Unrestricted disclosure would jeopardize the position of prominence of Westinghouse in the world market, and thereby give a market advantage to the competition of those countries.

(f) The Westinghouse capacity to invest corporate assets in research and development depends upon the success in obtaining and maintaining a competitive advantage.

(iii) The information is being transmitted to the Commission in confidence and, under the provisions of 10 CFR Section 2.390; it is to be received in confidence by the Commission.

(iv) The information sought to be protected is not available in public sources or available information has not been previously employed in the same original manner or method to the best of our knowledge and belief.

(v) The proprietary information sought to be withheld in this submittal is that which is appropriately marked in WNS-DS-00001 -WBT-P, Rev. 2, "Watts Bar Unit 2 ARPI System Upgrade, CERPI System Requirements Specification," (Proprietary) dated June 2009, for submittal to the Commission, being transmitted by Tennessee Valley Authority letter and Application for Withholding Proprietary Information from Public Disclosure, to the Document Control Desk. The proprietary information as submitted by Westinghouse is that associated with CERPI System Requirements Specification for Watts Bar Unit 2 and may be used only for that purpose.

5 CAW- 10-2981 This information is part of that which will enable Westinghouse to:

(a) Provide environmental and seismic qualification testing to Westinghouse customers.

Further this information has substantial commercial value as follows:

(a) Westinghouse plans to sell the use of similar information to its customers.

(b) Westinghouse can sell support and defense of licensing of the CERPI system.

(c) The information requested to be withheld reveals the distinguishing aspects of a methodology which was developed by Westinghouse.

Public disclosure of this proprietary infonnation is likely to cause substantial harm to the competitive position of Westinghouse because it would enhance the ability of competitors to provide similar evaluations/test reports and licensing defense services for commercial power reactors without commensurate expenses. Also, public disclosure of the information' would enable others to use the information to meet NRC requirements for licensing documentation without purchasing the right to use the information.

The development of the technology described in part by the information is the result of applying the results of many years of experience in an intensive Westinghouse effort and the expenditure of a considerable sum of money.

In order for competitors of Westinghouse to duplicate this information, similar technical programs would have to be performed and a significant manpower effort, having the requisite talent and experience, would have to be expended.

Further the deponent sayeth not.

PROPRIETARY INFORMATION NOTICE Transmitted herewith are proprietary and/or non-proprietary versions of documents furnished to the NRC in connection with requests for generic and/or plant-specific review and approval.

In order to conform to the requirements of 10 CFR 2.390 of the Commission's regulations concerning the protection of proprietary information so submitted to the NRC, the information which is proprietary in the proprietary versions is contained within brackets, and where the proprietary information has been deleted in the non-proprietary versions, only the brackets remain (the information that was contained within the brackets in the proprietary versions having been deleted). The justification for claiming the information so designated as proprietary is indicated in both versions by means of lower case letters (a) through (f) located as a superscript immediately following the brackets enclosing each item of information being identified as proprietary or in the margin opposite such information. These lower case letters refer to the types of information Westinghouse customarily holds in confidence identified in Sections (4)(ii)(a) through (4)(ii)(f) of the affidavit accompanying this transmittal pursuant to 10 CFR 2.390(b)(1).

COPYRIGHT NOTICE The reports transmitted herewith each bear a Westinghouse copyright notice. The NRC is permitted to make the number of copies of the information contained in these reports which are necessary for its internal use in connection with generic and plant-specific reviews and approvals as well as the issuance, denial, amendnent, transfer, renewal, modification, suspension, revocation, or violation of a license, permit, order, or regulation subject to the requirements of 10 CFR 2.390 regarding restrictions on public disclosure to the extent such information has been identified as proprietary by Westinghouse, copyright protection notwithstanding. With respect to the non-proprietary versions of these reports, the NRC is permitted to make the number of copies beyond those necessary for its internal use which are necessary in order to have one copy available for public viewing in the appropriate docket files in the public document room in Washington, DC and in local public document rooms as may be required by NRC regulations if the number of copies submitted is insufficient for this purpose. Copies made by the NRC must include the copyright notice in all instances and the proprietary notice if the original was identified as proprietary.

