RIS 2003-08, Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure | 30 April 2003 7 November 2005 3 April 2008 | Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure Summary of Safeguards Information Requirements, Attachment 1 to NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure | Backfit |
RIS 2003-08, Protection of Safeguards Information from Unauthorized Disclosure | 30 April 2003 7 November 2005 3 April 2008 | Protection of Safeguards Information from Unauthorized Disclosure 2005/04/30-NRC Regulatory Issue Summary 2003-08 Protection of Safeguards Information from Unauthorized Disclosure Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure Summary of Safeguards Information Requirements, Attachment 1 to NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure | Backfit |
IR 05000261/2006006 | 30 June 2006 | IR 05000261-06-006, on 05/19/2006, Carolina Power & Light Company, Physical Security Baseline Inspection | Fitness for Duty |
RNP-RA/06-0059, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for the Pressurizer Safety Valve Indication | 29 June 2006 | Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for the Pressurizer Safety Valve Indication | Post Accident Monitoring |
RNP-RA/06-0008, Response to NRC Request for Additional Information Regarding Proposed Technical Specifications Changes to Section 3.3 | 26 June 2006 | Response to NRC Request for Additional Information Regarding Proposed Technical Specifications Changes to Section 3.3 | |
RNP-RA/06-0040, Response to NRC Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations. | 8 June 2006 | Response to NRC Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations. | Safe Shutdown Fire Barrier Hemyc Exemption Request Continuous fire watch |
RNP-RA/06-0046, Request for Technical Specifications Change to Section 3.5.2. Emergency Core Cooling System | 1 June 2006 | Request for Technical Specifications Change to Section 3.5.2. Emergency Core Cooling System | Fuel cladding |
RNP-RA/06-0028, Request for Technical Specifications Change Regarding Steam Generator Tube Integrity Using the Consolidated Line Item Improvement Process | 30 May 2006 | Request for Technical Specifications Change Regarding Steam Generator Tube Integrity Using the Consolidated Line Item Improvement Process | Shutdown Margin High Radiation Area Ultimate heat sink Offsite Dose Calculation Manual Post Accident Monitoring Nondestructive Examination Incorporated by reference Annual Radiological Environmental Operating Report Process Control Program Stress corrosion cracking Earthquake Pressure Boundary Leakage Unidentified leakage Operational leakage |
RNP-RA/06-0045, Radiological Environmental Operating Report - 2005 | 12 May 2006 | Radiological Environmental Operating Report - 2005 | Offsite Dose Calculation Manual Missed surveillance Annual Radiological Environmental Operating Report |
ML061320253 | 1 May 2006 | Unit 2; Application for Authorized Use of Delta Protection Mururoa Single Use, Supplied-Air Suits, Models V4 F1 and V4 MTH2 | Mururoa |
IR 05000261/2006002 | 30 April 2006 | IR 05000261-06-002, 01/01/2006 - 03/31/2006, Carolina Power and Light Company; H.B. Robinson Steam Electric Plant, Unit 2; Maintenance Effectiveness | Fire Barrier Temporary Modification Significance Determination Process Operability Determination |
RNP-RA/06-0034, Annual Radioactive Effluent Release Report | 25 April 2006 | Annual Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Fuel cladding Tritium Exclusive Use |
RNP-RA/06-0038, 2005 Annual Radioactive Effluent Release Report Supplement - ODCM | 25 April 2006 | 2005 Annual Radioactive Effluent Release Report Supplement - ODCM | Time of Discovery Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Recently irradiated fuel Power change |
ML061140256 | 24 April 2006 | Public Meeting Summary - Category One Management Meeting H. B. Robinson, Unit 2 | |
ML061230558 | 20 April 2006 | Submittal of Licensee Annual Financial Report | License Renewal Power Uprate |
ML061230485 | 20 April 2006 | Progress Energy, Submittal of Licensee Annual Financial Report | License Renewal Power Uprate |
ML061220627 | 20 April 2006 | Progress Energy - Evidence of Guarantee of Payment of Deferred Premiums | |
ML061080522 | 11 April 2006 | H. B. Robinson, Unit 2 - Request for Technical Specification Change to Core Operating Limits Report References | Affidavit |
TAC:MD1358 | 11 April 2006 | | |
Press Release-II-06-019, NRC to Discuss 2005 Performance at Robinson Nuclear Plant | 11 April 2006 | Press Release-II-06-019: NRC to Discuss 2005 Performance at Robinson Nuclear Plant | |
RNP-RA/06-0030, Report of Changes Pursuant to 10 CFR 50.59 | 7 April 2006 | Report of Changes Pursuant to 10 CFR 50.59 | Safe Shutdown Turbine Missile Overspeed trip |
RNP-RA/06-0033, Transmittal of Technical Specifications Bases Revisions | 6 April 2006 | Transmittal of Technical Specifications Bases Revisions | Grab sample Anticipated operational occurrence Hydrostatic Fuel cladding Pressure Boundary Leakage Recently irradiated fuel Offsite Circuit Unidentified leakage Operational leakage |
ML061140260 | 4 April 2006 | Public Meeting Slides - Category One Management Meeting H. B. Robinson, Unit 2 | Safe Shutdown B.5.b Hemyc Siren |
RNP-RA/06-0014, Response to NRC Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power | 3 April 2006 | Response to NRC Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power | Safe Shutdown Operability Determination Power change |