Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML091760126 | 25 June 2009 | Acknowledgement of Acceptance Review K-infinity LAR | |
ML091810934 | 16 June 2009 | Hand-outs for June 16, 2009 Public Meeting with Exelon | |
ML091740446 | 12 June 2009 | Response to Request for Additional Information - Revision to Technical Specification 4.3.1.1a Concerning K-infinity | B.5.b Mitigating Strategies |
ML110691132 | 11 June 2009 | E-mail from B. Metzger, NRR to D. Frumkin, NRR on Distribution of OMAs | |
ML091490142 | 9 June 2009 | Notice of Meeting with Exelon Generation Company on Licensing Practices and Processes | |
ML091560130 | 5 June 2009 | NRC Office of Investigations Report Nos. 1-2008-023, 1-2008-044: Peach Bottom/Exelon Pec Letter EA-09-007, EA-09-059 | |
RS-09-070, Comment (12) of Darin M. Benyak, on Behalf of Exelon Generation Company, LLC, on ANPR 171, Variable Annual Fee Structure for Power Reactors | 3 June 2009 | Comment (12) of Darin M. Benyak, on Behalf of Exelon Generation Company, LLC, on ANPR 171, Variable Annual Fee Structure for Power Reactors | Exemption Request |
ML091740445 | 28 May 2009 | NET-264-03, Revision 1, Characterization of Boraflex Panel Degradation in the Peach Bottom Unit 2 Spent Fuel Pool Projected to May 2010 (Non-Proprietary Version) | |
ML110691285 | 22 May 2009 | E-mail from D. Frumkin, NRR to B. Metzger, NRR FW: Support for Manual Action Exemption Reviews | |
ML091740447 | 15 May 2009 | Report No. NET-264-02 Np, Criticality Analysis of the Peach Bottom Spent Fuel Racks for Gnf 2 Fuel with Boraflex Panel Degradation Projected to May 2010 | B.5.b Mitigating Strategies |
ML091390297 | 15 May 2009 | Submittal of Registration for Independent Spent Fuel Storage Installation (ISFSI) Casks #42, #43 and #44 | |
IR 05000277/2009002 | 12 May 2009 | IR 05000277-09-002, 05000278-09-002; on 01/01/2009 - 03/31/2009; Peach Bottom Atomic Power Station (Pbaps), Units 2 and 3; Maintenance Risk Assessments and Emergent Work Control; Operability Evaluations; Permanent Plant Modifications | High winds Fire Barrier Water Inventory Control Internal Flooding Enforcement Discretion Functionality Assessment Aging Management Significance Determination Process Job Performance Measure Operability Determination License Renewal Downpower Unidentified leakage Siren |
ML091350043 | 8 May 2009 | Decommissioning Status Report | |
ML091280686 | 7 May 2009 | Response to Request for Additional Information - License Amendment Request to Incorporate Previously NRC-Approved TSTFs and Other Administrative Technical Specifications Changes - TSTF-363-A | Post Accident Monitoring |
IR 05000277/2009006 | 5 May 2009 | IR 05000277-09-006, 05000278-09-006, on 03/16/2009-04/03/2009, Exelon Generation Company LLC, Peach Bottom Atomic Power Station. Triennial Fire Protection Team Inspection | Hot Short Safe Shutdown Reactor Vessel Water Level Fire Barrier Emergency Lighting Fire Protection Program |
ML091270073 | 1 May 2009 | Transmittal of Annual Radiological Environmental Operating Report No. 66, January 1, 2008 Through December 31, 2008 | Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report |
ML090710330 | 30 April 2009 | Corp., Request for Withholding Information from Public Disclosure | |
ML091270075 | 30 April 2009 | Annual Radiological Environmental Operating Report No. 66, 1 January 2008 Through 31 December 2008 | Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report |
ML091250437 | 27 April 2009 | Offsite Dose Calculation Manual Revision 13 | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Power change |
ML091250436 | 27 April 2009 | . Independent Spent Fuel Storage Installation, Radioactive Effluent Release Report No. 51, January 1, 2008 Through December 31, 2008 | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program |
ML091250434 | 27 April 2009 | Independent Spent Fuel Storage Installation, Radioactive Effluent Release Report 51 January 1, 2008 Through December 31, 2008 | Offsite Dose Calculation Manual |
ML091250376 | 27 April 2009 | Radiation Dose Assessment Report 24, January 1, 2008 Through December 31, 2008 | Offsite Dose Calculation Manual |
RS-09-052, Submittal of Revision to Nuclear Station Security Plans, Training and Qualification Plans, and Safeguards Contingency Plans | 27 April 2009 | Submittal of Revision to Nuclear Station Security Plans, Training and Qualification Plans, and Safeguards Contingency Plans | |
ML091130617 | 24 April 2009 | Biweekly Notice, Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations | Safe Shutdown Fitness for Duty Shutdown Margin Post Accident Monitoring |
ML091280607 | 17 April 2009 | Submittal of Changes to Technical Specifications Bases, Including Changes Through 04/08/2009 | |
ML091280608 | 17 April 2009 | Changes to Technical Specifications Bases, Including Changes Through 04/08/2009 | Safe Shutdown Unanalyzed Condition Shutdown Margin Reactor Vessel Water Level High Radiation Area Grab sample Offsite Dose Calculation Manual Stroke time Post Accident Monitoring Hydrostatic Squib Qualified Offsite Circuit Missed surveillance Abnormal operational transient Scram Discharge Volume Feedwater Controller Failure Spiral reload Battery sizing Overtravel Power Operated Valves Fuel cladding Pressure Boundary Leakage Recently irradiated fuel Offsite Circuit Grace period Power change Coast down Unidentified leakage |
ML091280609 | 17 April 2009 | Changes to Technical Specifications Bases, Including Changes Through 04/08/2009 | |
ML091060315 | 14 April 2009 | Annual Assessment Meeting: NRC and Exelon Slides and Sign-in Sheets, 4/14/09 | Inattentive |
ML11228A230 | 14 April 2009 | State-of-the-Art Reactor Consequence Analyses; Semi-Annual Briefing for Commission Technical Assistants | B.5.b Mitigating Strategies |
Press Release-I-09-020, NRC to Hold Public Meeting on April 14 in Delta, Pa., to Discuss Annual Assessment of Peach Bottom Nuclear Power Plant | 7 April 2009 | Press Release-I-09-020: NRC to Hold Public Meeting on April 14 in Delta, Pa., to Discuss Annual Assessment of Peach Bottom Nuclear Power Plant | |
ML090970291 | 2 April 2009 | Revision D to Emergency Plan Implementing Procedure EP-AA-113-F-08, PBAPS Assembly, Accountability and Evacuation Guidelines | |
ML090920256 | 1 April 2009 | Annual Property Insurance Status Report |