Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML061600023 | 20 June 2006 | FRN: General Notice, Letter a, Issuance of Order EA-06-137. Requiring Compliance with Key Radiological Protection Mitigation Strategies | B.5.b Mitigating Strategies |
ML061600076 | 20 June 2006 | FRN: General Notice, EA-06-137 Enclosure, Order Modifying Licenses (Effective Immediately) | B.5.b Mitigating Strategies |
ML061600087 | 20 June 2006 | FRN: General Notice, Order EA-06-137, Attachment 1-A List of Licensees | |
ML061740574 | 20 June 2006 | Summary of Meeting with Energy Northwest Regarding Columbia Generating Station | |
GO2-06-092, Supplemental Response to Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power. | 15 June 2006 | Supplemental Response to Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power. | Offsite Circuit |
ML061710592 | 12 June 2006 | Columbia Station - Cycle 18 Core Operating Limits Report, Revision 2 | Anticipated operational occurrence Feedwater Controller Failure |
GO2-08-090, Columbia Station - Cycle 18 Core Operating Limits Report, Revision 2 | 12 June 2006 | Columbia Station - Cycle 18 Core Operating Limits Report, Revision 2 | Anticipated operational occurrence Feedwater Controller Failure |
GO2-06-086, Response to Generic Letter 2006-003, Potentially Nonconforming Heymc and MT Fire Barrier Configurations. | 9 June 2006 | Response to Generic Letter 2006-003, Potentially Nonconforming Heymc and MT Fire Barrier Configurations. | Safe Shutdown Fire Barrier Hemyc |
GO2-06-087, Response to Inspection Report 05000397-06-002 | 9 June 2006 | Response to Inspection Report 05000397-06-002 | |
ML061590167 | 8 June 2006 | 06-01-06 Summary of Meeting with Energy Northwest Regarding Columbia Generating Stations End-of-Cycle Assessment | |
GO2-06-084, Notification of NPDES Permit Renewal | 6 June 2006 | Notification of NPDES Permit Renewal | Biofouling |
GO2-06-082, Notification of Deviation from Boiling Water Reactor Vessel Internals Project (BWRVIP) Program Element | 31 May 2006 | Notification of Deviation from Boiling Water Reactor Vessel Internals Project (BWRVIP) Program Element | EVT-1 |
ML061510030 | 30 May 2006 | Notice of Public Meeting with Energy Northwest Columbia Generating Station | |
Press Release-IV-06-013, NRC to Discuss 2005 Performance at Columbia Generating Station | 24 May 2006 | Press Release-IV-06-013: NRC to Discuss 2005 Performance at Columbia Generating Station | |
GO2-06-081, Request for Use of Higher Assigned Protection Factors with Use of French-Designed Air-Line Respirator Equipment | 22 May 2006 | Request for Use of Higher Assigned Protection Factors with Use of French-Designed Air-Line Respirator Equipment | Mururoa |
GO2-06-080, Proposed Amendment of Facility Operating License to Remove Operating Mode Restrictions for Performing Emergency Diesel Generator Surveillance Testing | 22 May 2006 | Proposed Amendment of Facility Operating License to Remove Operating Mode Restrictions for Performing Emergency Diesel Generator Surveillance Testing | Safe Shutdown Reactor Vessel Water Level Fuel cladding Offsite Circuit |
ML063540359 | 15 May 2006 | Generation Station - 11-2006 - Operating Exam As-Given | High Radiation Area Half scram Squib Job Performance Measure Scram Discharge Volume Power change |
ML061320272 | 12 May 2006 | IR 05000397-06-002 on 1/1/06 - 3/31/06 for Columbia Generating Station; Operability Evaluations, Other Activities | Safe Shutdown Reactor Vessel Water Level Loop seal Safe Shutdown Earthquake Condition Adverse to Quality Significance Determination Process Earthquake Maintenance Rule Program |
GO2-06-073, Transmittal of Columbia Generating Station, 2005 Annual Radiological Environmental Operating Report | 11 May 2006 | Transmittal of Columbia Generating Station, 2005 Annual Radiological Environmental Operating Report | Annual Radiological Environmental Operating Report |
