ML061140256

From kanterella
Jump to navigation Jump to search
Public Meeting Summary - Category One Management Meeting H. B. Robinson, Unit 2
ML061140256
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 04/24/2006
From: Fredrickson P
NRC/RGN-II/DRP/RPB4
To: Moyer J
Carolina Power & Light Co
Shared Package
ML061140252 List:
References
Download: ML061140256 (4)


Text

April 24, 2006 Carolina Power and Light Company ATTN: Mr. John Moyer Vice President - Robinson Plant H. B. Robinson Steam Electric Plant Unit 2 3851 West Entrance Road Hartsville, SC 29550

SUBJECT:

PUBLIC MEETING

SUMMARY

- CATEGORY ONE MANAGEMENT MEETING H. B. ROBINSON STEAM ELECTRIC PLANT UNIT 2, DOCKET NO. 50-261

Dear Mr. Moyer:

This refers to the meeting conducted at your request at the Region II Office in Atlanta, Georgia on April 4, 2006. The purpose of the meeting was to discuss the overall plant performance and initiatives at Robinson Unit 2. Enclosed are a list of attendees and the presentation handouts.

The discussions focused on the following topics: Plant Performance & Recent Accomplishments, Engineering Projects, Regulatory Support, and Training. The meeting was informative and did not result in any specific action items or decisions.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this meeting, please contact Mr. Son Ninh at (404) 562-4532.

Sincerely,

/RA/

Paul E. Fredrickson, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No. 50-261 License No. DPR-23

Enclosures:

1. List of Attendees
2. Handout - Robinson Unit 2 NRC Presentation

CP&L 2

cc w/encl:

William G. Noll Director, Site Operations Carolina Power & Light Company H. B. Robinson Steam Electric Plant Electronic Mail Distribution Daniel G. Stoddard Plant General Manager Carolina Power & Light Company H. B. Robinson Steam Electric Plant Electronic Mail Distribution Chris L. Burton, Manager Performance Evaluation and Regulatory Affairs CPB 9 Electronic Mail Distribution C. T. Baucom, Supervisor Licensing/Regulatory Programs Carolina Power & Light Company H. B. Robinson Steam Electric Plant Electronic Mail Distribution J. F. Lucas, Manager Support Services - Nuclear Carolina Power & Light Company H. B. Robinson Steam Electric Plant Electronic Mail Distribution Henry J. Porter, Director Div. of Radioactive Waste Mgmt.

Dept. of Health and Environmental Control Electronic Mail Distribution R. Mike Gandy Division of Radioactive Waste Mgmt.

S. C. Department of Health and Environmental Control Electronic Mail Distribution Beverly Hall, Acting Director Division of Radiation Protection N. C. Department of Environment, Health and Natural Resources Electronic Mail Distribution David T. Conley Associate General Counsel - Legal Dept.

Progress Energy Service Company, LLC Electronic Mail Distribution John H. O'Neill, Jr.

Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128 Chairman of the North Carolina Utilities Commission c/o Sam Watson, Staff Attorney Electronic Mail Distribution Robert P. Gruber Executive Director Public Staff - NCUC 4326 Mail Service Center Raleigh, NC 27699-4326 Public Service Commission State of South Carolina P. O. Box 11649 Columbia, SC 29211 Distribution (See page 3)

OFFICE DRP:RII SIGNATURE SON NAME SNinh:rcm DATE 04/21 /2006 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO

LIST OF ATTENDEES Nuclear Regulatory Commission W. Travers, Regional Administrator, Region II (RII)

L. Plisco, Deputy Regional Administrator, RII H. Christensen, Deputy Director, Division of Reactor Safety K. Landis, Acting Director, Division of Reactor Projects (DRP), RII R. Hagar, Senior Resident Inspector, Robinson Reactor Projects Branch 4, DRP, RII Carolina Power and Light T. Walt, Site Vice President. Robinson D. Stoddard, Plant General Manager C. Church, Operations Manager G. Ludlam, Training Manager J. Lucas, Manager, Support Services C. Baucom, Licensing Supervisor