Tennessee Valley Authority Letter for Transmittal to the NRC The following paragraphs should be included in your letter to the NRC:

Enclosed are:

1. 2 copies ofWNS-DS-00001-WBT-P, Rev. 2, "Watts Bar Unit 2 ARPI System Upgrade, CERPI System Requirements Specification," (Proprietary)
2. 2 copies ofWNS-DS-00001-WBT-NP, Rev. 2, "Watts Bar Unit 2 ARPI System Upgrade, CERPI System Requirements Specification," (Non-Proprietary)

Also enclosed is the Westinghouse Application for Withholding Proprietary Information from Public Disclosure CAW- 10-2981, accompanying Affidavit, Proprietary Information Notice, and Copyright Notice.

As Item I contains information proprietary to Westinghouse Electric Company LLC, it is supported by an affidavit signed by Westinghouse, the owner of the information. The affidavit sets forth the basis on which the information may be withheld from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)(4) of Section 2.390 of the Commission's regulations.

Accordingly, it is respectfully requested that the information which is proprietary to Westinghouse be withheld from public disclosure in accordance with 10 CFR Section 2.390 of the Commission's regulations.

Correspondence with respect to the copyright or proprietary aspects of the items listed above or the supporting Westinghouse affidavit should reference CAW-10-2981 and should be addressed to J. A. Gresham, Manager, Regulatory Compliance and Plant Licensing, Westinghouse Electric Company LLC, P.O. Box 355, Pittsburgh, Pennsylvania 15230-0355.

Attachment 8 TVA Letter Dated November 5, 2010 Description of Commitments and Requested Vendor Documents Westinghouse Document: RRAS, Watts Bar NSSS Completion I&C Projects, Eagle 21 Factory Acceptance Test Specification, WNA-DS-01963-WBTNP-Excerpt, Revision 0, Westinghouse Proprietary Class 3,* Section 7, Cabinet Specific FAT Test Requirements, page 7-1

RRAS Eagle 21 Factory Watts Bar Unit 2 NSSS Completion I&C Projects Acceptance Test Specifications SECTION 7 CABINET SPECIFIC FAT TEST REQUIREMENTS Cabinet 1 Test Name Test Type

1. E21-INT-001t II. [ ]I' Tests A. [ ]a~c Tests
1. E21-TSP-300

]a,C B. [

1. E21-CAL-003 c.- [ I . ]a"*

Tests Test Type

1. E21 -SRV-205 F-414 [ ,c Standard
2. E21-SRV-205 F-434 [ ]',c Standard
3. E21-SRV-211 L-459 [ ]aC Standard
4. E2 I-SRV-205 F-444 [ ]a. Standard
5. E21-SRV-205 F-424 [ ],x Standard
6. E21-SRV-210 P455 [ ],c Standard L/L III. [ ]" Tests
1. E21-CON-205 F-414 [ ]ac Standard
2. E21-CON-205 F-434 [ ]ac Standard
3. E21-CON-211 L-459 [ Standard
4. E21-CON-205 F-444 [ ]'c Standard
5. E21-CON-205 F-424 [ ]"' Standard
6. E21-CON-210 P-455 [ ]8,C Standard L/L WNA-DS-01963-WBT NP-Excerpt, Rev. 0 7-1 Westinghouse Non Proprietary Class 3

Attachment 9 TVA Letter Dated November 5, 2010 Description of Commitments and Requested Vendor Documents Application For Withholding Proprietary Information From Public Disclosure, WNA-DS-01963-WBT P-Excerpt, Revision 0 from "RRAS Watts Bar Unit 2 NSSS Completion I&C Projects, Eagle 21 Factory Acceptance Test Specification" (Proprietary), CAW-10-2967, dated October 25, 2010

