ML09166013130 June 2009Request to Use an Assigned Protection Factor with French-Designed Air-Line Respirator EquipmentMururoa
NL-09-1047, Fourth Ten-Year Interval Inservice Testing Program - RR-P-330 June 2009Fourth Ten-Year Interval Inservice Testing Program - RR-P-3
ML09173007529 June 2009(Fnp), Units 1 and 2, Evaluation of Third 10-Year Interval Inservice Inspection Program Plan Requests for ReliefNondestructive Examination
VT-2
Incorporated by reference
Liquid penetrant
Dissimilar Metal Weld
ML09180045329 June 2009Meeting Announcement - Category 2 Public Meeting, 2009 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Development WorkshopLicense Renewal
ML09173013225 June 200906/07-11/2009-Report on Trip to the Institute of Electrical and Electronics Engineers Stationary Battery Committee Meeting in Rohnert Park, CAArc flash
ML09161052717 June 2009Public Letter for the Dam Safety and Operation Inspection Report
NL-09-0828, Response to Preliminary White Finding for Tone Alert Radios15 June 2009Response to Preliminary White Finding for Tone Alert RadiosSignificance Determination Process
Preliminary White Finding
ML0835203169 June 2009Request Westinghouse Electric Company Withholding Information from Public Disclosure
TAC:MD70999 June 2009
NL-09-0899, Generic Letter 2004-02 Extension Request - Request for Additional Information3 June 2009Generic Letter 2004-02 Extension Request - Request for Additional Information
ML09148010028 May 2009Initial Exam 2008-301 Draft Administrative DocumentsBoric Acid
ML09148010228 May 2009Initial Exam 2008-301 Draft RO Written ExamBoric Acid
Shutdown Margin
Hydrostatic
ML09148019928 May 2009Initial Exam 2008-301 Final Sim/In-Plant JPMsBoric Acid
Shutdown Margin
ML09148017228 May 2009Initial Exam 2008-301 Final Simulator Exam ScenarioBoric Acid
High winds
Shutdown Margin
Grab sample
Power change
ML09148015628 May 2009Initial Exam 2008-301 Final Administrative DocumentsBoric Acid
Job Performance Measure
ML09148014328 May 2009Initial Exam 2008-301 Final Administrative JPMsBoric Acid
High Radiation Area
Stroke time
Met Tower
Locked High Radiation Area
Pressure Boundary Leakage
ML09148012328 May 2009Initial Exam 2008-301 Draft Administrative JPMs
ML09148011428 May 2009Initial Exam 2008-301 Draft Sim/In-Plant JPMsBoric Acid
Shutdown Margin
ML09148010728 May 2009Initial Exam 2008-301 Draft Simulator ScenariosBoric Acid
High winds
Shutdown Margin
Grab sample
Power change
ML09148010428 May 2009Initial Exam 2008-301 Draft SRO Written ExamBoric Acid
Grab sample
Offsite Dose Calculation Manual
ML09147053327 May 2009E-Mail on Acceptance Review for Farley, Hatch, Vogtle Amendment on Deleting Working Hour Restrictions
ML09147031027 May 2009E-mail Acceptance of Farley Relief Request Dated April 22, 2009
TAC:ME112427 May 2009
TAC:ME112127 May 2009
ND-09-0825, Comment (6) of Charles R. Pierce on Behalf of Southern Nuclear Operating Company, Inc., on Draft Regulatory Guide DG-1218 Risk-Informed, Performance-Based Fire Protection for Existing Light-Water Nuclear Power Plants.22 May 2009Comment (6) of Charles R. Pierce on Behalf of Southern Nuclear Operating Company, Inc., on Draft Regulatory Guide DG-1218 Risk-Informed, Performance-Based Fire Protection for Existing Light-Water Nuclear Power Plants.Fire Protection Program
NL-09-0172, License Amendment Request for Adoption of TSTF-511, Rev. 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 2619 May 2009License Amendment Request for Adoption of TSTF-511, Rev. 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26Incorporated by reference
TAC:ME135119 May 2009
IR 05000348/200950218 May 2009IR 05000348-09-502 and 05000364-09-502; 03/06/2008 - 04/20/2009; Joseph M. Farley Nuclear Plant, Units 1 and 2; Event Follow-upSignificance Determination Process
Preliminary White Finding
Siren
NL-09-0775, Annual Radiological Environmental Operating Reports for 200814 May 2009Annual Radiological Environmental Operating Reports for 2008Grab sample
Offsite Dose Calculation Manual
Met Tower
Annual Radiological Environmental Operating Report
Chernobyl
ML0909209434 May 2009Edwin I Hatch Nuclear Plant, Units 1 and 2 - Project Manager and Backup Reassignment
IR 05000348/200900230 April 2009IR 05000348-09-002 and 05000364-09-002; 01/01/2009 - 03/31/2009; Joseph M. Farley Nuclear Plant, Units 1 and 2; Post Maintenance TestingFire Barrier
Internal Flooding
Functionality Assessment
Significance Determination Process
Job Performance Measure
Operability Determination
Incremental Core Damage Probability Deficit
Power change
NL-08-0623, Annual Submission Reports27 April 2009Annual Submission ReportsEarthquake
Pandemic
ML09126069127 April 2009Annual Radioactive Effluent Release Reports for 2008, Enclosure 4 Farley Offsite Dose Calculation Manual (ODCM) - Version 23 and Vogtle ODCM - Version 24Grab sample
Offsite Dose Calculation Manual
Met Tower
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Power change
ML09126068927 April 2009Annual Radioactive Effluent Release Reports for 2008Grab sample
Offsite Dose Calculation Manual
Hydrostatic
Annual Radioactive Effluent Release Report
Process Control Program
NL-09-0661, Annual Radioactive Effluent Release Reports for 2008 - Cover Letter27 April 2009Annual Radioactive Effluent Release Reports for 2008 - Cover LetterOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
NL-09-0587, Response to Request for Additional Information Regarding Proposed Relief Requests for the Third Lsi Interval24 April 2009Response to Request for Additional Information Regarding Proposed Relief Requests for the Third Lsi IntervalNondestructive Examination
Dissimilar Metal Weld
NL-09-0378, Joseph M. Farley Nuclear Plant and Vogtle Electric Generating Plant - Annual Non-Radiological Environmental Operating Report for 200822 April 2009Joseph M. Farley Nuclear Plant and Vogtle Electric Generating Plant - Annual Non-Radiological Environmental Operating Report for 2008
NL-09-0410, Proposed Alternatives for the Fourth ISI Interval22 April 2009Proposed Alternatives for the Fourth ISI IntervalDissimilar Metal Weld
ML09117002915 April 2009Discrimination Against a Southern Nuclear Company HVAC System Engineer for Reporting Nuclear Safety Concerns (OI Report No. 2-2007-037)
NL-09-0302, Cycle 23 Core Operating Limits Report15 April 2009Cycle 23 Core Operating Limits ReportShutdown Margin
IR 05000034/20090069 April 2009IR 0500034-09-006; on 01/26/2009 - 02/27/2009; Joseph M. Farley Nuclear Plant, Units 1 and 2; Component Design Basis InspectionUltimate heat sink
Probabilistic Risk Assessment
Significance Determination Process
Time Critical Operator Action
Battery sizing
Maintenance Rule Program
ML0909210192 April 2009Summary of Public Meeting with Southern Nuclear Operating Company, Inc., to Discuss Nrc'S Reactor Oversight Process (ROP) & Nrc'S Annual Assessment of Plant Safety Performance at Joseph M. Farley for Period of 01/01/2008 - 12/31/2008