Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
PNO-III-09-005, A: Davis-Besse, Transitory Alert Due to Electric Device Failure (Update)29 June 2009PNO-III-09-005A: Davis-Besse, Transitory Alert Due to Electric Device Failure (Update)
ML09177063526 June 2009PNO-III-09-005: Davis-Besse, Transitory Alert Due to Electric Device Failure
ML09175035624 June 2009Acceptance Review E-mail for June 2, 2009 License Amendment Request
ML09168066117 June 2009Notice of Meeting with Firstenergy Nuclear Operating Company to Discuss NRC End-of-Cycle Assessment of Davis-Besse Performance for the 2008 Calendar Year
ML09168066817 June 2009Notice of Public Meeting to Discuss the 2008 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Station
ML09155042315 June 2009Request for Additional Information Related to Relief Requests for Alternative Dissimilar Metal Weld Repair Methods for Reactor Vessel Nozzles, Reactor Coolant Pump Nozzles, and Reactor Coolant PipingWeld Overlay
Dissimilar Metal Weld
ML09153015111 June 2009Request for Additional Information Related to Relief Requests for Alternative Dissimilar Metal Weld Repair Methods for Reactor Vessel Nozzles, Reactor Coolant Pump Nozzles, and Reactor Coolant PipingWeld Overlay
Nondestructive Examination
Finite Element Analysis
Dissimilar Metal Weld
ML10141051111 June 2009Offsite Dose Calculation Manual, Revision 23Grab sample
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
Process Control Program
Deep Dose Equivalent
IR 05000346/20095029 June 2009IR 05000346-09-502 on 05/11/2009 - 05/15/2009 for Davis-Besse, Baseline Emergency Preparedness Biennial Exercise InspectionSignificance Determination Process
L-09-143, License Amendment Request to Exclude Source Range Neutron Flux Instrument Channel Preamplifier from Channel Calibration Requirements of Technical Specification 3.3.9, Source Range Neutron Flux, & TS 3.9.2, Nuclear Instrumentation.2 June 2009License Amendment Request to Exclude Source Range Neutron Flux Instrument Channel Preamplifier from Channel Calibration Requirements of Technical Specification 3.3.9, Source Range Neutron Flux, & TS 3.9.2, Nuclear Instrumentation.Anticipated operational occurrence
Post Accident Monitoring
Probabilistic Risk Assessment
TAC:ME14052 June 2009
M090514, SRM-M090514 - Briefing on the Results of the Agency Action Review Meeting, 9:00 A.M., Thursday, May 14, 2009, Commissioners' Conference Room, One White Flint North, Rockville, Maryland (Open to Public Attendance)1 June 2009SRM-M090514 - Briefing on the Results of the Agency Action Review Meeting, 9:00 A.M., Thursday, May 14, 2009, Commissioners' Conference Room, One White Flint North, Rockville, Maryland (Open to Public Attendance)
ML0915201501 June 2009SRM-M090514 - Briefing on the Results of the Agency Action Review Meeting, 9:00 A.M., Thursday, May 14, 2009, Commissioners' Conference Room, One White Flint North, Rockville, Maryland (Open to Public Attendance)
L-09-125, Submittal of Annual Report of Changes to the Emergency Core Cooling System Evaluation Model and in the Application of the Model in Accordance with 10 CFR 50.46(a)(3)28 May 2009Submittal of Annual Report of Changes to the Emergency Core Cooling System Evaluation Model and in the Application of the Model in Accordance with 10 CFR 50.46(a)(3)
ML09336032627 May 2009Calculation, 0800368.320, Rev. 1, Optimized Weld Overlay Sizing for the 28 I.D. Outlet/Discharge Reactor Coolant Pump Nozzle.Weld Overlay
ML09147023326 May 2009Davis-Besse & Perry, Actions Required by Confirmatory Order EA-07-199
L-09-085, FENOC-Actions Required by Confirmatory Order EA-07-199, Completed26 May 2009FENOC-Actions Required by Confirmatory Order EA-07-199, Completed
ML09336032823 May 2009Calculation, 0800368.323, Rev. 1, Thermal and Unit Mechanical Stress Analyses for Reactor Coolant Pump Discharge Nozzle with Weld Overlay Repair.Weld Overlay
Hydrostatic
ML09336032722 May 2009Calculation, 0800368.322, Rev. 1, Finite Element Models of the Reactor Coolant Pump Discharge Nozzle with Weld Overlay Repair.Weld Overlay
Finite Element Analysis