Westinghouse Nuclear ServicesElectric Company Westinghouse P.O. Box 355 Pittsburgh, Pennsylvania 15230-0355 USA U.S. Nuclear Regulatory Commission Direct tel: (412) 374-4643 Document Control Desk Direct fax: (412) 374-3846 Washington, DC 20555-0001 e-mail: greshaja@westinghouse.com Proj letter: WBT-D-2439 CAW-10-2967 October 25, 2010 APPLICATION FOR WITHHOLDING PROPRIETARY INFORMATION FROM PUBLIC DISCLOSURE

Subject:

WNA-DS-01963-WBT P-Excerpt, Rev. 0 from "RRAS Watts Bar Unit 2 NSSS Completion I&C Projects, Eagle 21 Factory Acceptance Test Specification" (Proprietary)

The proprietary information for which withholding is being requested in the above-referenced document is further identified in Affidavit CAW-10-2967 signed by the owner of the proprietary information, Westinghouse Electric Company LLC. The affidavit, which accompanies this letter, sets forth the basis on which the information may be withheld from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)(4) of 10 CFR Section 2.390 of the Commission's regulations.

Accordingly, this letter authorizes the utilization of the accompanying affidavit by Tennessee Valley Authority.

Correspondence with respect to the proprietary aspects of the application for withholding or the Westinghouse affidavit should reference this letter, CAW-10-2967, and should be addressed to J. A. Gresham, Manager, Regulatory Compliance and Plant Licensing, Westinghouse Electric Company LLC, P.O. Box 355, Pittsburgh, Pennsylvania 15230-0355.

Very truly yours, J. A. Gresh , ager Regulatory Compliance and Plant Licensing Enclosures

CAW- 10-2967 AFFIDAVIT COMMONWEALTH OF PENNSYLVANIA:

ss COUNTY OF ALLEGHENY:

Before me, the undersigned authority, personally appeared H. A. Sepp, who, being by me duly sworn according to law, deposes and says that he is authorized to execute this Affidavit on behalf of Westinghouse Electric Company LLC (Westinghouse), and that the averments of fact set forth in this Affidavit are true and correct to the best of his knowledge, information, and belief:

H. A. Sepp, Direc r Safety Analysis and Licensing Sworn to and subscribed before me this 25th day of October 2010 Ntary Public 0 COMMONWEALTH OF PENNSYLVANIA Notarial Seal Cynthia Olesky, Notary Public manor Boro, Westmoreland County My CcmmlSlon Expires July 16, 2014 perlbr., Pennrwvanlla AmsodatIon of Notaries

2 CAW- 10-2967 (1) I am Director, Safety Analysis and Licensing, in Nuclear Services, Westinghouse Electric Company LLC (Westinghouse), and as such, I have been specifically delegated the function of reviewing the proprietary information sought to be withheld from public disclosure in connection with nuclear power plant licensing and rule making proceedings, and am authorized to apply for its withholding on behalf of Westinghouse.

(2) 1 am making this Affidavit in conformance with the provisions of 10 CFR Section 2.390 of the Commission's regulations and in conjunction with the Westinghouse Application for Withholding Proprietary Information from Public Disclosure accompanying this Affidavit.

(3) I have personal knowledge of the criteria and procedures utilized by Westinghouse in designating information as a trade secret, privileged or as confidential commercial or financial information.

(4) Pursuant to the provisions of paragraph (b)(4) of Section 2.390 of the Commission's regulations, the following is furnished for consideration by the Commission in determining whether the information sought to be withheld from public disclosure should be withheld.

(i) The information sought to be withheld from public disclosure is owned and has been held in confidence by Westinghouse.

(ii) The information is of a type customarily held in confidence by Westinghouse and not customarily disclosed to the public. Westinghouse has a rational basis for determining the types of information customarily held in confidence by it and, in that connection, utilizes a system to determine when and whether to hold certain types of information in confidence. The application of that system and the substance of that system constitutes Westinghouse policy and provides the rational basis required.

Under that system, information is held in confidence if it falls in one or more of several types, the release of which might result in the loss of an existing or potential competitive advantage, as follows:

(a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of

3 CAW- 10-2967 Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.

(b) It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved marketability.

(c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.

(d) It reveals cost or price information, production capacities, budget levels, or commercial strategies of Westinghouse, its customers or suppliers.