ML061310506 | 11 May 2006 | Notice of Meeting with Energy Northwest Columbia Generating Station end-of-cycle Performance Assessment | |
ML061280620 | 8 May 2006 | Letter to Tim Hope Implementation of NUREG 1022 Revision 2 Guidance Regarding the Reportability of Loss of Shutdown Cooling | |
ML061280507 | 8 May 2006 | Ltr to James Mullen, Director, Emergency Mgmt. Div., Washington Military Dept., from Bruce S. Mallett, RA, Riv, NRC Participation in the Columbia Generating Station Evaluated Exercise on September 12, 2006, 05/08/2006 | |
ML061280483 | 8 May 2006 | Ltr to Gary Robertson, Director Div. of Rad. Prot., Dept of Health, from Bruce S. Mallett, RA, Riv, NRC Participation in the Columbia Generating Station Evaluated Exercise on September 12, 2006, 05/08/2006 | |
ML061280448 | 8 May 2006 | Ltr to J. V. Parrish, CEO, Energy Northwest from Bruce S. Mallett, RA, Riv, NRC Participation in the Columbia Generating Station Evaluated Exercise on September 12, 2006, 05/08/2006 | |
ML071570274 | 5 May 2006 | Generation Station - 11-2006 - Draft Operating Exam | High Radiation Area Half scram Operating Basis Earthquake Squib Job Performance Measure Earthquake Power change |
ML061280346 | 5 May 2006 | Generation Station - 12-2006 - Corporate Notification Letter | |
GO2-06-064, Annual Environmental Operating Report | 28 April 2006 | Annual Environmental Operating Report | |
GO2-06-065, Annual Report of Individual Monitoring | 28 April 2006 | Annual Report of Individual Monitoring | |
GO2-06-062, Correction to Third Ten-Year Interval Inservice Inspection Program Plan | 27 April 2006 | Correction to Third Ten-Year Interval Inservice Inspection Program Plan | |
IR 05000397/2006010 | 26 April 2006 | IR-05000397-06-010, on 03/13/2006 - 03/23/2006; Columbia Generating Station. Inspection Procedure 95001 Supplemental Inspection | Significance Determination Process |
ML071570402 | 18 April 2006 | Generation Station - 11-2006 - Public Forms; Examination Assignment | |
GO2-06-061, Request for Amendment to Technical Specifications Surveillance Requirements for the Suppression Chamber-to-Drywell Vacuum Breakers and the Drywell-to-Suppression Chamber Bypass Leakage Test | 18 April 2006 | Request for Amendment to Technical Specifications Surveillance Requirements for the Suppression Chamber-to-Drywell Vacuum Breakers and the Drywell-to-Suppression Chamber Bypass Leakage Test | |
GO2-06-059, License Amendment Request to Adopt Origen-ARP for Calculating Fuel Pool Decay Heat Load | 17 April 2006 | License Amendment Request to Adopt Origen-ARP for Calculating Fuel Pool Decay Heat Load | Functionality Assessment Recently irradiated fuel |
GO2-06-060, Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers (TSTF-372) Using the Consolidated Line Item Improvement Process | 17 April 2006 | Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers (TSTF-372) Using the Consolidated Line Item Improvement Process | Time of Discovery Incorporated by reference |
TAC:MD1226 | 17 April 2006 | ||
ML061000672 | 14 April 2006 | License Amendment, Extends the Required Action Completion Times (CT) Specified in TS 3.8.1, AC Sources - Operating, to Restore an Inoperable DG to Operable Status from the Current 72 Hours to 14 Days | Safe Shutdown High winds Mission time Anticipated operational occurrence Enforcement Discretion Probabilistic Risk Assessment Qualified Offsite Circuit Tornado Generated Missile Missed surveillance Large early release frequency Maintenance Rule Program Offsite Circuit Fire Protection Program |
IR 05000397/2006009 | 12 April 2006 | NRC Supplemental Inspection Report 05000397-06-009 | |
ML060950401 | 3 April 2006 | Director Office of Inspection & Enforcement Reference: 10 CFR 21 Notification of 3/30/06 Rev1 |