L-09-130, Response to Request for Additional Information the 2008 Steam Generator Tube Inspections22 May 2009Response to Request for Additional Information the 2008 Steam Generator Tube Inspections
IR 05000346/200900621 May 2009IR 05000346-09-006; on 03/23/2009 - 04/10/2009; Davis-Besse Nuclear Plant, Routine Biennial Problem Identification and Resolution InspectionPast operability
Condition Adverse to Quality
Significance Determination Process
L-09-033, FENOC, EA-03-214, Completion of Actions Required by Confirmatory Order for Davis-Besse Power Station12 May 2009FENOC, EA-03-214, Completion of Actions Required by Confirmatory Order for Davis-Besse Power Station
ML0912605496 May 2009Acceptance Review for Davis-Besse LAR and Request for Exemption
ML09148034230 April 2009Combined Annual Radiological Environmental Operating Report for 2008Safe Shutdown
Boric Acid
High winds
Offsite Dose Calculation Manual
Zebra Mussel
Annual Radiological Environmental Operating Report
Process Control Program
Deep Dose Equivalent
Chernobyl
Fuel cladding
Tritium
ML09113005024 April 2009RAI Related to the 2008 Steam Generator Tube Inspections
ML09113061724 April 2009Biweekly Notice, Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards ConsiderationsSafe Shutdown
Fitness for Duty
Shutdown Margin
Post Accident Monitoring
IR 05000346/200900223 April 2009IR 05000346-09-002, on 1/1/09 - 3/31/09, Davis-Besse Nuclear Power Station, Maintenance Effectiveness, Identification and Resolution of ProblemsHigh winds
Enforcement Discretion
Temporary Modification
Tornado-Generated Missile
Significance Determination Process
Process Control Program
Maintenance Rule Program
Fire Protection Program
Downpower
Power Uprate
Measurement Uncertainty Recapture
ML10362002823 April 20092009/04/23-Exhibit 39. Proposed Offshore Wind Projects in the Great Lakes
ML10362001223 April 20092009/04/23-Exhibit 15. Draft Siting Principles and Policy Options for Wind Development on the Great Lakes April 23 Draft
ML09336032421 April 2009Calculation, 0800368.301, Rev 0, Material Properties for Davis-Besse Unit 1, RCP Suction, RCP Discharge, Cold Leg Drain and Core Flood Nozzles Preemptive Weld Overlay Repairs.Weld Overlay
Finite Element Analysis
TAC:ME112715 April 2009
L-09-072, License Amendment Request to Incorporate the Use of Alternate Methodologies for Development of Reactor Pressure Vessel Pressure-Temperature Limit Curves and Request for Exemption from Certain Requirements Contained in 10 Cfr.15 April 2009License Amendment Request to Incorporate the Use of Alternate Methodologies for Development of Reactor Pressure Vessel Pressure-Temperature Limit Curves and Request for Exemption from Certain Requirements Contained in 10 Cfr.Safe Shutdown
Shutdown Margin
Offsite Dose Calculation Manual
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Nondestructive Examination
Pressure and Temperature Limits Report
Annual Radiological Environmental Operating Report
Process Control Program
Exemption Request
Fire Protection Program
ML09105067415 April 2009E-mail Acceptance Review Results for Beaver Valley, Unit Nos. 1 and 2, Davis Besse Nuclear Power Station, and Perry Nuclear Power Plant License Amendment Request
IR 05000346/200940210 April 2009IR 05000346-09-402, (Drs), on 03/05/2009 - 03/06/2009, for Davis-Besse, Routine Security Baseline Inspection - Cover LetterAffidavit
ML0933603258 April 2009Calculation, 0800368.311, Rev. 0, Design Loads for the 28 I.D. Reactor Coolant Pump (RCP) Suction and Discharge Nozzles.Weld Overlay
ML11126A0897 April 2009Drawing No. LR-OS002, Revision 1, Operational Schematic Makeup and Purification System.
ML11126A0717 April 2009Drawing No. LR-M034, Revision 1, Piping & Instrument Diagram Emerg. Core Cooling System Ctmt. Spray & Core Flooding Systems.
ML1025108087 April 2009Drawing OS-002, Sheet 4, Revision 20, Operational Schematic Makeup and Purification System.
ML1025107447 April 2009Drawing M-034, Rev. 65, Piping & Instrument Diagram Emerg. Core Cooling System Ctmt. Spray & Core Flooding Systems.
ML0909604306 April 200909 Davis-Besse Re Confirmation of Initial License Examination
ML0909801142 April 2009Lessons Learned Task Force Action Plan April 2009 - PublicBoric Acid
Hydrostatic
VT-2
Pressure Boundary Leakage