(e) It reveals aspects of past, present, or future Westinghouse or customer funded development plans and programs of potential commercial value to Westinghouse.

(f) It contains patentable ideas, for which patent protection may be desirable.

There are sound policy reasons behind the Westinghouse system which include the following:

(a) The use of such information by Westinghouse gives Westinghouse a competitive advantage over its competitors. It is, therefore, withheld from disclosure to protect the Westinghouse competitive position.

(b) It is information that is marketable in many ways. The extent to which such information is available to competitors diminishes the Westinghouse ability to sell products and services involving the use of the information.

(c) Use by our competitor would put Westinghouse at a competitive disadvantage by reducing his expenditure of resources at our expense.

4 CAW-10-2967 (d) Each component of proprietary information pertinent to a particular competitive advantage is potentially as valuable as the total competitive advantage. If competitors acquire components of proprietary information, any one component may be the key to the entire puzzle, thereby depriving Westinghouse of a competitive advantage.

(e) Unrestricted disclosure would jeopardize the position of prominence of Westinghouse in the world market, and thereby give a market advantage to the competition of those countries.

(f) The Westinghouse capacity to invest corporate assets in research and development depends upon the success in obtaining and maintaining a competitive advantage.

(iii) The information is being transmitted to the Commission in confidence and, under the provisions of 10 CFR Section 2.390; it is to be received in confidence by the Commission.

(iv) The information sought to be protected is not available in public sources or available information has not been previously employed in the same original manner or method to the best of our knowledge and belief.

(v) The proprietary information sought to be withheld in this submittal'is that which is appropriately marked in WNA-DS-0 I 963-WBT P-Excerpt, Rev. 0 from "RRAS Watts Bar Unit 2 NSSS Completion I&C Projects, Eagle 21 Factory Acceptance Test Specification" (Proprietary) for submittal to the Commission, being transmitted by Tennessee Valley Authority letter and Application for Withholding Proprietary Information from Public Disclosure, to the Document Control Desk. The proprietary information as submitted by Westinghouse is that associated with the Watts Bar Unit 2 Eagle 21 System and may be used only for that purpose.

This information is part of that which will enable Westinghouse to.

(a) Perform equipment tests to ensure safe operation of the Reactor Coolant System.

5 CAW-10-2967 (b) Allow Westinghouse to support and sell Licensing activities.

(c) Ensure proper system configuration for safe and reliable operation.

Further this information has substantial commercial value as follows:

(a) Westinghouse plans to sell the use of similar information to its customers for purpose of safety related control systems.

(b) Westinghouse can sell support and defense of plant licensing.

(c) The information requested to be withheld reveals the distinguishing aspects of a methodology which was developed by Westinghouse.

Public.disclosure of this proprietary information is likely to cause substantial harm to the competitive position of Westinghouse because it would enhance the ability of competitors to provide similar test procedures and licensing defense services for commercial power reactors without commensurate expenses. Also, public disclosure of the information would enable others to use the information to meet NRC requirements for licensing documentation without purchasing the right to use the information.

The development of the technology described in part by the information is the result of applying the results of many years of experience in an intensive Westinghouse effort and the expenditure of a considerable sum of money.

In order for competitors of Westinghouse to duplicate this information, similar technical programs would have to be performed and a significant manpower effort, having the requisite talent and experience, would have to be expended.

Further the deponent sayeth not.

PROPRIETARY INFORMATION NOTICE Transmitted herewith are proprietary and/or non-proprietary versions of documents furnished to the NRC in connection with requests for generic and/or plant-specific review and approval.

In order to conform to the requirements of 10 CFR 2.390 of the Commission's regulations concerning the protection of proprietary information so submitted to the NRC, the information which is proprietary in the proprietary versions is contained within brackets, and where the proprietary information has been deleted in the non-proprietary versions, only the brackets remain (the information that was contained within the brackets in the proprietary versions having been deleted). The justification for claiming the information so designated as proprietary is indicated in both versions by means of lower case letters (a) through (f) located as a superscript immediately following the brackets enclosing each item of information being identified as proprietary or in the margin opposite such information. These lower case letters refer to the types of information Westinghouse customarily holds in confidence identified in Sections (4)(ii)(a) through (4)(ii)(f) of the affidavit accompanying this transmittal pursuant to 10 CFR 2.390(b)(1).

