Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML091800528 | 29 June 2009 | Acceptance Review Email License Amendment Request to Revise Technical Specifications 5.5.9 and 5.6.9 | |
ML091760657 | 23 June 2009 | Response Email- Ltr. from Amararu Isukul (Information on Radioactive Waste for Selected Npps) | |
NEI 09-01, Acceptance Review Email, Emergency Plan Changes to Implement Nuclear Energy Institute (NEI) 99-01, Revision 5, Methodology for the Development of Emergency Action Levels (TAC Nos. ME1304 and ME1305) | 18 June 2009 | Acceptance Review Email, Emergency Plan Changes to Implement Nuclear Energy Institute (NEI) 99-01, Revision 5, Methodology for the Development of Emergency Action Levels (TAC Nos. ME1304 and ME1305) | |
ML091690395 | 18 June 2009 | Acceptance Review Email, Emergency Plan Changes to Implement Nuclear Energy Institute (NEI) 99-01, Revision 5, Methodology for the Development of Emergency Action Levels | |
ML091680743 | 17 June 2009 | Closure of Investigation (OI 4-2008-061) | |
ML091600422 | 16 June 2009 | Decontrolled Letter, Dam Safety Inspection Report for Safe Shutdown Impoundment Dam Prepared by Federal Energy Regulatory Commission, Results of April 6, 2009 Inspection | Safe Shutdown |
ML091750780 | 16 June 2009 | Non-Disclosure Affidavits for Karen Hadden, Eliza Brown and Robert V. Eye | |
Press Release-IV-09-021, NRC to Discuss 2008 Performance Assessment for Comanche Peak Nuclear Power Plant June 30 | 15 June 2009 | Press Release-IV-09-021: NRC to Discuss 2008 Performance Assessment for Comanche Peak Nuclear Power Plant June 30 | |
ML091700026 | 12 June 2009 | Comment (1) of T. A. Moser, on Behalf of Strategic Teaming & Resource Sharing (Stars) Alliance, on Draft Regulatory Guide DG-1211, Materials and Inspections for Reactor Vessel Closure Studs. | |
CP-200900748, Comanche Peak - License Amendment Request 09-007, Model D5 Steam Generator Alternate Repair Criteria | 8 June 2009 | Comanche Peak - License Amendment Request 09-007, Model D5 Steam Generator Alternate Repair Criteria | Post Accident Monitoring Nondestructive Examination |
ML091670154 | 8 June 2009 | Comanche Peak - License Amendment Request 09-007, Model D5 Steam Generator Alternate Repair Criteria | Post Accident Monitoring Nondestructive Examination |
ML091590563 | 8 June 2009 | Notice of Public Meeting with Luminant Generation to Discuss Performance Results of the Comanche Peak Steam Electric Station for the Period of January 1 Through December 31, 2008 | |
Press Release-09-099, Licensing Board to Hear Oral Arguments June 10-11 in Granbury, Texas, on Comanche Peak New Nuclear Reactor Application | 1 June 2009 | Press Release-09-099: Licensing Board to Hear Oral Arguments June 10-11 in Granbury, Texas, on Comanche Peak New Nuclear Reactor Application | |
CP-200900748, WCAP-17072-NP, Rev. 0, H*: Alternate Repair Criteria for the Tubesheet Expansion Region in Steam Generators with Hydraulically Expanded Tubes (Model D5) | 31 May 2009 | WCAP-17072-NP, Rev. 0, H*: Alternate Repair Criteria for the Tubesheet Expansion Region in Steam Generators with Hydraulically Expanded Tubes (Model D5) | Hydrostatic Finite Element Analysis |
TAC:ME1446 | 31 May 2009 | ||
TAC:ME1304 | 28 May 2009 | ||
CP-200900751, Supplement to the Proposed Emergency Plan Change to Implement NEI 99-01, Revision 5, Emergency Action Levels (Eals) | 28 May 2009 | Supplement to the Proposed Emergency Plan Change to Implement NEI 99-01, Revision 5, Emergency Action Levels (Eals) | |
CP-200900654, Denial of Finding in NRC Integrated Inspection Report 05000445/446 2009002 | 26 May 2009 | Denial of Finding in NRC Integrated Inspection Report 05000445/446 2009002 | High winds Significance Determination Process |
ML091760889 | 14 May 2009 | Ltr. from Amararu Isukul Waste Management for Future Generation of Uk | |
CP-200900707, Revision to Relief Request No. P-2 for the Units 1 & 2 Inservice Testing Plan for Pumps and Valves (ASME OM Code 1998 Edition, Through 2000 Addenda; Interval Start Date: August 3, 2004, Second Interval) | 14 May 2009 | Revision to Relief Request No. P-2 for the Units 1 & 2 Inservice Testing Plan for Pumps and Valves (ASME OM Code 1998 Edition, Through 2000 Addenda; Interval Start Date: August 3, 2004, Second Interval) | Safe Shutdown Probabilistic Risk Assessment |
ML091660422 | 11 May 2009 | Request for Additional Information Supplemental Responses to Generic Letter (GL) 2004-02 Dated 02/29/2008 and 11/26/2008 | Mission time Coatings |
ML091660410 | 11 May 2009 | E-mail Draft Request for Additional Information, Licensee'S Supplemental Responses Dated February 29 and November 26, 2008, to GL 2004-02 | |
ML091460584 | 11 May 2009 | Federal Emergency Management Agency'S Reclassification of an Offsite Deficiency Identified During the April 7, 2009, Exercise, as an Area Requiring Corrective Action | |
IR 05000445/2009301 | 8 May 2009 | Er 05000445-09-301, 05000446-09-301 on 03/30/09 - 04/14/09 for Comanche Peak, Units 1 and 2 | |
