Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML091660131 | 30 June 2009 | Request to Use an Assigned Protection Factor with French-Designed Air-Line Respirator Equipment | Mururoa |
NL-09-1047, Fourth Ten-Year Interval Inservice Testing Program - RR-P-3 | 30 June 2009 | Fourth Ten-Year Interval Inservice Testing Program - RR-P-3 | |
ML091730075 | 29 June 2009 | (Fnp), Units 1 and 2, Evaluation of Third 10-Year Interval Inservice Inspection Program Plan Requests for Relief | Nondestructive Examination VT-2 Incorporated by reference Liquid penetrant Dissimilar Metal Weld |
ML091800453 | 29 June 2009 | Meeting Announcement - Category 2 Public Meeting, 2009 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Development Workshop | License Renewal |
ML091730132 | 25 June 2009 | 06/07-11/2009-Report on Trip to the Institute of Electrical and Electronics Engineers Stationary Battery Committee Meeting in Rohnert Park, CA | Arc flash |
ML091610527 | 17 June 2009 | Public Letter for the Dam Safety and Operation Inspection Report | |
NL-09-0828, Response to Preliminary White Finding for Tone Alert Radios | 15 June 2009 | Response to Preliminary White Finding for Tone Alert Radios | Significance Determination Process Preliminary White Finding |
ML083520316 | 9 June 2009 | Request Westinghouse Electric Company Withholding Information from Public Disclosure | |
TAC:MD7099 | 9 June 2009 | ||
NL-09-0899, Generic Letter 2004-02 Extension Request - Request for Additional Information | 3 June 2009 | Generic Letter 2004-02 Extension Request - Request for Additional Information | |
ML091480100 | 28 May 2009 | Initial Exam 2008-301 Draft Administrative Documents | Boric Acid |
ML091480102 | 28 May 2009 | Initial Exam 2008-301 Draft RO Written Exam | Boric Acid Shutdown Margin Hydrostatic |
ML091480199 | 28 May 2009 | Initial Exam 2008-301 Final Sim/In-Plant JPMs | Boric Acid Shutdown Margin |
ML091480172 | 28 May 2009 | Initial Exam 2008-301 Final Simulator Exam Scenario | Boric Acid High winds Shutdown Margin Grab sample Power change |
ML091480156 | 28 May 2009 | Initial Exam 2008-301 Final Administrative Documents | Boric Acid Job Performance Measure |
ML091480143 | 28 May 2009 | Initial Exam 2008-301 Final Administrative JPMs | Boric Acid High Radiation Area Stroke time Met Tower Locked High Radiation Area Pressure Boundary Leakage |
ML091480123 | 28 May 2009 | Initial Exam 2008-301 Draft Administrative JPMs | |
ML091480114 | 28 May 2009 | Initial Exam 2008-301 Draft Sim/In-Plant JPMs | Boric Acid Shutdown Margin |
ML091480107 | 28 May 2009 | Initial Exam 2008-301 Draft Simulator Scenarios | Boric Acid High winds Shutdown Margin Grab sample Power change |
ML091480104 | 28 May 2009 | Initial Exam 2008-301 Draft SRO Written Exam | Boric Acid Grab sample Offsite Dose Calculation Manual |
ML091470533 | 27 May 2009 | E-Mail on Acceptance Review for Farley, Hatch, Vogtle Amendment on Deleting Working Hour Restrictions | |
ML091470310 | 27 May 2009 | E-mail Acceptance of Farley Relief Request Dated April 22, 2009 | |
TAC:ME1124 | 27 May 2009 | ||
TAC:ME1121 | 27 May 2009 | ||
ND-09-0825, Comment (6) of Charles R. Pierce on Behalf of Southern Nuclear Operating Company, Inc., on Draft Regulatory Guide DG-1218 Risk-Informed, Performance-Based Fire Protection for Existing Light-Water Nuclear Power Plants. | 22 May 2009 | Comment (6) of Charles R. Pierce on Behalf of Southern Nuclear Operating Company, Inc., on Draft Regulatory Guide DG-1218 Risk-Informed, Performance-Based Fire Protection for Existing Light-Water Nuclear Power Plants. | Fire Protection Program |