COPYRIGHT NOTICE The reports transmitted herewith each bear a Westinghouse copyright notice. The NRC is permitted to make the number of copies of the information contained in these reports which are necessary for its internal use in connection with generic and plant-specific reviews and approvals as well as the issuance, denial, amendment, transfer, renewal, modification, suspension, revocation, or violation of a license, permit, order, or regulation subject to the requirements of 10 CFR 2.390 regarding restrictions on public disclosure to the extent such information has been identified as proprietary by Westinghouse, copyright protection notwithstanding. With respect to the non-proprietary versions of these reports, the NRC is permitted to make the number of copies beyond those necessary for its internal use which are necessary in order to have one copy available for public viewing in the appropriate docket files in the public document room in Washington, DC and in local public document rooms as may be required by NRC regulations if the number of copies submitted is insufficient for this purpose. Copies made by the NRC must include the copyright notice in all instances and the proprietary notice if the original was identified as proprietary.

Tennessee Valley Authority Letter for Transmittal to the NRC The following paragraphs should be included in your letter to the NRC:

Enclosed are:

I. - copies of WNA-DS-01963-WBT P-Excerpt, Rev. 0 from "RRAS Watts Bar Unit 2 NSSS Completion I&C Projects, Eagle 21 Factory Acceptance Test Specification" (Proprietary)

2. _ copies ofWNA-DS-01963-WBT NP-Excerpt, Rev. 0 from "RRAS Watts BarUnit 2 NSSS Completion I&C Projects, Eagle 21 Factory Acceptance Test Specification" (Non-Proprietary)

Also enclosed is the Westinghouse Application for Withholding Proprietary Information from Public Disclosure CAW-10-2967, accompanying Affidavit, Proprietary Information Notice, and Copyright Notice.

As Item I contains information proprietary to Westinghouse Electric Company LLC, it is supported by an affidavit signed by Westinghouse, the owner of the information. The affidavit sets forth the basis on which the information may be withheld from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)(4) of Section 2.390 of the Commission's regulations.

Accordingly, it is respectfully requested that the information which is proprietary to Westinghouse be withheld from public disclosure in accordance with 10 CFR Section 2.390 of the Commission's regulations.

Correspondence with respect to the copyright or proprietary aspects of the items listed above or the supporting Westinghouse affidavit should reference CAW-10-2967 and should be addressed to J. A. Gresham, Manager, Regulatory Compliance and Plant Licensing, Westinghouse Electric Company LLC, P.O. Box 355, Pittsburgh, Pennsylvania 15230-0355.

Enclosure 2 TVA Letter Dated November 5, 2010 Regulatory Commitments

1. The AAF definition will be revised in FSAR Amendment 102 to read:

"A tolerance band on either side of the NTSP which defines the limits of acceptable instrument performance, beyond which the channel may be considered degraded and must be evaluated for operability prior to returning it to service. Channels which exceed the AAF will be entered into the Corrective Action Program for further evaluation and trending. The Acceptable As Found tolerance is the SRSS combination of drift, maintenance and test equipment (M&TE) accuracy and readability, and calibration/reference accuracy. Other uncertainties may be included in the AAF if applicable."

This revision eliminates the concern regarding uncertainties. Attachment 3 contained in the October 29, 2010 letter provided the revised FSAR Section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.

2. The AAL definition will be revised in FSAR Amendment 102 to read:

"A tolerance band on either side of the NTSP within which an instrument or instrument loop is left after calibration or setpoint verification. The Acceptable As Left tolerance is equal to or less than the SRSS combination of reference accuracy, M&TE accuracy and M&TE readability. Other uncertainties may be included in the AAL if applicable."

This revision eliminates the concern regarding calibration history. Attachment 3 contained in the October 29, 2010 letter provided the revised FSAR Section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.