ML091280375 | 30 April 2009 | Offsite Dose Calculation Manual, (Odcm). Revision 28 | Safe Shutdown Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Power change |
CP-200900615, Transmittal of Year 2008 Radioactive Effluent Release Report | 30 April 2009 | Transmittal of Year 2008 Radioactive Effluent Release Report | Offsite Dose Calculation Manual |
CP-200900615, Comanche Peak, Units 1 and 2, Transmittal of Year 2008 Radioactive Effluent Release Report | 30 April 2009 | Comanche Peak, Units 1 and 2, Transmittal of Year 2008 Radioactive Effluent Release Report | Offsite Dose Calculation Manual |
CP-200900568, Comanche Park Steam Electric Station - Transmittal of Year 2008 Radiological Environmental Operating Report | 28 April 2009 | Comanche Park Steam Electric Station - Transmittal of Year 2008 Radiological Environmental Operating Report | Annual Radiological Environmental Operating Report |
ML091330362 | 28 April 2009 | Comanche Park Steam Electric Station - Transmittal of Year 2008 Radiological Environmental Operating Report | Annual Radiological Environmental Operating Report |
TAC:ME1027 | 27 April 2009 | ||
ML091170298 | 27 April 2009 | Acceptance Review Email, License Amendment Request, Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, to Add Surveillance Requirement 3.3.1.16 to Function 3 of Table 3.3.1-1 (TAC ME1027-28) | |
ML091170013 | 27 April 2009 | Acceptance Review Email, License Amendment Request, Modify Technical Specifications to Adopt TSTF-511, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 (TAC Nos. ME1002 & ME1003) | |
ML091140530 | 24 April 2009 | IR 05000445-09-002 and 05000446-09-002; Luminant Generation Company LLC; 01/01/2009 - 03/21/2009; Comanche Peak Steam Electric Station Units 1 and 2, Integrated Inspection Record | Safe Shutdown Boric Acid High winds Ultimate heat sink Stroke time Nondestructive Examination Significance Determination Process Control of Heavy Loads Power change |
ML091130617 | 24 April 2009 | Biweekly Notice, Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations | Safe Shutdown Fitness for Duty Shutdown Margin Post Accident Monitoring |
IR 05000445/2009002 | 24 April 2009 | IR 05000445-09-002 and 05000446-09-002; Luminant Generation Company LLC; 01/01/2009 - 03/21/2009; Comanche Peak Steam Electric Station Units 1 and 2, Integrated Inspection Record | Boric Acid High winds Ultimate heat sink Stroke time Nondestructive Examination Significance Determination Process Fire Protection Program Power change |
CP-200900530, (CPSES) - Submittal of the Annual Non-Radiological Environmental Operating Report for 2008 | 23 April 2009 | (CPSES) - Submittal of the Annual Non-Radiological Environmental Operating Report for 2008 | |
ML091120829 | 22 April 2009 | Federal Emergency Management Agency Offsite Deficiency Identified During the April 7, 2009, Biennial Emergency Preparedness Exercise | |
CP-200900593, Response to Request for Additional Information, 1RF13 Steam Generator Tube Inservice Inspection Report | 21 April 2009 | Response to Request for Additional Information, 1RF13 Steam Generator Tube Inservice Inspection Report | |
ML091390040 | 21 April 2009 | Cooperating Agency Participation for the Comanche Peak Nuclear Power Plant Corridor Environmental Impact Statement-USACE 2009-00030 | |
ML091070122 | 15 April 2009 | FEMA Deficiency Finding Letter Regarding Comache Peak NPP to Texas Division of Emergency Management Dated April 15, 2009 | |
ML091100508 | 15 April 2009 | Ltr to Jack Colley, Chief, Governor'S Division of Emergency Management and David L. Lakey, M.D., Texas Dept of State Health Srvs, from Gary Jones, Acting RA, U.S. Dept of Homeland Security, FEMA Region 6, 04/15/2009 | |
ML091030458 | 13 April 2009 | Acceptance Review E-mail, Application for Relief Request B-9 and B-8, and License Amendment Request to Add License Condition for Submittal of Inservice Inspection Info Per WCAP-16168 | |
TAC:ME0781 | 13 April 2009 | ||
TAC:ME0777 | 13 April 2009 | ||
CP-200900615, Comanche Peak, 2008 Radioactive Effluent Release Report, January 1, 2008 - December 31, 2008 | 9 April 2009 | Comanche Peak, 2008 Radioactive Effluent Release Report, January 1, 2008 - December 31, 2008 | Grab sample Offsite Dose Calculation Manual Process Control Program |
ML091280374 | 9 April 2009 | Radioactive Effluent Release Report, January 1, 2008 - December 31, 2008 | Grab sample Offsite Dose Calculation Manual Process Control Program |
CP-200900523, CP-2009-03 - Post Exam Submittal Letter | 9 April 2009 | CP-2009-03 - Post Exam Submittal Letter | |
CP-200900521, Eclectic Station, Unit 2 - Response to Request for Additional Information, 2RF10 Steam Generator Tube Inservice Inspection Report | 9 April 2009 | Eclectic Station, Unit 2 - Response to Request for Additional Information, 2RF10 Steam Generator Tube Inservice Inspection Report | |
ML090910442 | 8 April 2009 | Request for Additional Information Regarding Steam Generator Tube Inservice Inspections During the Thirteenth Refueling Outage | |
ML091050285 | 3 April 2009 | CP-2009-03 - Post Exam Analysis |