NL-09-0172, License Amendment Request for Adoption of TSTF-511, Rev. 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 | 19 May 2009 | License Amendment Request for Adoption of TSTF-511, Rev. 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 | Incorporated by reference |
TAC:ME1351 | 19 May 2009 | ||
IR 05000348/2009502 | 18 May 2009 | IR 05000348-09-502 and 05000364-09-502; 03/06/2008 - 04/20/2009; Joseph M. Farley Nuclear Plant, Units 1 and 2; Event Follow-up | Significance Determination Process Preliminary White Finding Siren |
NL-09-0775, Annual Radiological Environmental Operating Reports for 2008 | 14 May 2009 | Annual Radiological Environmental Operating Reports for 2008 | Grab sample Offsite Dose Calculation Manual Met Tower Annual Radiological Environmental Operating Report Chernobyl |
ML090920943 | 4 May 2009 | Edwin I Hatch Nuclear Plant, Units 1 and 2 - Project Manager and Backup Reassignment | |
IR 05000348/2009002 | 30 April 2009 | IR 05000348-09-002 and 05000364-09-002; 01/01/2009 - 03/31/2009; Joseph M. Farley Nuclear Plant, Units 1 and 2; Post Maintenance Testing | Fire Barrier Internal Flooding Functionality Assessment Significance Determination Process Job Performance Measure Operability Determination Incremental Core Damage Probability Deficit Power change |
NL-08-0623, Annual Submission Reports | 27 April 2009 | Annual Submission Reports | Earthquake Pandemic |
ML091260691 | 27 April 2009 | Annual Radioactive Effluent Release Reports for 2008, Enclosure 4 Farley Offsite Dose Calculation Manual (ODCM) - Version 23 and Vogtle ODCM - Version 24 | Grab sample Offsite Dose Calculation Manual Met Tower Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Power change |
ML091260689 | 27 April 2009 | Annual Radioactive Effluent Release Reports for 2008 | Grab sample Offsite Dose Calculation Manual Hydrostatic Annual Radioactive Effluent Release Report Process Control Program |
NL-09-0661, Annual Radioactive Effluent Release Reports for 2008 - Cover Letter | 27 April 2009 | Annual Radioactive Effluent Release Reports for 2008 - Cover Letter | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report |
NL-09-0587, Response to Request for Additional Information Regarding Proposed Relief Requests for the Third Lsi Interval | 24 April 2009 | Response to Request for Additional Information Regarding Proposed Relief Requests for the Third Lsi Interval | Nondestructive Examination Dissimilar Metal Weld |
NL-09-0378, Joseph M. Farley Nuclear Plant and Vogtle Electric Generating Plant - Annual Non-Radiological Environmental Operating Report for 2008 | 22 April 2009 | Joseph M. Farley Nuclear Plant and Vogtle Electric Generating Plant - Annual Non-Radiological Environmental Operating Report for 2008 | |
NL-09-0410, Proposed Alternatives for the Fourth ISI Interval | 22 April 2009 | Proposed Alternatives for the Fourth ISI Interval | Dissimilar Metal Weld |
ML091170029 | 15 April 2009 | Discrimination Against a Southern Nuclear Company HVAC System Engineer for Reporting Nuclear Safety Concerns (OI Report No. 2-2007-037) | |
NL-09-0302, Cycle 23 Core Operating Limits Report | 15 April 2009 | Cycle 23 Core Operating Limits Report | Shutdown Margin |
IR 05000034/2009006 | 9 April 2009 | IR 0500034-09-006; on 01/26/2009 - 02/27/2009; Joseph M. Farley Nuclear Plant, Units 1 and 2; Component Design Basis Inspection | Ultimate heat sink Probabilistic Risk Assessment Significance Determination Process Time Critical Operator Action Battery sizing Maintenance Rule Program |
ML090921019 | 2 April 2009 | Summary of Public Meeting with Southern Nuclear Operating Company, Inc., to Discuss Nrc'S Reactor Oversight Process (ROP) & Nrc'S Annual Assessment of Plant Safety Performance at Joseph M. Farley for Period of 01/01/2008 - 12/31/2008 |